Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Spectrum-PT170214
A copy of the approved permit must be on the job site at all times. CC: Applicant r H t C_T T r D r Page l of 4 Public Works COFPELL Permit File Rei'. 0612012 Orig. to Project File f r 4 RIGHT -©F -WAY USE PERMIT APPLICATION Permit valid for 90 calendar days.from date of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below) Date of Submittal: 2-13-17 Applicant's Job # / 'Work Order # 1113121 PERMIT FEE: $100.00 (No charge to Utility Companies with approved FranchiseIROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes (* No C' F] Plans provided and approved (Erosion Controll5ofety fences must be installed prior to beginning work) Project Name/Location or address Next ERA Fiber Net 1441 S Beltline Rd General Contractor GTI Contact# 972-329-9933 E-mail address to return permit mike@gardner100 . com Representative: Kevin Causey Franchise Telephone #: 214-394-4281 Company: E-mail address: Kevin. Causey@charter . com (for contact if neededlif e-mailof approved permit is desired/permit cannot be e-mailed unless complete) Utility Company Represented: C Oncor Electric Delivery C' Atmos Energy C Verizon C SBC/ AT&T C: Time 'Warner Cable C CoSery Electric/Gas C Other General Description of Work lir, accordance with Ord. No. 2001-9441: PLEASE ATTACH PLAN OF PROPOSE© WORK 10` pull through TWC conduit, 260' pull through customer conduit to bld. Estimated Start Date 2 -1 7 -17 Estimated Completion Date* 3 -17 -17 * Completion requires submittal of Completion Verification Notice (see page 4) ,-Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: C% Yes C No r4s removal of existing streets, alleys, or sidewalks necessary? C` Yes ( No if YES, project must have City inspection prior to concrete replacement Right-of-Wav Use Permit ADDlication Page 2 of 4 Representative(s) of the Contractor must Adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972462-5155. YAny excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department a 972-304-3679 YAttach barricade plan 1 trench safety plan if a lane or street closure is required. NOTE. Street closures are allowed from 9.00 a.m. until3:30 p.m. ONLY unless otherwise approved by City Engineer. Attach Work Order (franchise only) and/or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972-462-5156 to schedule 48 hours prior to beginning work.. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer(omoellm.gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.) Kevin Causey 2-13-17 Signature of Utility Company Representative Date Mike Hulvey Signature of Contractor Representative 2-13-17 Date 14 February 2017 Signature of City Representative Date Comments (NOTE; Notify City Inspector at 972-304--3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell.. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T K S- C I T Y • 0 F COPFELL A y UTILITY RELOCATION CHECKLIST FOR WORK—WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: Page 3 of 4 1.A copy of the valid approved City of Coppell permit is required on the project at all times. 7Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3.Proper erosion control measures must be taken. 4.Follow Texas MUTCD standards for work in traffic zones. 5.Sod is to be replaced when necessary. Irrigation repairs must be performed in a timely manner. 7 Follow OSHA recommended trench safety at all times. $.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS manholes. ,,Densities may be required in trench lines (ASTM). 10.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:00 a.m, or after 3:00 p.m. 12.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following: CITY OF COPPELL UTILITIES DIVISION coppelltx.gov/utilitv-operations-division 9721452-5155 CITY OF COPPELL ENGINEERING DEPT. 972/ 304-3679 HOMEOWNER ASSOCIATIONS 972/ 304-3678 (Planning Department) TIME WARNER CABLE 2141320-5455 (Mike Rasmussen) AT&T LOCAL NETWORK 214/ 215-3031 (Rich Millerunan) COSERV Gas & Electric 940/ 321-7800 x 7+624 (Greg Ward) EXPLORER PIPELINE 9181493-5100 (Patrick Nwakoby) ON+COR Electric Delivery 9721323-8917 (Larry Redick) VERIZON COMMUNICATIONS 972/ 318-5277 FEDERAL EMERGENCY MGMT. ADMIN. 940/ 898-5138 TEXAS COMM. on ENVIRONMENTAL QUALITY 8171 588-5800 DENTON CO. LEVEE DISTRICT 2141352-5118 (Richard Hightower) Atmos Energy 972/360-4428 (Gary Dickinson) 1 800 DIG TESS for Iine locates (344 -8377) 14.Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16."Clean-up" requires returning work area to pre -project condition or better. 