Copperstone-CS 960424The City With-~Be'autiful Futur;
P.O. Box 478
Coppell, Texas 75019
214-4§2-0022
April 24, 1996
Jim Briscoe
Briscoe Clark
8300 Douglas Ave., Suite 800
Dallas, Texas 75225
Copperstone Addition
Partial Final Acceptance
Dear Mr. Briscoe:
Please be advised that a walk through has been scheduled for Friday, April 26th, 1996 at 9:00
a.m. for the water, sanitary sewer, paving and drainage facilities on that portion of the
referenced project located west of the bridge over Cottonwood Creek.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are presem to assist with the inspection.
Thank you for your cooperation during this construction and if I can be of further service, please
contact me at (214) 304-3685.
Sincerely,
Ted Dutt, Interim Water Superintendem
Per Birdsall, Street Division
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Glen Thurman
J.F. Clack