Loading...
Prologis Park-CS170109 Priscilla Martinez From:Dillon, Casey <cdillon@prologis.com> Sent:Monday, January 09, 2017 10:32 AM To:George Marshall; Marcus Marion Cc:Chet Coker; Chance Bolton; Gossett, Robert; Matthew Mabry; Priscilla Martinez Subject:RE: Proposed Prologis Park One Twenty One Buildings 1, 2, 3 and 6 - Rone Project No. 15-20061.1 Follow Up Flag:Follow up Flag Status:Flagged Thanks for the consideration George. I’ll dig into the below NW dr. comment and get back with you, we can then plan a call with the design consultants. CASEY W. DILLON Vice President, Development Manager Prologis | Local partner to global trade™ 2021 McKinney Avenue, Suite 1050 Dallas, Texas 75201-2237 | United States Direct +1 972 884-9253 | Mobile +1 469 236 1434 | cdillon@prologis.com www.prologis.com | Follow us on LinkedIn and Twitter The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the sender and delete the material from any computer. From: George Marshall \[mailto:GMarshall@coppelltx.gov\] Sent: Monday, January 09, 2017 10:28 AM To: Dillon, Casey; Marcus Marion Cc: Chet Coker; Chance Bolton; Gossett, Robert; Matthew Mabry; Priscilla Martinez Subject: RE: Proposed Prologis Park One Twenty One Buildings 1, 2, 3 and 6 - Rone Project No. 15-20061.1 Casey, Based on the information presented (and attached), the City of Coppell will accept your request for variance to lime treatment of the fire lanes (providing 8” thick concrete as opposed to 6” with 8” lime treatment) and your request to drive over the steel outside the fire lanes (only private paving). Due to discussion from the Geotech regarding sandy soils, we need to look at the work being done for Northwest Drive. It may be prudent to either provide cem-lime stabilization or cement stabilization. We need to discuss further, together. Thank You, George 1 George S. Marshall, P.E. Engineering Manager Engineering & Public Works City of Coppell, TX 972-304-3562 (office) www.coppelltx.gov From: Dillon, Casey \[mailto:cdillon@prologis.com\] Sent: Friday, January 06, 2017 4:17 PM To: George Marshall <GMarshall@coppelltx.gov>; Marcus Marion <MMarion@coppelltx.gov> Cc: Chet Coker <ccoker@mycon.com>; Chance Bolton <cbolton@mycon.com> Subject: FW: Proposed Prologis Park One Twenty One Buildings 1, 2, 3 and 6 - Rone Project No. 15-20061.1 Importance: High George and Marcus, Please see attached letter from our geotech regarding lime at the Park 121 pavement sections. They explain that the sandy soil would not benefit from lime, and thus the design has added an inch of concrete already. “…Therefore, the lime treatment of the fire lane pavement subgrade is not necessary for this project.” Please let us know if this will suffice, we would like to be able to reschedule Monday’s pavement pour. Thank you, CASEY W. DILLON Vice President, Development Manager Prologis | Local partner to global trade™ 2021 McKinney Avenue, Suite 1050 Dallas, Texas 75201-2237 | United States Direct +1 972 884-9253 | Mobile +1 469 236 1434 | cdillon@prologis.com www.prologis.com | Follow us on LinkedIn and Twitter The information transmitted, including any attachments, is intended only for the person or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited, and all liability arising therefrom is disclaimed. If you received this in error, please contact the sender and delete the material from any computer. From: Fanny Burrow \[mailto:fburrow@roneengineers.com\] Sent: Friday, January 06, 2017 3:41 PM To: Dillon, Casey Cc: Mark Gray; Lisa Furin; Thusha P. Thushanthan Subject: Proposed Prologis Park One Twenty One Buildings 1, 2, 3 and 6 - Rone Project No. 15-20061.1 Casey, Attached is Rone’s Geotechnical Addendum #2 for the Proposed Prologis Park One Twenty One, Buildings 1 , 2, 3 and 6 Near NWC of West Sandy Lake Road and North Coppell Road in Coppell, Texas. If you have any questions, please contact Thusha or Mark Gray at 214.630.9745. Thanks Fanny Burrow 2 Office Manager 8908 Ambassador Row Dallas, Texas 75247 214.630.9745 214.630.9819 (fax) 469.569.1640 (cell) fburrow@roneengineers.com 3