Loading...
FS9901-SY 990405Ill Halff Associates ENGINEERS * ARCHITF, L'TS · SCIENTISTS PLANNERS · SURVEYORS 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 (214} 346-6200 FAX (214} 739-0095 April 27, 1999 17669 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/Director of Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 R.E: Application for Corridor Development Certificate - Windsor Estates, City of Coppell, Texas Dear Mr. Griffin: Please find attached 2 additional copies of the Corridor Development Certificate (CDC) for Windsor Estates in the City of Coppell, Texas, which you requested. At this time, we would like to postpone the preparation of the Conditional Letter of Map Revision (CLOMR) application until the U.S. Army Corps of Engineers {COE) has reviewed the complex hydraulics at the Elm Fork/Denton Creek confiuence. After that review and revisions as necessary, the CLOMR application can be prepared and forwarded to the Federal Emergency Management Agency (FEMA) with a note confirming COE review and approval. If you have any questions or comments, please call me at 214-346-6220 or Russell Erskine at 214-346-6225. Sincerely, HALFF ASSOCIATES, INC. Walter E. Skipwith, P.E. Vice-President Enclosures cc: Mr. Kelly Jordan Files DALLAS * FORT WORTH · HOUSTON * IVlcALLEN TRANSPORTATION * WATERRESOURCES * LAND DEVELOPMENT * MUNICIPAL * ENVIRONMENTAL * STRUCTURAL MECHANICAL * ELECTRICAL * SURVEYING * GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE · LANDSCAPE ARCHITECTURE · PLANNING I Halff Associates ENGINEERS · ARCHITECTS · SCIENTISTS PLANNERS · SURVEYORS 8616 NORTHWEST PLAZA DRIVE DALLAS, TEXAS 75225 (214) 346-6200 FAX (214) 739-0095 April 2, 1999 AVO 17669 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/Director of Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 Re: Application for Corridor Development Ce~ificate- Windsor Estates, City of Coppe!l, Texas This letter accompanies a Con~dor Development Certificate application for Windsor Estates, a 15.8 acre site on Denton Creek located at the end of existing Deforest Road. The site is intended to be developed as a single family residential subdivision. The site is located within the Denton Creek flood plain. A potion of the flood phin (8.4 acres) is proposed to be reclaimed by fill. Impacts of the proposed reclamation will be offset by construction of a proposed swale and pond within the 15.8 acre site. Please review in accordance with City of Coppell Flood Plain regulations end Corridor Development Certificate criteria. ff additional information or review fees are needed, please call me at 214-346-6220 or Russell Ersldne at 214-346-6225. Sincerely, Walter E. Skipwith, P.E. Vice-Pmiident Enclosures. cc Mr. Kelly Jordan Files DALLAS * FORTWOFfll'I · HOUSTON, McALLEN TRANSPORTATION · WATER RESOURCES · LAND DEVELOPMENT · Iv~INICIPAL · ENVIRONMENTAL. STRUCTURAL MECHANICAL ° ELECTRICAL , SURVEYING · GEOGRAPHIC INFORMATION SYSTEM8 ARCHffECTURE · LANDSCAPE ARCHITECTURE · PLANNING Corridor Development Certificate Application for Windsor Estates on Denton Creek y x 8611 InC. AVO Apr, l 1~99 HALFF ASSOCIATES, INC .. ENGINEERS · ARCHITECTS · PLANNERS. Windsor Estates Corridor Development Certificate Table of Contents I. Project Description A. General B. Stream Description C. Existing Conditions D. Revised Existing Conditions E. Proposed Conditions F. Results G. Permits H. Corridor Development Certificate Forms IH. Tables IV. Figures V. Appendices Appendix A Appendix B Appendix