Loading...
Westhaven Phase 2B-LR161219TESTED FOR:DATE: 12/19/16 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 72 12/19/16 FG-2.0 1 21.6 102.7 21.9 101 98 1-A 73 12/19/16 FG-1.0 1 21.6 102.7 22.7 99 96 1-A 74 12/19/16 FG 1 21.6 102.7 22.2 99 97 1-A 75 12/19/16 FG-2.0 1 21.6 102.7 23.4 99 96 1-A 76 12/19/16 FG-1.0 1 21.6 102.7 21.8 100 97 1-A 77 12/19/16 FG 1 21.6 102.7 22.3 100 98 1-A 78 12/19/16 FG-2.0 1 21.6 102.7 23.0 100 97 1-A TEST LOCATION: 72 73 74 75 76 77 78 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Water Line along Windsor Road at Station 11+00 Water Line along Johns Avenue at Station 5+00 Water Line along Johns Avenue at Station 5+00 Water Line along Johns Avenue at Station 8+00 Dallas, Texas COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % PERCENT COMPACTION REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Cullum Construction 162997-5 DATE Westhaven Phase 2B - Utilities Coppell, Texas TECHNICIAN: SOIL ID NUMBER COMPACTION TESTS Water Line along Johns Avenue at Station 8+00 TEST NO. Water Line along Johns Avenue at Station 5+00 J. Bura Water Line along Johns Avenue at Station 8+00 IN PLACE DRY DENSITY PCF TESTED FOR:DATE: 12/19/16 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 79 12/19/16 FG-1.0 1 21.6 102.7 21.8 99 96 1-A 80 12/19/16 FG 1 21.6 102.7 22.5 98 95 1-A TEST LOCATION: 79 80 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Cullum Construction Dallas, Texas Westhaven Phase 2B - Utilities 162997-5A Coppell, Texas TECHNICIAN: J. Bura TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Water Line along Windsor Road at Station 11+00 Water Line along Windsor Road at Station 11+00