April 30, 1996
Garreth Camplell, Construction Inspector
Ted Dutt, Interim Utiliti~ Superintendent~/jj'
Walk thru for Cop_oerstone
A walk-thru on the above referenced project was conducted on April 27, 1996 by Marc
Russell and the items below were found to be deficient.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
20.
All fire hydrants need dots in streets.
Three main valves need cut out and blocked at Parkway & Auburn Way.
All services need fittings uncovered.
Station 2 + 43.09 manhole needs rain pan & chimney seal tightened.
Station 14+85.08 11/2 irrigation needs a new lid.
All manholes need chimney seals tightened.
Block A lot 18 clean out needs to be washed out.
Block A lot 20 meter cans need straightened & clean out needs repair at top bell.
Station 1 + 45 main clean out needs reduced to 6 inches & plug.
Two mainline valves at Parkway & Copperstone trail needs to be blocked out.
Block B lot 3 clean out needs crock repaired.
Irrigation meter east side of auburn need curb uncovered..
Block A lot 41 clean out needs repair.
Block A lot 36 clean out is smashed, needs repair.
Station 5 + 24 main clean out needs to be reduced to 6 inches & plug.
Mainline valve at Parkway in sidewalk needs blocked out connecting circles.
Block B l.ot 7 clean out needs to be washed out.
Block E lot 15 clean out needs to be lowered to curb level.
Block E lot 17 setter is too deep in can.
Block C lot 16 curb stop needs to be straightened.
Please ensure that these items get taken care of and if you have any questions, please
give me a call.
TD/dg
ENGINEERING - STREET DIVISION
MEMORANDUM
DATE:
TO:
FROM:
&pti1 26, 1996
G&rreth Campbell, Construction Inspector
Per Bit,sa11, Sig.n Signal
Walk Thru for Copperstone Addition
A walk through was conducted at the above referenced location
today. The following deficiencies were/identified:
1. 4' of saw joint not sealed.
/2. Approach to street cold joint3- route & seal. ~
%~3. 3 panels east - curb seal.
Centerline Eastbound - concrete chip 8 panels east -
se'al.
Patc~ Curb South side. No pavement markings.
Paver band appears to hold water at edge east and west.
Curb chip at saw joint. Remove and seal.
9
13.
Curb chip at saw joint.
Silicone?
Possible Ponding - Water check.
Inlet curbing cracked west end.
See (10) above·
Remove form board. Sta.
Curb chip at saw joint. Remove and seal.
Approach to street -- need saw joint.
Patch face Lot 12 and 13.
Remove and seal. Ail
East end will crack.
Lot 18.
16.
17.
Possible ponding Lot 11 -- water check.
Drainage -- Ram neck pulled out of joint inside pipe
and end piece cracked at joint. Erosion already
~8.
19.
U/20.
~/22.
24.
~25.
~27.
30v
~33.
35.
38.
occurring at outfall.
Continue saw joint thru curb and seal.
Drainage -- Ram neck pulled out of joint inside pipe
and end piece cracked at joint. Erosion already
occurring at outfall. Finish. Ram necks appear to be
blowing out of joints.
Corner of panel and header - broken.
Lot 12/13 alley -- mud ball hole.
Remove form board. Sta.
Approach to street -- need saw joint.
Reseal curb Lot 2 Avalon alley return.
Reseal curb Lot 4'.
Reseal Curb.
Random cr.a~k rout and seal.
Graffiti
Plastic bottle in paving - remove and patch.
Drainage -- forms in inlets.
Twe panels sidewalk - cracked.
Reseal curb 6/7.
Random crack/chip at header.
and seal.
Remove chip - rout crack
Curb chip at header. Remove and seal.
Patch curb and reseal at header. ? Large panels - over
20' wide.
Reseal cu~-at inlet.
Needs gro%ut work. ? Outfall area - where does it drain
to? ~''
2/1 Lot pos~ble pending - water test.
Chip in header joint -- remove and seal.
PB/bc
Enclosure
Concrete slobber over header at curb.
Random crack at inlet Lot 15.
Concrete chips in centerline joint.
Remove and seal.
3