Security Fire Systems-CS170119T H E C 1 T V O F
C0:1PPELL
X A C` t 8
January 19, 2017
Jonathan D. Hake, P.E.
Cross Engineering Consultants
131 Tennessee St.
McKinney, Texas 75069
RE: SFS Addition Lot 1 Block A
Construction Plan Review Comments
Dear Mr. Hake:
The City of Coppell has reviewed the revised plans for the referenced addition. These plans appear
to meet our current minimum standards All contractors and subcontractors onsite must have a copy
of the plans approved by the City of Coppell.
All fees must be paid prior to release of this project for construction. The City charges a 2%
inspection fee for all private construction outside the building's footprint. This includes dirt work,
paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all
installations in the public right-of-way or easement, the City charges a 4% fee. A check for
inspection fees made to the City of Coppell should be submitted to this office along with the
Construction Development Permit Application and a copy of the Construction Site Notice. For
your convenience a spreadsheet is attached to the permit application for use in calculating the
inspection fees. A copy of the contract(s) should be attached for verification purposes.
If you have any questions, please contact me at your convenience.
Sincerely,
George S. Marshall, P.E.
Engineering Manager
Office Phone: (972) 304-3562
gmarshall@coppelltx.gov
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972 402 0022 * FAX 972 304 3673