Westhaven Phase 2B-LR170109American Rehab & Inspections
(214) 536-2915
Created with the M qlL report generator Back
Project
Project Name
Westhaven Phase 2B Location
Street
Date
1/9/2017
Direction Of Survey
Upstream
City
Coppell
PO Number
Run Number
Purpose
Pre -Acceptance
Operator Name
John Henry
Completed
Yes
Comments
Pipe
Asset ID
SS -R @.50%
Pipe Size
8"
Pipe Material
Polyvinyl Chloride
Pipe Shape
Circular
Lining Method
Total Length
Length Surveyed
375.5
Year Laid
Year Renewed
Sewer Use
Sanitary
Manhole
Upstream MH
Number
8+09
Upstream MH Depth
UpstreamMH
Upstream MH Notes
Location
Downstream MH
4+39
Downstream MH
Number
Depth
Downstream MH
Downstream MH
Location
Notes
Amount of Flow
Signs Of Surcharge
No
Other
Media Number
Truck Number
Contractor Name
Cullum
Weather
Dry
VCR Start Index
VCR End Index
Created with the M qlL report generator Back
Project Name:
Westhaven Phase 2B
Date: 1/9/2017
Asset ID: SS -R .50%
Location: Street
Upstream MH Number:
8+09
Length Surveyed: 375.5
Downstream MH Number:
4+39
Run Number:
Direction Of Survey:
Upstream
Pipe Size: 8"
Pipe Material: Polyvinyl
Chloride
ID Number: 8+09
(3.0) - Begin Survey
(5.0) - Lateral 9 O'Clock
(57.0) - Lateral 9 O'Clock •••
(107.7) - Lateral 9 O'Clock •--
(142.6) - Lateral 3 O'Clock •..
(159.9) - Lateral 9 O'Clock
(195.2) - Lateral 3 O'Clock
(210.5) - Lateral 9 O'Clock
(252.1) - Lateral 3 O'Clock
(262.1) - Lateral 9 O'Clock
(310.1) - Lateral 9 O'Clock •••
(325.8) - Lateral 3 O'Clock •••
(362.1) - Lateral 9 O'Clock ••• ((�
(375.5) - End Survey
Total Distance: 375.5 ID Number: 4+39
Created with the ;30S report generator Back
Project Name:
Westhaven Phase 2B Z`
Date: 1/9/2017
Asset ID: SS -S @.50%
Location: Street
Upstream MH Number:
2+67 Co.
Length Surveyed: 168.7 Downstream MH Number:
1+00
Run Number:
Direction Of Survey:
Upstream
Pipe Size: 8"
Pipe Material: Polyvinyl
Chloride
0) ID Number: 2+67 Co.
(3.0) - Begin Survey
(68.0) - Lateral 9 O'Clock ••-
(113.7) - Lateral 9 O'Clock •••
(160.0) - Lateral 9 O'Clock
(168.7) - End Survey
Total Distance: 168.7 (0) ID Number: 1+00
Created with the ;3 report generator Back
Project Name:
Westhaven Phase 2B
Date: 1/9/2017
Asset ID: SS -R @.50%
Location: Street
Upstream MH Number: 4+39
Length Surveyed: 264.1
Downstream MH Number:
1+70
Run Number:
Direction Of Survey:
Downstream
Pipe Size: 8"
Pipe Material: Polyvinyl
Chloride
ID Number: 4+39
(3.0) - Begin Survey
(43.0) - Lateral 3 O'Clock •••
(95.2) - Lateral 3 O'Clock •••
(145.3) - Lateral 3 O'Clock —
(198.9) - Lateral 3 O'Clock ---
(248.7) - Lateral 3 O'Clock •..
(264.1) - End Survey •••
Total Distance: 264.1 (0) ID Number: 1+70
Created with the report generator Back
Project Name: Westhaven Phase 2B
Date: 1/9/2017
Asset ID: SS -R @.74%
Location: Street
Upstream MH Number:
1+70
Length Surveyed: 75.6
Downstream MH Number:
1+00
Run Number:
Direction Of Survey:
Downstream
Pipe Size: 8"
Pipe Material: Polyvinyl
Chloride
(3.0) - Begin Survey
(11.7) - Lateral 3 O'Clock
(75.6) - End Survey
Total Distance: 75.6
ID Number: 1+70
ID Number: 1+00