C Appendix D Photographs Revised Existing Conditions 1. Model Output (HEC-2) 2. Cross-sections (HEC-RAS) Proposed Conditions 1. Model Output (HEC-2) 2. Cross-sections (I-IEC-RAS) Digital HEC-2 and HEC-RAS Input Data Files on Diskette Page# 1 1 1 2 2 3 3 Table 1 Table 2 Table 3 Table 4 Table 5 List of Tables Water Surface Elevations (Existing Conditions vs. Revised Existing Conditions) Velocities (Existing Conditions vs. Revised Existing Conditions) Water Surface Elevations [Revised Existing Conditions vs. Proposed Conditions) Velocities (Revised Existing Conditions vs. Proposed Conditions) Water Surface Elevations vs. Levee Elevation PROJECT DESCRIPTION Engineering Study in Support of a Corridor Development Certificate for an 15.8 Acre Site Adjacent to Denton, Creek in Coppert, Texas General This study was undertaken to provide the necessary technical data for approval of a Corridor Development Certificate (CDC) for a 15.8 acre site on Denton Creek in the City of Coppell, Dallas County, Texas, as shown on Figure 1. The project is appwximately 3. l0 miles upstream from the confiuence of Denton Creek with the Elm Fork of the Trinity River, and extends upstream appwximately 0.31 miles. Under the 1992 Upper Trinity River Corridor CDC Zone mapping and the City of Coppell, the site is considered to be in the CDC Regulatory Zone. Stream Description Denton Creek is one of the major streams in the North Central Texas Area. It and its tributaries drain 719 square miles with 695 square miles of drainage area being controlled by the dam at Lake Grapevine. Below the dam, Denton Creek flows in a easterly direction through the Cities of Grapevine, Lewisville, Carrollton, and Coppell before outfalling into the Elm Fork of the Trinity River just above Sandy Lake Road. Denton Creek in the project area is approximately 110 ft wide (bank to bank) at the downstream end, and approximately 520 feet at the upstream end. Due to the proximity to the Elm Fork of the Trinity River, the flood plain is wide and relatively fiat. For example, ground elevations nearest the creek are higher than the surrounding flood plain due to the natural levee building process the creek once had before Lake Grapevine was built. Other characteristics show that the creek has eroding banks or side slopes, as well as, a mature stand of trees along the banks. Water quality is relatively good. Photographs of the area can be found in Appendix A. Existing Conditions Denton Creek drains approximately 24 square miles (not including the area above Lake Grapevine) at the pwject site. Based on a fully developed watershed for this aru, the 100-year flood discharge is 23083 cfs. This discharge was developed by Kimley- Hem and Associates in January 1990, using the U.S. Army Corps of Engineers HEC-1 computer model, and is also noted in the January 1991 report titled City Wide Storm Water Management Study for the City of Coppell, Texas, prepared by Albert H. Halff Associates, Inc. Discharges for the 500-year flood (fully developed watershed) or for the Standard Project Flood {SPF) has not been determined for Denton Creek. The existing conditions hydraulic c0mput~r model used in this study is that which was developed for the Cambridge Manor Estates LOMR dated March 29, 1995, by Dowdey, Anderson and Associates, Inc. Revised Existing Conditions To reflect current (1999) conditions, revisions to the existing conditions hydraulic model were required. Cwss-sections had to be added downstream and through the study