Loading...
WA9302A-SP 960312SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS DALLAS, TEXAS No Texas Municipal Construction Company, Inc. 5614 D r St. Dallas, Te 75206 · : ' igre Re: City of Coppell Village Parkway Pump Station Addition Date: March 12, 1996 We are transmitting herewith 5 copies of the submittal data furnished by you. These copies have been reviewed and marked as follows: Explanation Submittal No. No Make Revise Submit No. of Exceptions Corrections and Specified Copies Dwg. Description Taken Rejected Noted Resubmit Items 6A 8 Fence Improvements XX Remarks: By copy of this letter we are returning 2 copies of the submittal to Mr. Larry Davis, City of Coppell. Matt H I.T. Checking of shop drawings by Shimek, Jacobs & Finklea is only for general conform mace with the design concept of the project mad general compliance with the information given in the contract documents. Any action shown is subject to the requirements of the plans mad specifications. Contractor is responsible for: dimensions which shall be confirmed mad correlated at the job site; fabrication processes mad techniques of construction; coordination of his work with that of all other trades; mad performing his work in a safe mad satisfactory manner. North Texas Municipal Construction Company, Inc. 5614 Dyer St. Dallas, Texas 75206 214/368-6880 FAX 214/368-4950 March 9, 1996 Shim& Jacobs, & FinIdea Consulting Engineers 8333 Douglas Avenue, Suite 820 Dallas, Texas 75225 Attention: Gary Hendricks Reference: Village Parkway Pump Station Coppell, Texas Dear Mr. Henchicks: ~jjZ~NO EXCEPTION TAKEN [] MAKE CORRECTIONS NOTED [] REJECTED [] REVISE AND RESUBMIT [] SUBMIT SPECIFIED ITEM Checking is only for general conformance with the design concept of the project and general comp!iance with the information given in the contract documents. Any action shewn is subject to the requirements of the plans and specifications. Con~,ractor is rcspoqsible for: dimensions which shall be confirmed and correlated at the iob site; fabricafi3n processes and techniques of construction, co- ordina$~on of h~s work w~th that of all other trades and performing his work in a safe and s~[isfa:tory manner. SN~MEK, JACOBS & FtNKLEA CONSULTING ENGINEERS DALLAS, TEXAS As per our telephone conversation, please accept this letter as a submittal for the Fence Detail, Sheet Number C-7 of the plans on the above referenced project. The note at the far right of the fence detail shows the new fence to have two shop coats of galvanized primer and two coats of semi-gloss. As discussed the work cannot be shop built due to the fact the distance between the vertical rails varies and therefore has to be field fabricated. North Texas Municipal Construction Company, Inc. (NTMCCI) has determined the thickness of the tube steel and will match the existing tube steel and conform to the existing design. One note of clarification, the horizontal rail at the top of the fence is tube steel and what looks like tube steel under the top rail is sWap steel welded to vertical members. North Texas Municipal Construction Company, Inc. (NTMCCI) will do the same on the fence extension. We plan to begin the work first thing Monday morning. Please review this immediately. If you have any problems with this, please contact us. Sincerely, Michael G. Daigre President CONSTRUCTION * SALES * SERVICE [