Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Prologis Park-LR170214
Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Project Name: Prologis Park One Twenty One Permit Number(s): TXR15Date: 2/14/2017 Reason for inspection: 7 Day Contractor: Prologis, L.P. Qualifications: Shown within SWP3Inspector: Juan Weather: Cloudy/Wet Job:Prologis Park One Twenty One. Contr:Prologis, L.P. 32.97976, -97.011641 ControlsControl StatusActions Required Construction Entrance/Exit Installed - CompliantNone Silt Fence Installed - See ActionsRepair Inlet Protection Installed - CompliantNone Rock / Sandbag Berm Installed - See ActionsClean Sediment Traps Installed - CompliantNone Vegatative Buffer Strips Installed - CompliantNone Erosion Control Mats Installed - CompliantNone Wattes / Erosion logs Installed - CompliantNone Concrete Wash area Installed - CompliantNone Fuel Area containment Installed - CompliantNone Velocity Dissipation devices Installed - CompliantNone Temporary Stabilization Installed LaterNone Permanent Stabilization Installed LaterNone Copyright © 2017 Project Compliance,LLC. All Rights Reserved. The site is approximately in the following construction stage: Utility, forming walls, and building construction. Locations of Discharges of Sediment or Other Pollutants from the Site: None at this time. Locations of BMPs that need to be Maintained: Rock berm at culvert needs to be cleaned. Small gap needs to be closed at Freeport Pkwy. Repair section of the silt fence damaged at long channel. Repair section where residual could get under the silt fence at E side. Repair section at E side where sediment is to the top up the fence. Locations of BMPs that failed to operate as designed or proved inadequate: None at this time. Locations where additional BMPs are needed: Additional Notes: Rock berm and curlex were installed at outfall pond. New curb inlet was protected. New conversation entrance was installed at new pavement. Curlex was installed at slope. Maintain control as noted above. I certify under penalty of law that this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Date: ____________________2/14/2017 Inspector: _____________________________ Prologis Park One Twenty One - 2/14/2017 Copyright © 2017 Project Compliance,LLC. All Rights Reserved. Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Photos of the site Rock berm and curlex were installed at outfall Rock berm at culvert needs to be cleaned. pond. Rock berm and curlex were installed at outfall New curb inlet was protected. pond. Copyright © 2017 Project Compliance,LLC. All Rights Reserved.Prologis Park One Twenty One - 2/14/2017 Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Photos of the site New conversation entrance was installed at new Curlex was installed at slope. pavement. Small gap needs to be closed at Freeport Pkwy. 2/14/2017 Copyright © 2017 Project Compliance,LLC. All Rights Reserved.Prologis Park One Twenty One - 2/14/2017 Major Site Observations Relating to SWP3 Implementation The following document was created based on the inspections of disturbed areas of the construction site that have not been finally stabilized, areas used for storage of materials that are exposed to precipitation, discharge locations, and structural controls for evidence of, or the potential for, pollutants entering the drainage system. Photos of the site Repair section of the silt fence damaged at long Repair section where residual could get under the channel.silt fence at E side. Repair section at E side where sediment is to the top up the fence. Copyright © 2017 Project Compliance,LLC. All Rights Reserved.Prologis Park One Twenty One - 2/14/2017