area to better analyze the pwposed development. Left overbank topographic information for cross-sections 0 through 14 was taken from topography associated with the Trinity River. Channel data was taken from information provided by the Corps of Engineers except for cwss sections 13 and 14 which used FEMA information. The right overbank information is taken from both existing Trinity River topography (cross-sections 0 through 2) and from new City of Coppell topography (cross-sections 3 through 14). Cross-section topography modeled in sections above 14 were not altered. Other changes made to create the revised existing conditions model, were the split flow analysis at the road leading to the Dallas Gun Club. This road functions as a weir (cross-sections 0 through 12), and flow over the road would join the Elm Fork - Trinity River flood plain. Also, ineffective flow areas on the left overbank were added for cross- sections 10 through 14, and cwss-sections 18440 and 19330 were eliminated. A comparison between water surface elevations and velocities area shown on Table 1 and 2, respectively. Model output and HEC-RAS cross-sections (for revised existing conditions only) can be found in Appendix B. Figure 2 shows a detailed overview of the Denton Creek reach in which changes were made. Proposed Conditions The proposed pwject consist of filling a portion of the 15.8 acres with fill for the purpose of developing single family lots. A swale and a pond are proposed to offset conveyance losses, maintain water surface elevations, and provide valley storage. See Figure 3 for a detailed schematic of the pwposed pwject area. For proposed conditions, the revised existing conditions HEC-2 model was altered in the following manner. Cwss-sections 6 and 7 were changed to reflect a pwposed pond with a normal pool elevation of 447, and with ineffective flow limits near the existing banks of the creek. Cross-sections l0 through 12 were changed to reflect a swale with a bottom elevation of 448.2 and with side slopes of 4:l and 6:1. And cwss-sections 9 and 13 were changed to reflect fill at various slopes greater than 4;1. Manning's "n" values in the stream and right overbank were changed at all cress-sections between 6 and 13 to reflect proposed conditions. Due to the proposed development, the ineffective flow limits were changed to a location closer to the creek on cross-section 14. A split flow analysis was prepped, The resulting Denton Creek flood discharges from the revised existing conditions model were also used in the proposed conditions model. A comparison of water surface elevations and velocities for revised existing conditions and proposed conditions can be found in Tables 3 and 4, respectively. Also, a table (Table 5) has been included to show proposed water surface elevations as compared to the elevation of the levee located North of Denton Creek (left overbank) from cross- section 19930 to the end of the model. Model output and HEC-RAS cross-sections can be found in Appendix C. Results Under proposed condition, there is no increase in the 100-year flood elevation (fully developed landuse). A maximum rise of a 0. 