Loading...
Copperstone-CS 960430COPPELL ENGINEERING UTILIT/~ DIVI~ION MEMORANDUM 001 DATE: TO: FROM: RE: April 30, 1996 Garreth Camplell, Construction hmpector Ted Dutt, Interim utmties Superintendent/~)' Walk thru for ~ A walk-thru on the above referenced projoct was conducted on April 27, 1996 by Marc Russell and the items below were foutld to be deficient. 2. 3. 4. 5. 6. 7. 8. 9. t0. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. All fire hydrants need dots in stro~ts, Thrc~ main valves need cut out and blocked at Parkway & Auburn Way. All services need fittings uncovered. Station 2 + 43.09 manhole needs rain pan & chimney seal tightened . Station 14+85.08 ll/~ irrigation noeds a new lid. All manhol~ ncent chimney soals tigh~n~d, Block A lot 18 cleim out needs to be washed out. Block A lot 20 meter cans need straightened & clean out needs repair at top bell. Station 1 + 45 main clean out nceAts rcducc~ to 6 inches & plug. Two mainline valves at Parkway & Coppcrston¢ trail nccnis to by blockexl out. Block B lot 3 clean out noeds crack repaired. Irrigation meter east ~ide of auburn need curb uncovered.. Block A lot 41 clean out needs repair. Block A lot 36 clean out is smashod, nexis repair. Station 5 + 24 main clean out needs to be rc~luced to 6 inch©s & plug. Mainline valve at Parkway in sidewalk needs blocked out connecting circles. Block B lot 7 clean out needs to be washed out. Block E lot 15 clean out needs to be lowered to curb level. Block E lot 17 s~tter is too deep in can. Block C lot 16 curb stop needs to be straightened. Pleas~ ensure that these items g~t taken care of and if you have any questions, pleas~ give me a call. TD/dg