Loading...
Prologis Park-LR161208 (2) Halie Hernandez From:Chance Bolton <cbolton@mycon.com> Sent:Thursday, December 08, 2016 3:58 PM To:Matthew Mabry Cc:Halie Hernandez; Chet Coker Subject:RE: Silt fence Failing at Box Culvert Prologis building 6 Our 2 pumps have always been located on the northeast section which has no damage. The picture that was sent occurred between Sunday and Monday night with all the rainfall. We also have a swppp report from our 3rd party that was done Monday morning noting this. We had no subs working on Monday because of it raining all day Sent via the Samsung Galaxy S6 edge+, an AT&T 4G LTE smartphone Chance Bolton Assistant Project Superintendent MYCON General Contractors 208 E Louisiana St, Suite 200 McKinney, TX 75069 Main: 972.529.2444 Cell: 903.880.7957 www.mycon.com This message is confidential. It may also be privileged or otherwise protected by work product immunity or other legal rules. If you have received it by mistake, please let us know by e-mail reply and delete it from your system; you may not copy this message or disclose its contents to anyone. Please send us by fax any message containing deadlines as incoming e-mails are not screened for response deadlines. The integrity and security of this message cannot be guaranteed on the Internet. -------- Original message -------- From: Matthew Mabry <MMabry@coppelltx.gov> Date: 12/8/16 3:33 PM (GMT-06:00) To: Chance Bolton <cbolton@mycon.com> Cc: Halie Hernandez <HHernandez@coppelltx.gov> Subject: RE: Silt fence Failing at Box Culvert Prologis building 6 Chance, My email earlier was incorrect. I now understand that Walter from Tiseo will fix the silt fence along the south side of the apron and half way across the west side where the bank has eroded. He is saying that the rest of the silt fence was damaged when you started pumping water from the detention pond. Let me know if you have any questions. Thanks 1 Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov From: Chance Bolton \[mailto:cbolton@mycon.com\] Sent: Thursday, December 08, 2016 12:10 PM To: Matthew Mabry <MMabry@coppelltx.gov> Cc: Chet Coker <ccoker@mycon.com> Subject: Silt fence Failing as Box Culvert Attached is a picture of the box culvert/basin with a minimal amount of silt on it due to the silt fence that Tiseo installed failing Chance Bolton Assistant Project Superintendent MYCON General Contractors 208 E Louisiana St, Suite 200 McKinney, TX 75069 Main: 972.529.2444 Cell: 903.880.7957 www.mycon.com This message is confidential. It may also be privileged or otherwise protected by work product immunity or other legal rules. If you have received it by mistake, please let us know by e-mail reply and delete it from your system; you may not copy this message or disclose its contents to anyone. Please send us by fax any message containing deadlines as incoming e-mails are not screened for response deadlines. The integrity and security of this message cannot be guaranteed on the Internet. 2