Copperstone-CS 951130 (2)I I
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: S-Il00, Comer Stotw Addigio~. Te~_ rarv Batch Plant. zoning change
from $F-12 (Single-Family-12) to SF-12-$.U.P. (Single Family-12,
Special Use Permit), to allow the location of a temporary concrete batch
plant for 60 days on the Copper Stone sub, vision, located west of the
intersection of Parkway Blvd. and Cowboy Drive, at the request of Glenn
Tkurman, Inc.
DRC DATE: November 30, 1995 & December 7, 1995
CONTACT: Ken Griffin, P.E., Assistant City Manager/City Engineer (304-3679)
COMMENT STATUS: ~PRELIMINARY FINAL SUBSEO, UENT
TO P&Z
1. Also need a permit from the State.