Loading...
Four Seasons 1-CS 910716The City With A Beautiful Future PRE-CONSTRUCTION PACKET P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 PROJECT NAME DATE: TIME: A~ND~ES~T NAME: COMPANY: PHONE: -,-), - / H~,dl~'~ cs 3i8- 6~?- ~?~- i! (i) CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE PROJECT NAME: DATE: 7-1 - ASS IGNED INSPECTOR: ~F~,///~/~/> I. ATI~NDANCE: (~ee Att~che~d List ) II. PLANS FURNISHED TO: A) CITY B ) CONTRACTOR C ) OWNER YEs //No YES NO YES NO III. UTILITY COMPANIES NOTIFIED: A) TELEPHONE B) GAS C ) ELECTRIC D) CABLE T.V. E) OTHER IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: HIG~qAY PERMIT YES NO RAILROAD PERMIT YES NO STREET CUT PERMIT YES c/ NO BORING PERMIT YES ~ NO Vo INSPECTION: DAILY INSPECTION BY ASSIGNED INSPECTOR AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST 5WENTY-~ (24) HOURS BEFORE WATER/SANITARY SEWER/STORM SEWER/ PAVING CONSTRUCTION BEGINS. (2) VI. TESTING OF MATERIALS: ~. DENSITIES ~., APPROVED CONCRETE BATCH DESIGN ~,-.~. CONCRETE PAVING INCLUDING CORES ~ APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. VIII. IX. Xo STREET CLOSING REQUIRED: YES IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN ADVANCE. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED B. TRAFFIC DETOUR C. WARNING LIGHTS IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. YES YES YES AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMII~fING THE CORRECT "AS-BUILT" PLANS TO THE CITY. INFORMATION: DEVELOPER: NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3)