Loading...
Westhaven Phase 2B-LR161215A L P N A # TESTING REPORT OF FIELD rte. Tr-sTIIMA IftriytS 2209 Wisconsin Street, Suite 100 n rev e v w v Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 TESTED FOR: PROJECT: TEST DATA: Cullum Construction Dallas, Texas Westhaven Phase 26 - Utilities Coppell, Texas DATE: 12/15/16 OUR REPORT NO.: 162997-3 TECHNICIAN: J. Bura TEST NO. DATE ELEV. DEPTHNUMBER SOIL ID OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRV DENSITY PCF PERCENT COMPACTION COMMENT* 44 12/15/16 FG -6.0 130758/1 21.6 102.7 22.5 99 96 1-A 45 12/15/16 FG -5.0 130758/1 21.6 102.7 23.0 99 96 1-A 46 12/15/16 FG -4.0 130758/1 21.6 102.7 22.6 101 98 1-A 47 12/15/16 FG -3.0 130758/1 21.6 102.7 21.9 100 97 1-A 48 12/15/16 FG -2.0 130758/1 21.6 102.7 21.6 102 99 1-A 49 12/15/16 FG -1.0 130758/1 21.6 1 102.7 1 22.8 100 98 1-A 50 12/15/16 FG -5.0 130758/1 21.6 1 102.7 1 23.6 1 99 97 1-A TEST LOCATION: 44 Sanitary Manhole on Line Rat Station 8+09 45 Sanitary Manhole on Line Rat Station 8+09 46 Sanitary Manhole on Line R at Station 8+09 47 Sanitary Manhole on Line R at Station 8+09 48 Sanitary Manhole on Line R at Station 8+09 49 Sanitary Manhole on Line R at Station 8+09 50 Sanitary Service to Block D, Lot 6 1. FILL ' A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2, NATURALSUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST a l•kr� Attef Abushakra, P.E. ALPHATESTING, INC. Curlesl result,antl rapers are forme exclusive use of the Cllenl (mM Ihelydeslgnaled mGpienls on from .... free) antl shall Who repmarem! erup rdlaMbaled exeeplwilh express eppmval of ALPIU. The use of our hma. and lest results must receive our written approval. Test maulls and reports apply only to the samples testa mullml.bmrveq antl am me lndleagve el the qu.1111. of .,..all, surreal melrgilar spetlmens. ALPHA X TESTING 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 TESTED FOR: PROJECT: TEST DATA: Cullum Construction Dallas, Texas Westhaven Phase 213 - Utilities Coppell, Texas T*076-40010aI_A4�7 C®MPACTION TESTS DATE: 12/15/16 OUR REPORT NO.: 162997-3A TECHNICIAN: J. Bura TEST NO, DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRV DENS" PCF PERCENT COMPACTION COMPACTION Sanitary Service to Block D, Lot 8 51 12/15/16 FG -4.0 130758/1 21.6 102.7 23.7 98 96 1-A 52 12/15/16 FG -3.0 130758/1 21.6 102.7 23.3 99 96 1-A 53 12/15/16 FG -2.0 130758/1 21.6 102.7 22.4 99 96 1-A 54 12/15/16 FG -1.0 130758/1 21.6 102.7 23.0 98 95 1-A 55 12/15/16 FG -5.0 130758/1 21.6 102.7 23.5 100 97 1-A 56 12/15/16 FG -4.0 130758/1 21.6 102.7 22.7 100 98 1-A 57 12/15/16 FG -3.0 130758/1 1 21.6 102.7 21.6 1 100 97 1-A TEST LOCATION: 51 Sanitary Service to Block D, Lot 6 52 Sanitary Service to Block D, Lot 6 53 Sanitary Service to Block D, Lot 6 54 Sanitary Service to Block D, Lot 6 55 Sanitary Service to Block D, Lot 8 56 Sanitary Service to Block D, Lot 8 57 Sanitary Service to Block D, Lot 8 1. FILL A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3, LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENTTREATED D. RETEST AtlefAbushakra, P.E. ALPHA TESTING, INC. Our test reales and reports are forth exclusive use oft" Client sand that, designated recipients on file in our of re) end shalt not be repmduoed andle,didnin led except with express approval of ALPHA The e of our name and lest results must meheive dmendien appfavt 1. Test results aad efforts apply only to the samples tasted ardlm absarved, and are not Indicative of the qualit es of appereally IdeMioel ofsimller spedmeas. A LPN A /N* T E ST INC REPORT OF FIELD 2209 Wisconsin Street, Suite 100 COMPACTION TESTS Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 TESTED FOR: PROJECT: TEST DATA: Cullum Construction Dallas, Texas Westhaven Phase 26 - Utilities Coppell, Texas DATE: 12/15/16 OUR REPORT NO.: 162997-3B TECHNICIAN: J. Bura TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM. I -AB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PEA ENT COMPACTION COMMENT" 58 12/15/16 FG -2.0 130758/1 21.6 102.7 21.9 100 97 1-A 59 12/15/16 FG -1.0 130758/1 21.6 102.7 