12 ft. occurs for the 500-year flood elevation (Flood Insurance Study discharge) would occur as a result of the proposed project. Valley storage was computed using standard embankment computation techniques. Valley storage losses at the 100-year flood level are 9.46% and 18.19% at the 500-year level. Corridor Development Certificate forms are located at the end of this report. Permits A Conditional Letter of Map Revision (CLOIVIR) application is currently being prepared for submittal to the Federal Emergency Management Agency. This application will be completed and forwarded to the appropriate review authorities upon approval of this submittal. CORRIDOR DEVELOPMENT CERTIFICATE FORMS [': STANDARD CDC FORM - PART I gi~l~Trs ~Zm~d~_'At fro be suppiild4~y CDC/Floodplain AdmiNsuam~ Adminisllm~lfkd'l!~s i. :-,tl4:: %ll'~k ... _ f'. · 1 - :-'1 j wilt' ' ' 2 (unless an exempci0e~ granwd)..lbs ffP.fom~ssd41mF. ll~ir- ... TIll IJ~diewG. fi~ "~ IE dR Fr..'ties designated on the ffYfonn.) Apldllam~ Reprssemta~ve.,. ld0lliff** person knowledg~ge of and amiKwiz~d-to. respond to questions conc~mis!l~ provided by tl~ Appik~m. Nmf. e:,~ Walter E. Skipwith, P. E. . Address:, 8t~,¢11l.. ~1 il. Jt;'Plazs :,.I~. Dallas, Tenas 75225 Telephone/fax/c-mail: (214} ,346~ ,/C214) 739~Jer~ / CDC Applicant: Kelly Jordan Property Own... Coppell OpttnnlS Asse~;s: Halff Associates Project Name: Windsor Estates Upper Trinity River F~msiblNt,/SMy Mapping GIld ID: MAi~CO and Location Rderenee: ' (l~eom~y~ Cepneit / Dallas l~ H~ :Associates. lnc. PfiljetlGik(e,l '~ ~ 1"L7~ IB, Deforest Rd. Location. Provide general ~ption of location. including gree~address, n~m~ero~street, and ida,lifted impacted V}ater bodies: Mapsco page 1B; end.of Deforest Rd.; MacAr~;hUr ~.Dsmton Greek 4. Site plan. (a) Please aUachl kl :: , 18 l/2a il). fT".' "itl't' f " ~ ,42-Ne (b) PI~~ ~I~:VI -(Ita,=c~ll). a: - ........... ONo 7. AppHeantrequemsan~w. mptl01wm'vadanee to ~ ~terit [:~rifs~ [] No [ Please attach iuppeling material ] F STANDARD CDC FORM - PART 2 Detailed Hydrologic/Hydraulic Information F F CD43T~COde~ . Site Plan. Please attach a detailed sif~ plan. Plans attadked: nO-Yes [::] Ne The scale ofproject plans shall IXovidc ,,a~ dr~l of the wit,~c p,~t ~ ,,Jl as indivMuSl features of the project. The plaint shodd :d~:rw f~he ~ of ~ ~ geguJatCty Roedway and ~he layout of cross-sections us~dinth~hydrau~_s~,~e! Proposedchang~stoth~shOuldl~o~,arly~aAvn~ LegaJ.provbionforcommun~,_..=nl~_: f~'fVJk:! i :~rIW--~t af' ~ IYes F STANDARD CDC FORM PART 2 - CONTINUED Hydrologic/Hydraulic Information 100 YEAR FLOOD EVENT hydraulic impac~ offhe proposed project: !)(sci~rges: Cbnnnd, yelod~es: Water~Ufface Elevation (NGVD): Please provide the following da~a to characterize the hydrologic and Pre-,P~o,~Ct Post-Project Change 230~3' cfs. N/A t{3{M)5' < ~ N/A * N/A Ktm].ey-Horn and Associates teport January 1990 L99 6.40 'fps... .6,za3 fl~;.. 453,29 ...... /+53,24 452,61 e.,, 452 ~ 56 ~L: 10..05 450,83 ft.. 450.82 t~~ - 0.01 453.37 fi' 453,33 ft - 0,04 453,41 ft. 453,37 453.53 'ft 453,50 ft - 0,03 453,52 IL ~453,49 .= ft. -0,03 450.59 ~ .L~O. 59 450,06 ft 450,05 ft. - 0,01 /~7,90 /~ 447,90 ft. O',O0 Hydrologic / Hydraulle fntpa. et Ul~tr~am B~Hm~. Downstream Bounda~. Source of discharge data: Date of discharge data: Ul~u~ma~medary: Downsu~am Boundmy (DB): 5~OfL upmream of UB: 1360ff. upst~am of UB: 1ZS, Ofi- upsn~am of lIB: 1 a do~slre..sm ~DB: ~. downstream of DB: 211L~% downsuesm orDB: Project Lands in 13.90 Floodplain: Valley Storage on , 4 3.4 3 Project ~ ~-~ds: 5,48 ~c. - 8.~2 39,32 he;it :'-4,11 9.46 The CDC applimien shall i.ehade lasts and ele~-~dc data fifes ~ ~ecunm hydraulic model .