Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Security Fire Systams-LR170103
Security Fire Systams_v2.pdf Markup Summary Subject: Polygon Page: Page 1 Status: Author: gmarshall Date: 1/3/2017 3:14:33 PM Color: Depth: Layer: Space: <ID:3>Correct Legal description Page 1 (2) Subject: Text Box Page: Page 1 Status: Author: mgarza Date: 12/21/2016 11:12:59 AM Color: Depth: Layer: Space: <ID:4>SFS Addition Lot 1 Block A Subject: Text Box Page: Page 2 Status: Author: mgarza Date: 12/21/2016 10:50:58 AM Color: Depth: Layer: Space: <ID:4>And Drainage easement? Page 2 (5) Subject: Text Box Page: Page 2 Status: Author: mgarza Date: 12/21/2016 10:57:58 AM Color: Depth: Layer: Space: <ID:4>include easement for vault Subject: Text Box Page: Page 2 Status: Author: mgarza Date: 12/21/2016 10:57:57 AM Color: Depth: Layer: Space: <ID:4>include easement for vault ENGINEER ENGINEER City of Cop City of Cop ENGINEERING PLANSENGINEERING PLANS City of Coppell, TexasCity of Coppell, Texas SFS Security Fire Systems, Inc.SFS Security Fire Systems, Inc. <ID:4>SFS Addition Lot 1 Block A <ID:4>And Drainage easement? <ID:4>include easement for vault <ID:4>include easement for vault Subject: Pencil Page: Page 2 Status: Author: gmarshall Date: 12/28/2016 3:31:41 PM Color: Depth: Layer: Space: <ID:1>Provide water easement for the DDC. Subject: Pencil Page: Page 2 Status: Author: gmarshall Date: 12/28/2016 3:32:18 PM Color: Depth: Layer: Space: <ID:1>Provide easement for gabion wall for City to maintain. Subject: Pencil Page: Page 5 Status: Author: gmarshall Date: 12/28/2016 3:34:33 PM Color: Depth: Layer: Space: <ID:1>What happened to the contours? Provide contours and labels Page 5 (1) Subject: Pencil Page: Page 6 Status: Author: gmarshall Date: 12/28/2016 3:38:56 PM Color: Depth: Layer: Space: <ID:1>Provide consistent demo from paving plan (Freeeport Parkway etc) Page 6 (1) Subject: Text Box Page: Page 7 Status: Author: mmabry Date: 12/19/2016 8:23:26 AM Color: Depth: Layer: Space: <ID:2>Concrete in fire lane and approaches needs to be 3,600 PSI Page 7 (3) OHPOHP SFS SECURITY FIRE SYSTEMS 131 S. Tennessee St.McKinney, Texas 75069972.562.4409 SANDY LAKECOPPELL RUBY OAK GROVE TAN BARKALDERSANDY LAKE Branch Cottonwood FREEPORTPIKWY<ID:2>Concrete in fire lane and approaches needs to be 3,600 PSI Subject: Pencil Page: Page 7 Status: Author: gmarshall Date: 12/28/2016 3:39:49 PM Color: Depth: Layer: Space: <ID:1>Why is any pavement removal and replacement necessary in the travel lanes of Freeport Parkway? Can this not be designed around? - If absolutely necessary, then this shall be a weekend process. I.e closure after rush hour on Friday and re-open before Monday AM. However, I think we (City and Developer) should work something out so that this doesn't have to happen. Lets schedule a meeting to discuss further. Subject: Pencil Page: Page 7 Status: Author: gmarshall Date: 12/28/2016 3:46:33 PM Color: Depth: Layer: Space: <ID:1>Geotech letter needs to discuss specifically utilizing xx" of additional concrete in-lieu of cement or lime stabilization etc... Subject: Pencil Page: Page 8 Status: Author: gmarshall Date: 12/28/2016 4:30:04 PM Color: Depth: Layer: Space: <ID:1>See current plans for Freeport Parkway which show additional drainage system beyond curb. Maintain system that extends past Page 8 (1) Subject: Text Box Page: Page 9 Status: Author: mgarza Date: 12/21/2016 10:52:18 AM Color: Depth: Layer: Space: <ID:4>Headwall on Piers? Page 9 (2) Subject: Pencil Page: Page 9 Status: Author: gmarshall Date: 12/22/2016 1:58:46 PM Color: Depth: Layer: Space: <ID:1>Why perform all this bank grading work just to use a sloped end hdwl? can't you utilize a different type of hdwl and achieve the same result and less grading? - All headwalls in creeks must be placed on piers. <ID:4>Headwall on Piers? Subject: Text Box Page: Page 11 Status: Author: mgarza Date: 12/21/2016 10:52:57 AM Color: Depth: Layer: Space: <ID:4>I would recommend rock rip rap at the end of the