22.5 98 96 1-A 60 12/15/16 FG -2.0 130758/1 21.6 102.7 22.0 101 98 1-A 61 12/15/16 FG -1.0 130758/1 21.6 102.7 23.6 101 98 1-A 62 12/15/16 FG 130758/1 21.6 102.7 23.1 102 99 1-A III III 72irnTNev11ralORI 58 Sanitary Service to Block D, Lot 8 59 Sanitary Service to Block D, Lot 8 60 Water Line along Wingate Road at Station 11+00 61 Water Line along Wingate Road at Station 11+00 62 Water Line along Wingate Road at Station 11+00 D. RETEST 1. FILL ' A. IN PLACE PERCENT MOISTURE AND. PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENTTREATEO D. RETEST af��� l•k� AltefAhushakra, P.E. ALPHA TESTING, INC. Our len msulls and repdds are for the exclusive use or the Want (and Neirdesignated recipients on file in.uroffice) and shall nal ha reproduced anW.,drAdbNetl except Won..press approval of ALPHA. The as fear name and teal resells must receive ourwdttonapproval Teal results and reports apply nnly to the samples tested an&.,.Laered, and are net indi.allve ofthe qualifies a Ta,,arally(deeded rutraft, spap'mens. ALPHA /* TESTING 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 TESTED FOR: PROJECT: TEST DATA: Cullum Construction Dallas, Texas Westhaven Phase 213 - Utilities Coppell, Texas REPORT OF FIELD COMPACTION TESTS DATE: 12/16/16 OUR REPORT NO.: 162997-4 TECHNICIAN: J. Bura TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM. I -AB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCE PERCENT COMPACTION COMMENT' 63 12/16/16 FG -2.0 130758/1 21.6 102.7 22.5 99 96 1-A 64 12/16/16 FG -1.0 130758/1 21.6 102.7 21.8 99 96 1-A 65 12/16/16 FG 130758/1 21.6 102.7 23.6 100 97 1-A 66 12/16/16 FG -2.0 130758/1 21.6 102.7 23.0 101 98 1-A 67 12/16/16 FG -1.0 130758/1 21.6 102.7 22.3 102 99 1-A 68 12/16/16 FG 130758/1 21.6 102.7 23.1 1 101 98 1-A 69 12/16/16 FG -2.0 130758/1 21.6 1 102.7 1 21.8 1 99 96 1-A TEST LOCATION: 63 Water Line along Wingate Road at Station 14+00 64 Water Line along Wingate Road at Station 14+00 65 Water Line along Wingate Road at Station 14+00 66 Water Line along Eden Street at Station 2+00 67 Water Line along Eden Street at Station 2+00 68 Water Line along Eden Street at Station 2+00 69 Water Line along Johns Avenue at Station 2+00 1. FILL A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST �h rJYl AltefAbushakra, P.E. ALPHA TESTING, INC. our lest results rad reyoRsare for the a dreNe use of @e Client trop Ihabdo,fibedr l haddenls as file In our oto.) and shell not be repeduced sudd ar Nsltlhuled eviceplisilh express approval of AIPIW The use of our name and lest results must recelve ourwdtten approval. Teel remlls and refund, apply only to Ihr samples tested an&a, observed, and red net indieslive of the rpoluds or appmenlly Wholeat unsimilar sprelmrns, ALPHA #v%TESTING REPORT OF FIELD 2209 Wisconsin Street, Suite 100 COMPACTION TESTS Dallas, Texas 75229 Geotechnical I Construction Materials l Environmental www.alphatesting.com TBPE Firm No. 813 TESTED FOR: PROJECT: TEST DATA: Cullum Construction Dallas, Texas Westhaven Phase 213 - Utilities Coppell, Texas DATE: 12/16/16 OUR REPORT NO.: 162997-4A TECHNICIAN: J. Bura TEST NO. DATE ELEV. DEPTH SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCP IN PLACE MOISTURE % IN PLACE DRY DENSITY PDF PERCENT COMPACTION COMMENT' 70 12/16/16 FG -1.0 130758/1 21.6 102.7 22.6 101 98 1-A 71 12/16/16 FG 130758/1 21.6 102.7 23.0 101 98 1-A [ESI LUCAIIUN: 70 Water Line along Johns Avenue at Station 2+00 71 Water Line along Johns Avenue at Station 2+00 1. FILL ' A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. TIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST af{'fil • i+iet- AltelfA6ushakra, P.E. ALPHA TESTING, INC. Our test oundla and depend are for the sxolusive use of the Client (and 0elfdeslgnsted recipients on no 1nourol0e.)ead shall net be reproduced andlartllsidhelnd fumed Win expmas app,dvaI rr AiYKA The a of our name and lest results must receive our writhed approval. Tost results end repptlsapplyanlyco Ihesamples tested and/or observed, and ere not intlicelive p(IM1e quaglies of apparently Itlenticel orslmllar spsourens.