Loading...
Four Seasons 1-LR 911022 reed engineering GEOTECHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT REPORTNO.: 13 JODNO.: 556. 2 P"~ECT: Proposed Four Seasons Distribution Center Pier Nos. A-5.4, A-5.8, A-6.4 LOCATION: WSI Architects ARCHITECT/ENGINEER: NATCON, INC. CONTRACTOR: REPORTED TO: NATCON, Inc. DATECAST: 10/22/91 SPECIFICATION: 3000 PSI QUANTI~Y REPRESENTED: 21/48 yds. SAMPLED BY: BY ORDER OF: 11/19/91 DATE: 10/29/91 ORDER NUMBER: K. Atkins Contractor (6 x 12 INCH) NOMINAL CYLINDER SIZE: AREA.28.26 SQ. IN, LABORATORY NUMBER FS 102201 FS 102202 FS 102203 FIELD NUMBER: 93,000 126~ 000 128~ 000 MAXIMUM LOAD, LBS: 7 28 28 AGE WHEN TESTED, DAYS: 3290 4460 4530 COMPRESSIVE STRENGTH, PSI: 4500 AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: Does comply with Specification FS 102204 HOLD METHOD OF CURING: FIELD 1 DAYS. LABORATORY FROM 10/2 3/91 TRANSPORTED BY Reed TEMPERATURE: AMBIENT 7 8'F MIX 7 8=, AIR CONTENT %, SLUMP 5, 0NcHES TIME OF SAMPLE: 0 4: 0 0 PICK-UP CHARGE: YEg~ NO SOURCE OF CONCRETE: Pioneer FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): MIX CODE: 1304 TICKET NO.: 12537 UNIT WEIGHT PCF YIELD CF/CY i (1) NATCON, Inc /Mr John Fisher I T lB ON: , ' ° . ~[f ~radford Companies/Mr. Subash Galtonde (1) Brockett. Davls. Drake, Inc./Mr. Gary McHale (1) WSI Architects/Mr. Ray Garrison (1) Slider & Associates/Mr. Tim Slider ~) city of Coppell/Mr. Travis Crump TEST METHODS: ASTM C31, c3g, C143, C173, C 192, C231, ORC1~ SIGNED PAGE OF 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/35(~5600 · (FAX) 214/35(~O019