Loading...
Westhaven Phase 2B-LR170109 (3)American Rehab & Inspections, INC. & IN SP SP Q' (214) 536-2915 .CP _ Fc LOW PRESSURE AIR TEST FOR GRAVITY SANITARY SEWER - �oZ between successive les: aro-291;5 Cn Test ProAced�section sewer be inti du ed ino the ieline until 4.0 psa ch pipeline p gauge pressure has bee tra4 t IS1ON - time the flow .of air shall be. reduced and the internal air pressure shall be maintainedwa��3� and 4.5 psi gauge for at least two :(2) minutes to allow the air temperature to come to equilibri with the temperature of the pipe walls. Pressure in the pipe shall be constantly monitored by a age and hose Q� arrangement separate from the hose used to introduce air into the line. Pressure in the pi )Y gib allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure shall be used to determine that time lapse required for the air pressure to drop to 2.5 psi gauge. If the time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following table, the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table, the contractor shall make corrections to reduce the leakage to acceptable limits. , Contractor: Cullum Date: 1/9/17 Project: Westhaven Phase 2B Job#: Location: Tested By: Luis Inspector:_ Matthew Mabry City Of Coppell Line Information Test Results Air Test Mandrel Line Station to Station Size Linear Feet Time Passed Passed SS -R 8+09-4+39 8" 375 8:52 Yes Yes 4+39-1+70 8" 264 8:52 Yes Yes 1+70-1+10 8" 75 8:52 Yes Yes SS -S.. 2+67-1+00 8" 169 8:52 Yes :. Yes Contractor: Cullum Date: 1/9/17 Project: Westhaven Phase 2B Job#: Location: Tested By: Luis Inspector:_ Matthew Mabry City Of Coppell