(HEC-RAS, obtained from the USAC~ of616is-sectiOnsit~' p~roj~ct and widl-project conditions. Water surface profiles for 100-year flood and Standard Project Flood for pre~project and with-projcct conditions should also be inclndnd. The number and location of sections should adequately describe and support documented computations. Cross section plots attached? e] yes 1:] No Cross section deeironic dato.llles included? !n Yes I'1 No Water surface prordes attached? f'l Y~s fii No * Note: Discharges fren split flow analysis. See report for more details. STANDARD CDC FORM PART 2 - CONTINUED 500 YEAR FIS FLOOD EVENT [: I: [ [ r r F E F F [. Upmum Boundary: Source of dilNalmele{IN~, Daeeofdi, scharllama:~ !C)9 ft. downstream of DB: /-~ ft. downsucam o[ DB: 1 ?~'~et- downsUeam of DIL 2850~ dowmtream ,Valley Seerage FLOOD EVENT ---* N/A 454.41 ~. 454.53 ft + 0.12 ~. 454.68 ft 454.79 ft +-O.1t~t" 454.64 ~ 454.76 fi, + 0.12 ft 451.27 ft 451.27 tk- 0.00 ft 450.62 fL 4~0.62 '~r '0.00 ft z~9.65 fi-" z~.65i,! ~,: :O,[lO ~.. 14~ 5.72'. ~ -~46~' -. number and location of sections should adequately de~ribe and supporl Croetseefion ldots attached? g3 Yes rl No Cro~s~welion eleelronk dam files induded? [1Yes O No Wear surface profiles attached? r'l Ym [ii No * Note: See previous STANDARD CDC FORM PART 2- CON-i~W3ED Flood Storage/Hydraulic Mitigation lost, ~ ~tigate rims ~ ~re ~. ~ ~ ~y for v~le7 stora~ m~ati~. Habitat/Wedand Midgad0n. If a Styion 404 permit is required, please idenilfy all habitat and/or land resource area Used for environmental mitigation purpo.~ on the site phn, and describe them in ~ space ~low: ~ Land Cover Inf0rma~n. Please pr~,ide the following data, in. t0~a~res,~0 charact~ize the impacts on current land cover which will result from consmtction ofthe proposed project: --- LAND COVER INFORMATION -- Land Use / Land Cover CLncs!0ea~on ** P.~eet =. I00 urban/built up ' 200 agricultural/pasture 300 rangdand/sh~ & bntsh 400 forest/woodlands 500 water (identify on site plan) 600 wetland (identify 700 barren land/mines & quarries ~r~d Aca,) rost-P~oJeet (Toed Acres9 9.61 11.63 ' 2.56 3.06 2.13 1.09 1.93 ** Note: L~td land cover ty/~s are 'l.~el 1' categoria (100 through 7~) ~ ~ ~ ~h ~ ~m ~ ~ ~r~ by t~ ~.S. A~y ~s of~g~e~ ~ ot~r ~g~to~ agent, To the b~tof my Imowledge, the intormadon im Pazt 2 Is4mmide4eand roecurate: Signal Applicanrs Re. prr~entati , Dat~ , Vi~e PreSiden~ ~; F F F F F F F F F F F F F F F F F F I'ABLE~ Water Surface Elevations 100 year ultimate and 500 year fis 0 0 1.1 1.1 2 2 3 3 4 4 5 5 6 6 7 7 9 9 10 10 18440 18'!.'!.0 I1 11 12 Table 1 Windsor Esiates Water Surface Elevations 100-Year Ultimate and 500-Year F.I~. 446.71 447.36 447.9 448.48 449.14 449.65 450.06 450.62 450.59 451.27 450.84 451.58 450.83 451.58 450.88 451.64 451.05 451.84 452.4 453.28 452.61 453.47 452.4 453.68 453.03 453.86 453.14 Table 1 Windsor Estates Water Surface Elevations 100-Year Ultimate and 500-Year F.I.S. 12 453.99 13 453.19 13 454.04 19330 452.53 19330 453.84 14 453.29 14 454.23 19930 452.53 453.37 19930 453.83 454.37 20980 452.57 453.41 20980 453.85 454.41 20990 452.57 453.41 20990 453.83 454.4 21260 452.7 453.53 21260 454.13 454.68 0.84 0.57 0.55 F 17 F F F 21635 * 453.52 21635 * 454.04 21045 * 453.53 21045 * 454.65 22370 * 453.78 22370 * 455.19 * Note: Existing Conditions Model shortened in the initial stages of project r~ Windsor Estates Channel Velocities 100-Year Ultimate and 500-Year F.I.S. F F 0 0 1.1 1.1 2 2 4 4 5 5 6 6 7 7 Table 2 Windsor Estates Channel Velocities 100-Year Ultimate and 500-Year F.LS. 4.76 4.88 2.98 2.98 5.53 5.81 6.2 6.89 6.78 7.59 5.93 6.51 6.4 6.95 6.72 7.2 8.24 8.9 F F 9 9 10 10 18440 18440 11 11 