Loading...
Four Seasons 1-CS 911220PACHECO KOtzH Consulting Engineers, Inc. December 20, 1991 PK No: 1030-90.039 Mr. Kenneth Griffin City of Coppell 255 Parkway Blvd Coppell, Texas 75019 Re: Four Seasons Site, Coppell, Texas Dear Mr. Griffin: Enclosed for your review is a sketch showing a proposed revision to the south drive which accesses the referenced site from Royal Lane. A review of the current approved drive layout indicates that the trucks which will be utilizing this drive in the future may have difficulty with the drive as currently proposed. We therefore wish to increase the size of the drive and the drive radii as shown on the attached sketch. We believe the drive width and radii shown on the sketch are within the allowable range which is acceptable to the City. We also propose to indicate this revision on the "As-Built" plans to be submitted at the completion of the project. Please review this request and notify me with any comments or questions you may have. The contractor is planning to construct the modification to this drive as soon as possible, so your prompt response is appreciated. If you have any questions regarding this matter, please do not hesitate to call me. JAK/tbj 1030-70 Mr. John Fisher, Natcon Mr. Ray Garrison, WSI Mr. Subash Gaitonde Sincerely, Koch, Jr., P.E. Architects, Inc 9401 I.,BI Freeway · Suite 300 * Dallas, Texas 75243 · (214) 235-3031 * Fax (214) 235-9544 · : :' HEADWALL FND. ,51 g ! -25' B-B CONCo PVMT · . ::::::.' . .:.::.:.' ..:........ .- COl' ST( NO.