Prologis Park-CS170119
Priscilla Martinez
From:George Marshall
Sent:Monday, January 09, 2017 10:28 AM
To:Dillon, Casey; Marcus Marion
Cc:Chet Coker; Chance Bolton; Gossett, Robert; Matthew Mabry; Priscilla Martinez
Subject:RE: Proposed Prologis Park One Twenty One Buildings 1, 2, 3 and 6 - Rone Project
No. 15-20061.1
Attachments:LTR 2016-12-05 Variance Request.pdf; 15-20061 Pavement Variance Lettter
12.28.16.pdf; Park 121 Pavement Variance Request ; 15-20061.1 Addendum #2
1-6-2017.pdf
Casey,
Based on the information presented (and attached), the City of Coppell will accept your request for variance to lime
treatment of the fire lanes (providing 8” thick concrete as opposed to 6” with 8” lime treatment) and your request to
drive over the steel outside the fire lanes (only private paving).
Due to discussion from the Geotech regarding sandy soils, we need to look at the work being done for Northwest
Drive. It may be prudent to either provide cem-lime stabilization or cement stabilization. We need to discuss further,
together.
Thank You, George
George S. Marshall, P.E.
Engineering Manager
Engineering & Public Works
City of Coppell, TX
972-304-3562 (office)
www.coppelltx.gov
From: Dillon, Casey \[mailto:cdillon@prologis.com\]
Sent: Friday, January 06, 2017 4:17 PM
To: George Marshall <GMarshall@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov>
Cc: Chet Coker <ccoker@mycon.com>; Chance Bolton <cbolton@mycon.com>
Subject: FW: Proposed Prologis Park One Twenty One Buildings 1, 2, 3 and 6 - Rone Project No. 15-20061.1
Importance: High
George and Marcus,
Please see attached letter from our geotech regarding lime at the Park 121 pavement sections. They explain that the
sandy soil would not benefit from lime, and thus the design has added an inch of concrete already. “…Therefore, the
lime treatment of the fire lane pavement subgrade is not necessary for this project.”
Please let us know if this will suffice, we would like to be able to reschedule Monday’s pavement pour.
Thank you,
1
CASEY W. DILLON
Vice President, Development Manager
Prologis | Local partner to global trade™
2021 McKinney Avenue, Suite 1050 Dallas, Texas 75201-2237 | United States
Direct +1 972 884-9253 | Mobile +1 469 236 1434 | cdillon@prologis.com
www.prologis.com | Follow us on LinkedIn and Twitter
The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential
and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons
or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the
sender and delete the material from any computer.
From: Fanny Burrow \[mailto:fburrow@roneengineers.com\]
Sent: Friday, January 06, 2017 3:41 PM
To: Dillon, Casey
Cc: Mark Gray; Lisa Furin; Thusha P. Thushanthan
Subject: Proposed Prologis Park One Twenty One Buildings 1, 2, 3 and 6 - Rone Project No. 15-20061.1
Casey,
Attached is Rone’s Geotechnical Addendum #2 for the Proposed Prologis Park One Twenty One, Buildings 1 , 2, 3 and
6 Near NWC of West Sandy Lake Road and North Coppell Road in Coppell, Texas.
If you have any questions, please contact Thusha or Mark Gray at 214.630.9745.
Thanks
Fanny Burrow