17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) T H [ - C 1 T T - Q F COFFELL UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4 of 4 Contact City of Coppell Public Works Division at 972462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name Twc/ Spectrum Project Location 1 Applicant's Work Order #(1f applicable) 1413123 1441 S Beltline Rd Sub -contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL -*.-Inspected by of Utilities Maintenance Division on and found to be acceptable / not acceptable because Follow-up needed? C Yes C^ No Follow-up scheduled for ❖Inspected by of Streets Maintenance Division on and found to be acceptable I not acceptable because Follow-up needed? C Yes C No Follow -tip scheduled for A copy of this completed notice can be provided to the address below or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TK 75019 Office: 972-304-3679 Fax: 972-304-3570 Submit by E=maib Print Farm NEXTERA FIBERNET 1441 SOUTH BELTLINE RD COPPELL, TX VICINITY MAP LAKESHORE OR PROJECT SAINTSHURY ST LOGATIDN-,___" L Q z W fb DMDEN© RD tiril ► GENERAL PROJECT NOTES 1. ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE DONE IN ACCORDANCE WITH THE ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED. 2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE. UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN. NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT, THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE DRAWINGS OR NOT. 3. THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK. CALL BEFORE YOU DIG 811 IT'S THE LAW 4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO: A) PREVENT DAMAGE TO PRIVATE AND PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION. 5. BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT AND BARRICADED AT NIGHT. 6. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL. STATE AND LOCAL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL ASPECTS OF WORK RELATED TO EXCAVATION. 7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN THE STANDARD SPECIFICATIONS 5.8 "PORTLAND CEMENT CONCRETE PAVEMENT" AND 7.4.5 "QUALITY OF CONCRETE" AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - 2004. ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE. 8. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT. 9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED. 10. ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 9577. PROCTOR. THE REQUIRED DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE USED FOR BACKFILL. DFWT CONTACT: DAVID HATTON 972.670.2113 PREPARED BY: DFW TELECOM, INC. LEGEND �11G� PROPOSED CONDUIT XX' BORE xxair BORE UNDER CONCRETE LEASE DUCT r EXISTING TWC CONDUIT r r EXISTING CUSTOMER CONDUIT PP XX° PP OVERHEAD: NEW BUILD PP XX' PP 0--"6014-0 OVERHEAD: OVERLASH TYPICAL UTILITY CROSSING EXISTINGGRA13E AT CL OF -PROPOSED CONDUIT - a 24" MIN, SEPARATION EX. UTILITY CONDUIT ps NOTED IN PU N. TYf [CAL PAVEMENT BORE DETAIL TRENCH DETAIL NOT TO SCALE TRENCH GROUND. UNE WARNING TAPE BACKRU- TRENCH WITH CUSFWON SAND DEHRSS FREE MATERIAL TAMPED PLACE CONOUIT(S) TO 96R PROCTOR AS SPECIFIED PREPARED BY: v Ww LLQ` 4 DFWT CONTACT: DAVID HATTON 972.570.2113 NEXERA FIBERNET 1441 SOUTH BELTLINE RD t CONCRETE PARSING — — — — 1 — — — — — — — — — — — — — — — — — 24' FIRELANE � I I � I I � I Ir � � I I • r I � f r f f / 1 1 / I 260' PULL THROUGH 1 CUSTOMER CONDUIT 4 INTO BUILDING , 1 � ------------- --------------1------------ --------------------------- ---------------- --------------1----- w ur w 1 � d i i � • • I • ESTIMATED SHEET TOTALS DESCRIPTION QUANTITY DESCRIPTION QUANTITY TRENCH & PLACE CONDUIT PLACE FLUSH MOUNT VAULT BORE & PLACE CONDUIT PLACE PEDESTAL BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET PULL THROUGH EXISTING CONDUIT 270' PLACE POWER SUPPLY R & R CONCRETE SIDEWALK (SF) PLACE WALL BOX & RISER R & R CONCRETE PAVEMENT (5F) PLACE U -GUARD RISER AERIAL: OVERLASH I JOVERHFAD: NEW BUILD 24' FIRELANE ----------------------------------- CONCRETE --------------------------- — --CONCRETE PARKING pp NORTH PROJECT: NEXERA FIBERNET ADDRESS: 1441 �S�OUyTH BELTLINE RDs p CITY, STATE: COIjf ELL, TX. SHEET HORIZONTAL SCALE I VERTICAL SCALE I JOB NUMBER: DATE: OF 1" = 40` I',= 10' 1413123 02-07-2017 11— triumoo. 0 EXTG FLUSH MOUNT VAULT 24' x 36' - 36" CAPTURE PIPE AT BASE OF ISPOLE 0 0 CAPTURE EXISTING CONDUIT CAPTURE EXISTING CONDUIT - - 10' PULL THROUGH EXISTING TWC CONDUIT , NORTH PROJECT: NEXERA FIBERNET ADDRESS: 1441 �S�OUyTH BELTLINE RDs p CITY, STATE: COIjf ELL, TX. SHEET HORIZONTAL SCALE I VERTICAL SCALE I JOB NUMBER: DATE: OF 1" = 40` I',= 10' 1413123 02-07-2017 11— triumoo.