From:Chance Bolton <cbolton@mycon.com>
Sent:Thursday, December 08, 2016 3:58 PM
To:Matthew Mabry
Cc:Halie Hernandez; Chet Coker
Subject:RE: Silt fence Failing at Box Culvert Prologis building 6
Our 2 pumps have always been located on the northeast section which has no damage. The picture that was sent
occurred between Sunday and Monday night with all the rainfall. We also have a swppp report from our 3rd
party that was done Monday morning noting this. We had no subs working on Monday because of it raining all
day
Sent via the Samsung Galaxy S6 edge+, an AT&T 4G LTE smartphone
Chance Bolton
Assistant Project Superintendent
MYCON General Contractors
208 E Louisiana St, Suite 200
McKinney, TX 75069
Main: 972.529.2444
Cell: 903.880.7957
www.mycon.com
This message is confidential. It may also be privileged or otherwise protected by work product immunity or other legal
rules. If you have received it by mistake, please let us know by e-mail reply and delete it from your system; you may not
copy this message or disclose its contents to anyone. Please send us by fax any message containing deadlines as
incoming e-mails are not screened for response deadlines. The integrity and security of this message cannot be guaranteed
on the Internet.
-------- Original message --------
From: Matthew Mabry <MMabry@coppelltx.gov>
Date: 12/8/16 3:33 PM (GMT-06:00)
To: Chance Bolton <cbolton@mycon.com>
Cc: Halie Hernandez <HHernandez@coppelltx.gov>
Subject: RE: Silt fence Failing at Box Culvert Prologis building 6
Chance,
My email earlier was incorrect. I now understand that Walter from Tiseo will fix the silt fence along the south side of the
apron and half way across the west side where the bank has eroded. He is saying that the rest of the silt fence was
damaged when you started pumping water from the detention pond. Let me know if you have any questions.
Thanks
1
Matthew Mabry
Engineering Construction Inspector
City of Coppell, TX
214-406-5223 (cell)
www.coppelltx.gov
From: Chance Bolton \[mailto:cbolton@mycon.com\]
Sent: Thursday, December 08, 2016 12:10 PM
To: Matthew Mabry <MMabry@coppelltx.gov>
Cc: Chet Coker <ccoker@mycon.com>
Subject: Silt fence Failing as Box Culvert
Attached is a picture of the box culvert/basin with a minimal amount of silt on it due to the silt fence that Tiseo
installed failing
Chance Bolton
Assistant Project Superintendent
MYCON General Contractors
208 E Louisiana St, Suite 200
McKinney, TX 75069
Main: 972.529.2444
Cell: 903.880.7957
www.mycon.com
This message is confidential. It may also be privileged or otherwise protected by work product immunity or other legal
rules. If you have received it by mistake, please let us know by e-mail reply and delete it from your system; you may not
copy this message or disclose its contents to anyone. Please send us by fax any message containing deadlines as
incoming e-mails are not screened for response deadlines. The integrity and security of this message cannot be guaranteed
on the Internet.
2