Loading...
Freeport NIP(4)-CS 960228Coppell, Texas 75019 February 28, 1996 P.O. Box 478 Coppell, Texas 75019 214-462-0022 MEPC American Properties Inc. 15303 Dallas Parkway Suite 100, LB 10 Dallas, Texas 75248 RE: MEPC Phase H Development Fee Assessment Dear Sir: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee calculations for MEPC Phase II. On January 24, 1996, the water impact, waste water impact, sewer tap inspection and utility final inspection fees were paid. The remaining fees are due either at the issuance of the water meter or the issuance of the building permit. The original development fees for MEPC Phase II were revised on February 17, 1996 to show only one Water Impact Fee for the fire line meter. Therefore, you have overpaid your Water Impact Fee in the amount $1,125.00. A check will be processed to you in that amount. If you should have any questions please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Ted Dutt, Interim Utilities Superintendent Greg Jones, Chief Building Official Per Birdsall, Interim Street Superintendent Rick Wieland, Parks Development Coordinator CITY OF COPPELL DEVELOPMENT FEES Date: Project: February 28, 1996 MEPC Phase H TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee 8,325.00 8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee 400.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 3,600.00 (100% due prior to Council Approval) .i.i.~i~i.i ........................................ Sewer Tap Inspection Fee ~iii~i~ -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee ~iii~!i~iiiii~iii~~ -0- (100% due at Issuance of Building Permit) i~iiiiiii Water Meter Fee (Domestic) 186.65 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 105.00 -0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) 5,102.65 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee -0- -0- Street Escrow -0- -0- (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2 % of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $18,004.30 $11,925.00 TOTAL OUNT PmOa TO COUNCIL APPROVAL * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL ENGINEERING DATE: February 17, 1996 TO: Mike Martin, Assistant City Engineer FROM: Ted Dutt, Interim Utilities Superintendent RE: Development Fees for MEPC PHASE II (Revision) The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 -2" Domestic Meter/s = 8 ESU's 1 -2" Irrigation Meter/s = 8 ESU's 1 -8" Fireline Meter/s = 2.5 ESU's Total 18.5 ESU's @ $450.00 ea = $8°325.00 100% due prior to Council approval of the final plat. WastewaterImpact 1 - 2" Domestic Meter/s = 8 ESU's Total 8 ESU's ~ $450.00 ea = $3,600.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections @ $100.00 each. = $400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 2 Connections ~ $100.00 each = $. 200.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ S 50.00/lot = $50.00 100% due prior to issuance of building permit. Water Heter Fee (Domestic) 1 - 2" Domestic Meters @ $586.65 = $186.65 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Heter Fee (Irrigation/Fireline) 1 - 2" Irrigation Meter/s @ 2 - S" Fireline Meter/s @ $ - Fireline Meter/s @ $ Total 100% due prior to issuance of water meter/s. Water HeterDeposit (Multi-Family or Non-Residential) 3 Meters ~ $35.00 ea = $105.00 100% due prior to issuance of water meters. Si 86.65 ea. = $186.65 $2,458.00ea. = $4,916.00 $5 o 102.65 Irrigation Meter Deposit 1 Meters ~ $35.00 ea = $35.00 100% due prior to issuance of water meters. To' From: Jennifer Armstrong, Finance Director Kenneth M. Griffin, P.E., Asst. City Manager/City Engineer Reimbursement of Water Impact Fee for MEPC Phase H Date: February 28, 1996 On February 17, 1996, the development fees for MEPC Phase II were revised to show only one water impact fee for the fire line meter making a reduction in the fees of $1,125.00 (see attached fee assessment). The initial assessment $13,050.00 was paid on January 24, 1996. Therefore a check in the amount of $1,125.00 should be mailed to: MEPC American Properties Inc. 15303 Dallas Parkway Suite 100, LB 10 Dallas, Texas 75248 Please feel free to call me if you have any further questions.