Loading...
Westhaven Phase 2B-LR170109American Rehab & Inspections (214) 536-2915 Created with the M qlL report generator Back Project Project Name Westhaven Phase 2B Location Street Date 1/9/2017 Direction Of Survey Upstream City Coppell PO Number Run Number Purpose Pre -Acceptance Operator Name John Henry Completed Yes Comments Pipe Asset ID SS -R @.50% Pipe Size 8" Pipe Material Polyvinyl Chloride Pipe Shape Circular Lining Method Total Length Length Surveyed 375.5 Year Laid Year Renewed Sewer Use Sanitary Manhole Upstream MH Number 8+09 Upstream MH Depth UpstreamMH Upstream MH Notes Location Downstream MH 4+39 Downstream MH Number Depth Downstream MH Downstream MH Location Notes Amount of Flow Signs Of Surcharge No Other Media Number Truck Number Contractor Name Cullum Weather Dry VCR Start Index VCR End Index Created with the M qlL report generator Back Project Name: Westhaven Phase 2B Date: 1/9/2017 Asset ID: SS -R .50% Location: Street Upstream MH Number: 8+09 Length Surveyed: 375.5 Downstream MH Number: 4+39 Run Number: Direction Of Survey: Upstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 8+09 (3.0) - Begin Survey (5.0) - Lateral 9 O'Clock (57.0) - Lateral 9 O'Clock ••• (107.7) - Lateral 9 O'Clock •-- (142.6) - Lateral 3 O'Clock •.. (159.9) - Lateral 9 O'Clock (195.2) - Lateral 3 O'Clock (210.5) - Lateral 9 O'Clock (252.1) - Lateral 3 O'Clock (262.1) - Lateral 9 O'Clock (310.1) - Lateral 9 O'Clock ••• (325.8) - Lateral 3 O'Clock ••• (362.1) - Lateral 9 O'Clock ••• ((� (375.5) - End Survey Total Distance: 375.5 ID Number: 4+39 Created with the ;30S report generator Back Project Name: Westhaven Phase 2B Z` Date: 1/9/2017 Asset ID: SS -S @.50% Location: Street Upstream MH Number: 2+67 Co. Length Surveyed: 168.7 Downstream MH Number: 1+00 Run Number: Direction Of Survey: Upstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride 0) ID Number: 2+67 Co. (3.0) - Begin Survey (68.0) - Lateral 9 O'Clock ••- (113.7) - Lateral 9 O'Clock ••• (160.0) - Lateral 9 O'Clock (168.7) - End Survey Total Distance: 168.7 (0) ID Number: 1+00 Created with the ;3 report generator Back Project Name: Westhaven Phase 2B Date: 1/9/2017 Asset ID: SS -R @.50% Location: Street Upstream MH Number: 4+39 Length Surveyed: 264.1 Downstream MH Number: 1+70 Run Number: Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride ID Number: 4+39 (3.0) - Begin Survey (43.0) - Lateral 3 O'Clock ••• (95.2) - Lateral 3 O'Clock ••• (145.3) - Lateral 3 O'Clock — (198.9) - Lateral 3 O'Clock --- (248.7) - Lateral 3 O'Clock •.. (264.1) - End Survey ••• Total Distance: 264.1 (0) ID Number: 1+70 Created with the report generator Back Project Name: Westhaven Phase 2B Date: 1/9/2017 Asset ID: SS -R @.74% Location: Street Upstream MH Number: 1+70 Length Surveyed: 75.6 Downstream MH Number: 1+00 Run Number: Direction Of Survey: Downstream Pipe Size: 8" Pipe Material: Polyvinyl Chloride (3.0) - Begin Survey (11.7) - Lateral 3 O'Clock (75.6) - End Survey Total Distance: 75.6 ID Number: 1+70 ID Number: 1+00 Created with the -W;)DSMQP report generator Back Y