Loading...
Westhaven Phase 2B-LR170126 (2)TESTED FOR:DATE: 01/26/17 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 157 01/26/17 FG-2.0 130758/1 21.6 102.7 23.7 99 96 1-A 158 01/26/17 FG-1.0 130758/1 21.6 102.7 24.0 100 97 1-A 159 01/26/17 FG-1.0 130758/1 21.6 102.7 23.5 98 96 1-A 160 01/26/17 FG-2.0 130758/1 21.6 102.7 23.2 100 98 1-A 161 01/26/17 FG-1.0 130758/1 21.6 102.7 24.1 99 96 1-A 162 01/26/17 FG-1.0 130758/1 21.6 102.7 23.6 99 96 1-A TEST LOCATION: 157 158 159 160 161 162 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Storm Sewer Lateral R-4 at Station 1+10 Storm Sewer Lateral U-1 at Station 1+10 Storm Sewer Lateral R-5 at Station 1+10 Dallas, Texas COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % PERCENT COMPACTION REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Cullum Construction 162997-21 DATE Westhaven Phase 2B - Utilities Coppell, Texas TECHNICIAN: SOIL ID NUMBER COMPACTION TESTS Storm Sewer Lateral Q-2 at Station 1+10 TEST NO. Storm Sewer Lateral R-4 at Station 1+10 J. Bura Storm Sewer Lateral R-5 at Station 1+10 IN PLACE DRY DENSITY PCF