flume Page 11 (3) Subject: Pencil Page: Page 11 Status: Author: gmarshall Date: 12/22/2016 2:03:55 PM Color: Depth: Layer: Space: <ID:1>This inlet re-location is new... is there not a way to design around it? Subject: Pencil Page: Page 11 Status: Author: gmarshall Date: 12/28/2016 4:51:14 PM Color: Depth: Layer: Space: <ID:1>Show existing system as revised for Freeport Parkway. Subject: Pen Page: Page 12 Status: Author: mgarza Date: 12/21/2016 10:53:46 AM Color: Depth: Layer: Space: <ID:4> Page 12 (2) Subject: Text Box Page: Page 12 Status: Author: mgarza Date: 12/21/2016 10:54:06 AM Color: Depth: Layer: Space: <ID:4>Headwall on a pier <ID:4>I would recommend rock rip rap at the end of the flume <ID:4>Hea dwall on a pier Subject: Pen Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:01:59 AM Color: Depth: Layer: Space: <ID:4> Page 13 (12) Subject: Pen Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:02:01 AM Color: Depth: Layer: Space: <ID:4> Subject: Pen Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:02:02 AM Color: Depth: Layer: Space: <ID:4> Subject: Text Box Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:02:08 AM Color: Depth: Layer: Space: <ID:4>15" Subject: Text Box Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:02:16 AM Color: Depth: Layer: Space: <ID:4>15" Subject: Pen Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:08:56 AM Color: Depth: Layer: Space: <ID:4> <ID :4> 15" <I D: 4> 15" Subject: Pen Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:08:58 AM Color: Depth: Layer: Space: <ID:4> Subject: Pen Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:12:16 AM Color: Depth: Layer: Space: <ID:4> Subject: Text Box Page: Page 13 Status: Author: mgarza Date: 12/21/2016 11:12:42 AM Color: Depth: Layer: Space: <ID:4>Valve on main? Subject: Pencil Page: Page 13 Status: Author: gmarshall Date: 12/28/2016 4:52:10 PM Color: Depth: Layer: Space: <ID:1>Provide Water Easement Subject: Pencil Page: Page 13 Status: Author: gmarshall Date: 12/28/2016 4:52:44 PM Color: Depth: Layer: Space: <ID:1>Provide Water Easement Subject: Pencil Page: Page 13 Status: Author: gmarshall Date: 12/28/2016 4:53:45 PM Color: Depth: Layer: Space: <ID:1>No tapping sleeve. Provide cut in tee with 12" valve. <ID:4>Valve on main? Subject: Pen Page: Page 14 Status: Author: mgarza Date: 12/21/2016 11:09:40 AM Color: Depth: Layer: Space: <ID:4> Page 14 (4) Subject: Pencil Page: Page 14 Status: Author: gmarshall Date: 12/28/2016 4:58:33 PM Color: Depth: Layer: Space: <ID:1>Do not place city details in plans. Contractor will be responsible for having an entire set with them. Reference the details only i.e. Std Detail 3090. Subject: Pencil Page: Page 14 Status: Author: gmarshall Date: 12/28/2016 5:00:21 PM Color: Depth: Layer: Space: <ID:1>Size? 12" or 8"? Subject: Pencil Page: Page 14 Status: Author: gmarshall Date: 12/28/2016 5:00:33 PM Color: Depth: Layer: Space: <ID:1>No Tapping sleeve. Subject: Pencil Page: Page 15 Status: Author: gmarshall Date: 12/28/2016 5:02:48 PM Color: Depth: Layer: Space: <ID:1>Preserve and protect existing storm drain installed with Freeport Parkway. See revised plans. Page 15 (1) SFS SECURITY FIRE SYSTEMS, INC.131 S. Tennessee St.McKinney, Texas 75069972.562.4409 (@ least 72 hours prior to digging) Subject: Pencil Page: Page 16 Status: Author: gmarshall Date: 12/28/2016 5:06:13 PM Color: Depth: Layer: Space: <ID:1>Posted speed of Freeport Parkway is 40 MPH. Please revise distances as necessary. Also, City requires an arrow board for any lane merges as a requirement not optional. Lane closure will be extremely limited as to time and duration... Page 16 (1) Subject: Pencil Page: Page 17 Status: Author: gmarshall Date: 12/28/2016 5:06:50 PM Color: Depth: Layer: Space: <ID:1>Piers are required for all headwalls out falling into creeks. Page 17 (2) Subject: Pencil Page: Page 17 Status: Author: gmarshall Date: 12/28/2016 5:07:13 PM Color: Depth: Layer: Space: <ID:1>Filter fabric? see City standards...