Loading...
WA9302-CS 951209SHIMEK, JACOBS FINKLEA CONSTRUCTION REPORT r oje. r%. 94155 Date: 12-9-95 Prepared Is This A By: Matt Hickey ~ Working Day? U~ Yes ~3 No Owner: City of Coppell Project Name: Village Parkway Ground Storage Reservoir No. 2 Construction Contractor: NATGUN Time Allotted: 300 Used: 140 Number Superintendent: Jim Fisher Men Working: 45+ Hours: 10:30 AM to 3:15 PM Weather Conditions: Clear and Cold Site Conditions: The site was dry and well maintained. WORK DESCRIPTION 1. Steel workers were completing the installation of steel reinforcement at various locations around the perimeter of the tank and around the inlet and outlet pipes. 2. The ~rst of approximately 200 concrete trucks amved atthejob site around 10:45 AM. Most ofthetraffic control into the site was provided by Redi-Mix. 3. Concrete was loaded into two concrete pump trucks. At approximately 11:00 AM, concrete began to be pumped into the slab. Two washout pits were provided at the job site for the concrete trucks. 4. Approximately 40 % of the slab was poured by 3:00 PM. 5. Bob Barbarisi indicated that the outer perimeter of the tank would receive a curing compound and the inner perimeter would receive a 3 inch water cure. 6. Approximately twelve concrete tracks were on the job site at any given time. Two PumpCo concrete pump trucks, one forklift and a front-end loader were on the job site. 7. Lime and crushed rock were placed at various locations around the temporary access road. UNPRECAST PRESTRESSEI 3 PREFERRED I!,l~d,h,l~ci! 1~!2~ Natgun Corporation Precast Concrete Tanks Eleven Teal Road Wakefield, MA 01880-1223 Telephone 617-246-1133 Via Fax: (214) 304-3673 Mr. Larry Davis Construction Inspector City of Coppell Post Office Box 478 Coppell, Texas 75019 Reference: 6.0 MG Water Storage Tank Coppell, TX (95C11) Dear Larry: This letter will serve as our formal request for your construction inspection services on Saturday, December 9, 1995 for the tank floor pour. As stipulated in the Contract, we will be responsible for paying for your overtime cost. Should you have any questions, kindly call. Very truly yours, Robert V. Barbarisi, Jr. Project Manager RVB :kid CC: Jim Fisher SOUTHWEST OFFICE: Suite 811, 8111 Preston Road, Dallas, TX 75225-6316, Telephone 214-368-3306 MIDWEST OFFICE: Suite 211, 2610 Sheridan Road, Zion, IL 60099-2615, Telephone 708-872-8806 M~D-ATLANT~c OFFtCE: Suite 100, 3650 Winding Way, Newtown Square, PA 19073, Telephone 610-353-8315