Four Seasons 1-CS 910716The City With A Beautiful Future
PRE-CONSTRUCTION PACKET
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
PROJECT
NAME
DATE:
TIME:
A~ND~ES~T
NAME: COMPANY: PHONE:
-,-), - /
H~,dl~'~ cs
3i8-
6~?- ~?~-
i!
(i)
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
PROJECT NAME:
DATE: 7-1 -
ASS IGNED INSPECTOR: ~F~,///~/~/>
I. ATI~NDANCE: (~ee Att~che~d List )
II. PLANS FURNISHED TO:
A) CITY
B ) CONTRACTOR
C ) OWNER
YEs //No
YES NO
YES NO
III.
UTILITY COMPANIES NOTIFIED:
A) TELEPHONE
B) GAS
C ) ELECTRIC
D) CABLE T.V.
E) OTHER
IV.
STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS:
HIG~qAY PERMIT YES NO
RAILROAD PERMIT YES NO
STREET CUT PERMIT YES c/ NO
BORING PERMIT YES ~ NO
Vo
INSPECTION:
DAILY INSPECTION BY ASSIGNED INSPECTOR
AFTER HOURS AND WEEKENDS (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIME
CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY
INSPECTOR AT LEAST 5WENTY-~ (24) HOURS
BEFORE WATER/SANITARY SEWER/STORM SEWER/
PAVING CONSTRUCTION BEGINS.
(2)
VI.
TESTING OF MATERIALS:
~. DENSITIES
~., APPROVED CONCRETE BATCH DESIGN
~,-.~. CONCRETE PAVING INCLUDING CORES
~ APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII.
VIII.
IX.
Xo
STREET CLOSING REQUIRED: YES
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN
ADVANCE.
CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED
B. TRAFFIC DETOUR
C. WARNING LIGHTS
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
YES
YES
YES
AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMII~fING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
INFORMATION:
DEVELOPER:
NAME:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
(3)