Loading...
Copperstone-CS 960717The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 July 17, 1996 Mr. J. F. Clack, Inc. Route 1 Box 117A Caddo Mills, TX 75135 RE: Copperstone Addition Dear Jimmy: Listed below are items that must be addressed prior to release of your work in the referenced project. 1. Grade to drain at the outfall of stormdrain Lines 'C' & 'D'. 2. Remove exposed steel inside inlet boxes. 3. Head wall at the outfall of storm drain line 'B' has eroded. 4. Locate exist water valve at the S.E. side of bridge. 5. Sidewalk is pounding on bridge at the center of the West bound lane. 6. Clean sidewalk under bridge. 7. Place erosion control on all slopes at the bridge. 8. Submit 'as builts' and maintenance bonds. Please give me a call when you are ready to proceed with this work or if you have any questions please call me at 304-3685. Sincerely,