12 2.84 3.11 5.53 5.8 5.65 6.08 3.53 4.16 3.96 Table 2 Windsor Estates Channel Velocities 100-Year Ultimate and 500-Year F.LS. 12 5.13 19330 2.06 19330 2.65 13 3.58 13 5.06 14 2.95 14 4.11 19930 3.05 2.87 19930 4.09 4.04 20980 4.11 3.89 20980 5.84 5.69 20990 4.11 3.9 20990 5.95 5.75 21260 3.04 3.45 21260 5.2 5.02 21635 * 4.46 21635 * 6.53 21645 * 4.46 21645 * 6.53 22370 * 4.66 22370 * 6.56 No~: Existing Condi~o~ Model shortened in Me i~ smg~ of project. -0.18 -0.05 -0.22 -0.15 -0.21 -0.2 -0.19 -0.18 Table 3 Windsor Estates Water Surface Elevations 100-Year Ultimate and ~0-Year F.I~S. 0 446.71 446.71 0 0 447.36 447.36 0 I 447.9 447.9 0 I 448.48 448.48 0 1.1 449.14 449.14 0 1.1 449.65 449.65 0 2 450.06 450.05 -0.01 2 450.62 450.62 0 3 450.59 450.59 0 3 451.27 451.27 0 4 450.84 450.84 0 4 451.58 451.58 0 5 450.83 450.82 -0.01 5 451.58 451.57 .0.01 6 450.88 450.87 .0.01 6 451.64 451.61 .0.03 7 451.05 451.04 -0.01 7 45t.84 451.8 -0.04 9 452.4 452.34 .0.06 F 9 453.28 453.24 .0.04 F 10 452.61 452.56 -0.05 10 453.47 453.49 0.02 F 11 453.03 452.98 -0.05 11 453.86 453.96 0.1 ~ 12 453.14 453.09 -0.05 12 453.99 454.09 0.1 F 13 453.19 453.15 -0.64 F F F F F Table 3 Windsor Estates Water Surface Elevations 100-Year Ultimate and 500-Year F.kS. 13 454.04 454.16 0.12 14 453.29 453.24 -0.05 14 454.23 454.33 0.1 19930 453.37 453.33 -0.04 19930 454.37 454.48 0.11 20980 453.41 453.37 -0.04 20980 454.41 454.53 0.12 20990 453.41 453.37 -0.04 20990 454.4 454.52 0.12 21260 453.53 453.5 -0.03 21260 454.68 454.79 0.11 21635 453.52 453.49 -0.03 21635 454.64 454.76 0.12 21645 453.53 453.49 -0.04 21645 454.65 454.76 0.11 22370 453.78 453.75 -0.03 22370 455.19 455.29 0.1 i Table 4 Windsor Estates Channel Velocities 100-Year Ultimate and 500-Year F.I~. 0 4.76 4.76 0 0 4.88 4.88 0 1 2.98 2.98 0 I 2.98 2.99 0.01 1.1 5.53 5.53 0 1.1 5.81 5.8 -0.01 2 6.2 6.2 0 2 6.89 6.89 0 3 6.78 6.78 0 3 7.59 7.6 0.01 4 5.93 5.93 0 4 6.51 6.52 0.01 5 6.4 6.4 0 5 6.95 6.95 0 6 6.72 6.79 0.07 6 7.2 7.46 0.26 7 8.24 8.19 -0.05 7 8.9 9.1 0.2 9 5.53 5.72 0.19 '~ 9 5.8 6.35 0.55 ~ 10 5.65 5.82 0.17 10 6.08 6.63 0.55 ~ 11 3.53 3.66 0.13 -~ 11 4.16 4.37 0.21 ~ 12 3.96 4.02 0.06 12 5.13 5.18 0.05 13 3.58 3.58 0 Table 4 Windsor Estates Channd Velocities lO0-Year Ultimate and SO0-Year F,I.S. 13 5.06 5 .0.06 14 2.95 2.99 0.04 14 4.11 4.14 0.03 19930 2.87 2.91 0.04 19930 4.04 4.06 0.02 20980 3.89 3.9 0.01 20980 5.69 5.64 .0.05 20990 3.9 3.91 0.01 20990 5.75 5.7 -0.05 21260 3.45 3.46 0.01 21260 5.02 4.99 -0.03 21635 4.46 4.47 0.01 21635 6.53 6.49 -0.04 21645 4.46 4.46 0 21645 6.53 6.48 -0.05 22370 4.66 4.67 0.01 22370 6.56 6.49 -0.07 F F F F F, F F F F Table 5 Windsor Estates Water Surface Elevations vs. Levee Elevations 100-Year Ultimate and 500-Year F.I,S. 0 446.71 0 447.36 I 447.9 I 448.48 1.1 449.14 1.1 449.65 2 450.05 2 450.62 3 450.59 3 451.27 4 450.84 4 451.58 5 450.82 5 451.57 6 450.87 6 451.61 7 451.04 7 451.8 9 452.34 9 453.24 10 452.56 10 453.49 11 452.98 11 453.96 12 453.09 12 454.09 F 13 453.15 458.1 4.95 Table 5 Windsor Estates Water Surface Elevations vs. Levee Elevations 100-Year Ultimate and 500-Year F.I.S. 13 454.16 458.1 14 453.24 458.1 14 454.33 458.1 19930 453.33 458.5 19930 454.48 458.5 20980 453.37 458.4 20980 454.53 458.4 20990 453.37 458.4 20990 454.52 458.4 21260 453.5 458.4 21260 454.79 458.4 21635 453.49 458,7 21635 454.76 458.7 21645 453.49 458.7 21645 454.76 458.7 22370 453.75 459.7 22370 455.29 459.7 4.86 3.77 5.17 4.02 5.03 3.87 5.03 3.88 4.9 3.61 5.21 3.94 5.21 3.94 5.95 4.41 i