Loading...
Westhaven Phase 2B-LR170202TESTED FOR:DATE: 02/02/17 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 163 02/02/17 FG-2.0 10 19.3 103.2 20.3 101 97 1-A 164 02/02/17 FG-1.0 10 19.3 103.2 21.1 98 95 1-A 165 02/02/17 FG 10 19.3 103.2 20.0 101 98 1-A 166 02/02/17 FG-2.0 10 19.3 103.2 21.4 98 95 1-A 167 02/02/17 FG-1.0 10 19.3 103.2 20.8 99 96 1-A 168 02/02/17 FG 10 19.3 103.2 19.7 102 98 1-A 169 02/02/17 FG-2.0 10 19.3 103.2 20.5 100 97 1-A TEST LOCATION: 163 164 165 166 167 168 169 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. Service Crossing along Windsor Road in Front of Block F, Pad 3 Service Crossing along Windsor Road in Front of Block E, Pad 32 Service Crossing along Windsor Road in Front of Block E, Pad 32 Service Crossing along Windsor Road in Front of Block F, Pad 1 Dallas, Texas COMMENT* OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % PERCENT COMPACTION REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 Cullum Construction 162997-22 DATE Westhaven Phase 2B - Utilities Coppell, Texas TECHNICIAN: SOIL ID NUMBER COMPACTION TESTS Service Crossing along Windsor Road in Front of Block F, Pad 1 TEST NO. Service Crossing along Windsor Road in Front of Block E, Pad 32 A. Saha Service Crossing along Windsor Road in Front of Block F, Pad 1 IN PLACE DRY DENSITY PCF TESTED FOR:DATE: 02/02/17 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 170 02/02/17 FG-1.0 10 19.3 103.2 20.7 99 96 1-A 171 02/02/17 FG 10 19.3 103.2 19.8 102 99 1-A 172 02/02/17 FG-2.0 10 19.3 103.2 20.1 102 98 1-A 173 02/02/17 FG-1.0 10 19.3 103.2 21.2 98 95 1-A 174 02/02/17 FG 10 19.3 103.2 20.0 101 98 1-A 175 02/02/17 FG-2.0 10 19.3 103.2 20.5 99 96 1-A 176 02/02/17 FG-1.0 10 19.3 103.2 20.3 100 97 1-A TEST LOCATION: 170 171 172 173 174 175 176 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Cullum Construction Dallas, Texas Westhaven Phase 2B - Utilities 162997-22A Coppell, Texas TECHNICIAN: A. Saha TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Service Crossing along Windsor Road in Front of Block F, Pad 5 Service Crossing along Windsor Road in Front of Block F, Pad 5 Service Crossing along Windsor Road in Front of Block E, Pad 23 Service Crossing along Windsor Road in Front of Block E, Pad 23 IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Service Crossing along Windsor Road in Front of Block F, Pad 3 Service Crossing along Windsor Road in Front of Block F, Pad 3 Service Crossing along Windsor Road in Front of Block F, Pad 5 TESTED FOR:DATE: 02/02/17 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 177 02/02/17 FG 10 19.3 103.2 19.8 102 99 1-A 178 02/02/17 FG-3.0 10 19.3 103.2 20.3 101 97 1-A 179 02/02/17 FG-2.0 10 19.3 103.2 20.1 101 98 1-A 180 02/02/17 FG 10 19.3 103.2 19.5 103 100 1-A 181 02/02/17 FG-3.0 10 19.3 103.2 20.5 100 97 1-A 182 02/02/17 FG-2.0 10 19.3 103.2 21.0 100 97 1-A 183 02/02/17 FG 10 19.3 103.2 20.2 101 98 1-A TEST LOCATION: 177 178 179 180 181 182 183 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Cullum Construction Dallas, Texas Westhaven Phase 2B - Utilities 162997-22B Coppell, Texas TECHNICIAN: A. Saha TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Service Crossing along Windsor Road in Front of Block F, Pad 13 Service Crossing along Windsor Road in Front of Block F, Pad 15 Service Crossing along Windsor Road in Front of Block F, Pad 15 Service Crossing along Windsor Road in Front of Block F, Pad 15 IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Service Crossing along Windsor Road in Front of Block E, Pad 20 Service Crossing along Windsor Road in Front of Block F, Pad 13 Service Crossing along Windsor Road in Front of Block F, Pad 13 TESTED FOR:DATE: 02/02/17 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 184 02/02/17 FG-2.0 10 19.3 103.2 20.5 100 97 1-A 185 02/02/17 FG-1.0 10 19.3 103.2 21.0 100 96 1-A 186 02/02/17 FG 10 19.3 103.2 19.7 102 99 1-A 187 02/02/17 FG-2.0 10 19.3 103.2 21.3 98 95 1-A 188 02/02/17 FG-1.0 10 19.3 103.2 20.8 99 96 1-A 189 02/02/17 FG 10 19.3 103.2 20.1 101 98 1-A 190 02/02/17 FG-2.0 10 19.3 103.2 21.5 98 95 1-A TEST LOCATION: 184 185 186 187 188 189 190 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Cullum Construction Dallas, Texas Westhaven Phase 2B - Utilities 162997-22C Coppell, Texas TECHNICIAN: A. Saha TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Service Crossing along Winlergat Road in Front of Block F, Pad 20 Service Crossing along Winlergat Road in Front of Block F, Pad 20 Service Crossing along Winlergat Road in Front of Block F, Pad 20 Service Crossing along Winlergat Road in Front of Block F, Pad 26 IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Service Crossing along Winlergat Road in Front of Block F, Pad 16 Service Crossing along Winlergat Road in Front of Block F, Pad 16 Service Crossing along Winlergat Road in Front of Block F, Pad 16 TESTED FOR:DATE: 02/02/17 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 191 02/02/17 FG-1.0 10 19.3 103.2 19.7 100 97 1-A 192 02/02/17 FG 10 19.3 103.2 19.8 101 98 1-A 193 02/02/17 FG-2.0 10 19.3 103.2 20.0 100 96 1-A 194 02/02/17 FG-1.0 10 19.3 103.2 20.6 98 95 1-A 195 02/02/17 FG 10 19.3 103.2 19.5 102 99 1-A 196 02/02/17 FG-2.0 10 19.3 103.2 20.1 100 97 1-A 197 02/02/17 FG-1.0 10 19.3 103.2 20.3 99 96 1-A TEST LOCATION: 191 192 193 194 195 196 197 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Cullum Construction Dallas, Texas Westhaven Phase 2B - Utilities 162997-22D Coppell, Texas TECHNICIAN: A. Saha TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Service Crossing along Johns Avenue in Front of Block E, Pad 9 Service Crossing along Johns Avenue in Front of Block E, Pad 9 Service Crossing along Johns Avenue in Front of Block E, Pad 5 Service Crossing along Johns Avenue in Front of Block E, Pad 5 IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Service Crossing along Winlergat Road in Front of Block F, Pad 26 Service Crossing along Winlergat Road in Front of Block F, Pad 26 Service Crossing along Johns Avenue in Front of Block E, Pad 9 TESTED FOR:DATE: 02/02/17 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 198 02/02/17 FG 10 19.3 103.2 19.9 102 99 1-A 199 02/02/17 FG-2.0 10 19.3 103.2 20.3 101 97 1-A 200 02/02/17 FG-1.0 10 19.3 103.2 21.2 98 95 1-A 201 02/02/17 FG 10 19.3 103.2 21.5 101 98 1-A 202 02/02/17 FG-2.0 10 19.3 103.2 20.6 100 97 1-A 203 02/02/17 FG-1.0 10 19.3 103.2 20.9 99 96 1-A 204 02/02/17 FG 10 19.3 103.2 19.6 102 99 1-A TEST LOCATION: 198 199 200 201 202 203 204 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Cullum Construction Dallas, Texas Westhaven Phase 2B - Utilities 162997-22E Coppell, Texas TECHNICIAN: A. Saha TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Service Crossing along Johns Avenue in Front of Block E, Pad 2 Service Crossing along Johns Avenue in Front of Block E, Pad 13 Service Crossing along Johns Avenue in Front of Block E, Pad 13 Service Crossing along Johns Avenue in Front of Block E, Pad 13 IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Service Crossing along Johns Avenue in Front of Block E, Pad 5 Service Crossing along Johns Avenue in Front of Block E, Pad 2 Service Crossing along Johns Avenue in Front of Block E, Pad 2 TESTED FOR:DATE: 02/02/17 PROJECT:OUR REPORT NO.: TEST DATA: ELEV. DEPTH 205 02/02/17 FG-2.0 10 19.3 103.2 21.1 98 95 1-A 206 02/02/17 FG-1.0 10 19.3 103.2 20.3 100 97 1-A 207 02/02/17 FG 10 19.3 103.2 19.7 102 99 1-A 208 02/02/17 FG-2.0 10 19.3 103.2 20.6 100 96 1-A 209 02/02/17 FG-1.0 10 19.3 103.2 20.8 98 95 1-A 210 02/02/17 FG 10 19.3 103.2 19.9 101 98 1-A TEST LOCATION: 205 206 207 208 209 210 211 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Attef Abushakra, P.E. ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens. REPORT OF FIELD 2209 Wisconsin Street, Suite 100 Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No. 813 COMPACTION TESTS Cullum Construction Dallas, Texas Westhaven Phase 2B - Utilities 162997-22F Coppell, Texas TECHNICIAN: A. Saha TEST NO.DATE SOIL ID NUMBER OPTIMUM MOISTURE % MAXIMUM LAB DRY DENSITY PCF IN PLACE MOISTURE % Service Crossing along Johns Avenue in Front of Block E, Pad 16 Service Crossing along Johns Avenue in Front of Block E, Pad 16 Service Crossing along Johns Avenue in Front of Block E, Pad 16 Service Crossing along Johns Avenue in Front of Block E, Pad 16 IN PLACE DRY DENSITY PCF PERCENT COMPACTION COMMENT* Service Crossing along Johns Avenue in Front of Block E, Pad 13 Service Crossing along Johns Avenue in Front of Block E, Pad 13 Service Crossing along Johns Avenue in Front of Block E, Pad 13