Loading...
Four Seasons 1-LR 911107 (2) reed engineering ON TEST REPORT REPORT NO.: 19 JOB NO.: 556.2 DATE CAST: 11/07/9 1 PROJECT: Proposed Four Seasons Distribution Center Pier No. G.5-8, A.7-1, F.5-8 LOCATION: WSI Architects ARCHITECT/ENGINEER: NATCON, INC. CONTRACTOR: REPORTED TO: NATCON, Inc. SPECIFICATION: 3 000 PS I OUANTITY REPRESENTED: 16/3 2 SAMPLED BY: BY ORDER OF: 12/05/91 DATE: 11/14/91 ORDER NUMBER: K. Atkins Contractor (6 x 12 INCH) NOMINAL CYLINDER SIZE: AREA-28.26 SQ. IN. LABORATORY NUMBER FS 110701 FS 110702 FS 110703 FIELD NUMBER: 64,500 96,000 99,500 MAXIMUM LOAD, LBS: 7 28 28 AGE WHEN TESTED, DAYS: 2280 3400 3520 COMPRESSIVE STRENGTH, PSI: 3460 AVERAGE STRENGTH, PSI: TWPE BREAK: CONICAL (U.N.O.) REMARKS: Does comply with Specification FS 110704 H METHOD OF CURING: FIELD 1 DAYS, LABORATORY FROM 11/08/91 TRANSPORTED BY Reed TEMPERATURE: AMBIENT 4 0 'F MIX 5 4'F, AIR CONTENT SLUMP 4.0 INCHES TIME OF SAMPLE: 2 : 30 PICK-UP CHARGE: Y~ N__O SOURCE OF CONCRETE: FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S}: MIX CODE: Pioneer 1304 TICKET NO.: 22-666-94 UNIT WEIGHT PCF YIELD CF/CY DISTRIBUTION: (1) NATCON, Inc./Mr. John Fisher (1) Bradford Companies/Mr. Subash Gaitonde (1) Brockett-Davis-Drake, Inc./Mr. Gary McHale (1) WSI Architects/Mr. Ray Garrison (1) Slider & Associates/Mr. Tim Slider SIGNED ~-1~- City of Coppell/Mr. Larry Davis TEST METHODS: ASTM C31, C39, C143, C 173, C 192, C231, ORC 1064 1 1 PAGE OF~ 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350~5600 · (FAX) 214/35~O019