Loading...
Copperstone-CS 951221 (2) CITY OF COPPR~ L PLANNING DEPARTMENT STAFF REPORT CASE #: S-Il00, COPPER STONE ADDmON, TEMPORARY BATCH PLANT P & Z HEARING DATE: December 21, 1995 C.C. HEARING DATE: January 9, 1996 LOCATION: West of the intersection of Parkway Boulevard and Cowboy Drive. SIZE OF AREA: 62.661 acres, containing 129 single-family lots Concrete batch plant area: 150' x 150' CURRENT ZONING: SF-12 (Single Family-12) REQUEST: SF-12, S.U.P. (Single Family-12, Special Use Permi0 APPLICANT: Developer: Briscoe Clark Co., Ltd 8300 Douglas Ave Suite 800 Dallas TX 75225 (214) 706-9190 Dowdey, Anderson & Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas TX 75248 (214) 931-0694 HISTORY: The property is part of a former 766-acre tract which included land the City purchased in 1982 for parks and municipal buildings. In the purchase contract the City agreed not to change the subdivision regulations applicable at the time to the balance of the 766 acres. A change of zoning on the portion to be platted as Copper Stone from MF-2 to SF-9 and SF-12 received approval in June of 1992, with the ordinance taking effect in June of 1993. A preliminary plat for Copper Stone received approval in June of 1992, and on June 8, 1993, City Council approved a one-year Item # 7 extension. The final plat received approval in March of 1994, but was never recorded. Consequently, the final plat became null and void on September 8, 1994. However, because a final plat was submitted prior to June 8, 1994, by current regulation the preliminary plat is still valid. The Planning and Zoning Commission approved a final plat on September 21, 1995. TRANSPORTATION: Parkway Boulevard is a four-lane divided street (C4D) contained within a right-of-way which varies in width from 80 to 85 feet. SURROUNDING LAND USE & ZONING: North - South - East - West - Vacant; Retail zoning High School; Commercial zoning Andy Brown West Park; TC zoning Vacant; SF-7 and PD-SF 7 zoning COMPREHENSIVE PLAN: The 1987 Comprehensive Plan showed high-density residential use as the most appropriate for this area. The current revision of the plan will show the area as more suitable for lower density residential uses. DISCUSSION: This concrete batch plant will be used to mix concrete to pave the streets in the Copper Stone Addition. The plant is scheduled for erection in January of 1996 on the northwest comer of the subdivision and will remain on site for approximately sixty (60) days. As there are no existing homes on all four sides of the concrete batch plant and the nearest house is approximately 800' from the plant, staff believes that the surrounding residential neighborhoods will not be adversely impacted by the presence of the temporary batch plant. R~CO~ATION: Staff recommends approval of this special use permit subject to the following condition be met: 1. Applicant obtain a permit from the State. 1) Approve the Temporary Batch Plant 2) Disapprove the Temporary Batch Plant 3) Modify the Temporary Batch Plant ATFACHMENTS: 1) Letter from applicant 2) Site Plan 3) Diagram of concrete batch plant 4) Departmental Comments Item # 7 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: S.-1150, Copper Stone Addition. Tem~rarv Batch Plant. zoning ckange pon Special Use Permit), to ~ the location of a temporary concrete batch intersection of Parkway Blvd. and Cowboy Dr Tkunnan, Inc. COMMENT STATUS: PRELIMINARY /FINAL SUBSEOUENT TO P&Z 1. Also need a permit from the State.