Copperstone-CS 951218The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
P.O. Box 478
Coppell, Texas 75019
214-462-0022
December 18, 1995
J.F. Clack, Inc.
Rt. 1, Box l17A
Caddo Mills, Texas 75135
RE: Copperstone
Dear Jimmy,
In accordance with your request, inspection service was provided by the City of Coppell'
Engineering Department at the referenced location on Saturday, December 16, 1995. The
overtime rate including salary and benefits is $30.00 per hour. Seven hours were charged to
your company on that date.
Please send a check for $210.00 payable to the City of Coppell to the following address:
City of Coppell
Finance Department
P.O. Box 478
Coppell, TX 75019
Attention: Jennifer Armstrong, Interim Finance Director
If you should have any questions, please contact me at (214) 304-3685.
Construction Inspector
cc: Doug Stevens, Engineering Technician
Finance Department
file/ovt, ltr
P.O2
,/.F.. CL, RC/(,/nc.
Rt. 1 Box 117A
CIKI~O Mills, Texas 75136
¢903) 527-3~79
December 14, 1995
G&rreth Campbell
255 Pa=kway Blvd.
Coppell, Texas 75019
Reft Utility Improvement;~ -' Copperstone
Dear. Hr. Campbell,
We requeoc pe.n~lss£,~;l ~o work on Satur~ay~ [~;.-F~,~r ~6, on the
Copperstone pro3ect. We w.~.~l be layln$ Sewer l.~,~(, '~a Storm Sewers.
~espectfully,
Jify Clack
President