Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
DFW Trade B4-LR170102
Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Controls Control Status Actions Required Construction Entrance/Exit Silt Fence Sediment Traps Inlet Protection Vegatative Buffer Strips Rock / Sandbag Berm Installed - Compliant Installed - Compliant Installed Later Not on ECP Not on ECP Installed - Compliant None None None None None None Concrete Wash area Wattes / Erosion logs Velocity Dissipation devices Fuel Area containment Not on ECP Installed Later Not on ECP Not on ECP None None None None The site is approximately in the following construction stage:Copyright © 2017 Project Compliance,LLC. All Rights Reserved. NoneNot on ECPErosion Control Mats Temporary Stabilization Not on ECP None Permanent Stabilization Installed Later None Date: ____________________1/2/2017Inspector: _____________________________ I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Copyright © 2017 Project Compliance,LLC. All Rights Reserved.DFW TRADE CENTER - LOT 3 BLOCK 4 - 1/2/2017 Date: 1/2/2017Project Name: DFW TRADE CENTER - LOT 3 BLOCK 4Permit Number(s): TXR15 0029950 Reason for inspection: 7 Day Weather: Cloudy/WetQualifications: Shown within SWP3Contractor: FCL Builders LLC Inspector: Juan Job:DFW TRADE CENTER - LOT 3 BLOCK 4. Contr:FCL Builders LLC 32.985065, -97.017916 Locations of Discharges of Sediment or Other Pollutants from the Site: None at this time. Rough grading and pad grading. None at this time.Locations of BMPs that failed to operate as designed or proved inadequate: Locations of BMPs that need to be Maintained: Locations where additional BMPs are needed: Additional Notes: None at this time. None at this time. Site looks good at the time of inspection. Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Photos of the site 1. 4. 2. 3. Date: ____________________1/2/2017Inspector: _____________________________ I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Copyright © 2017 Project Compliance,LLC. All Rights Reserved.DFW TRADE CENTER - LOT 3 BLOCK 4 - 1/2/2017 Copyright © 2017 Project Compliance,LLC. All Rights Reserved.DFW TRADE CENTER - LOT 3 BLOCK 4 - 1/2/2017