Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Spectrum-PT170216
A copy of the approved permit must be on the job site at all times. CC: Applicant T H 9 c' T T -° F Page Y of 4 Public Works COPPELL Permit File Rev. 0612012 Orig. to Project File RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar duns from dater ref approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppeiltx.gov (see button below) Date of Submittal: 2-16-17 Applicant's Job # / Work Order # 1418474 PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) Defer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes CC No T [] Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work) Project Name/Location or address ©ptimas OE Solutions 1441 S Beltline Rd General Contractor GT1 Contact# 972-329-9933 E-mail address to return permit mike@gardnerl O 0. Com Representative: Kevin Causey Franchise Telephone#: 214-394-4281 Company: E-mail address: Kevin. Causey@charter. com (for contact if neededlif e-mail of approved permit is desired/permit cannot be e-mailed unless complete) Utility Company Represented: C` Oncor Electric Delivery C Atmos Energy C' Verizon C' SBC/ AT&T C: Time Warner Cable ( CoSery Electric/Gas (- Other General Description of Work fin accordance with Ord No. 2007-944): PLEASE ATTACH PLAN OF PROPOSED illl'ORK 4 spans overlash,123" of new underground. NOTE: this is another Job at this address, this job is on the far west side of bid, the other Job was on the far east side of bid. Estimated Start Date 2 - 2 3 -17 Estimated Completion Date` 3-23-17 Completion requires submittal of Completion Verification Notice (see page 4) .e Was contact made with City and/or utility companies to locate existing utilities? NO, Reason: if (i Yes C' No YIs removal of existing streets, alleys, or sidewalks necessary? (" Yes ti No if YES, project must have City inspection prior to concrete replacement Ri h -of-Wa Use Permit Annfirntinn Pa e 2 of 4 Representadve(s) of the Contractor nnust adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at appli'cant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affecttd must he restored to as good condition as before the commencement of worts (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972462-5155. YAny excavation requiring closing of a strreetlalley must be reported prior to closing to the following. Police Department (g1 972-304-3600 Fire Department @ 972-304-3512 Street Department r@ 972-452-5150 Engineering Department a 972-304-3679 Y -Attach barricade plan 1 trench safety plan if a lane or street closure is required. NOTE. Street closures are allowed from 9:00 a.m. unti13:30 p.m._ONLY unless otherwise approved by City Engineer. :-Attach Work Order (franchise only) and/or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals by e-mail should go to engineerC coppelltx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.) Kevin Cauaey 2-16-17 Signature of Utility Company Representative Date Mike Hulvey Signature of Contractor Representative Signature of City Representative Comments 2-16-17 Date 16 February 2017 Date ➢dVQpE: Notif y QV I'ns ector at 972-304-3679 prior to be innin work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever holed harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T H c c e r Y • o f Page 3 of 4 COFFELL a t UTILITY RELOCATION CHECKLIST FOR WORK WITHIN !CITY OF C _ PPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: J A copy of the valid approved City of Coppell permit is required on the project at all times. 3Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3 Proper erosion control measures must be taken. 4.Follow Texas MUTCD standards for work in traffic zones. 3Sod is to be replaced when necessary. drrigation repairs must be performed in a timely manner. 7 Follow OSHA recommended trench safety at all times. $,Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS manholes. 9,Densities may be required in trench lines (ASTM). kCare and repair of street signage is the responsibility of the contractor. I LNo work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m. 13.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following: CITY OF COPPELL UTILITIES DIVISION coppelltx.gov/utility,-operations-division 9721462-5155 CITY OF COPP'ELL ENGINEERING DEPT. 9721304-3679 HOMEOWNER ASSOCIATIONS 9721304-3678 (Planning Department) TIME WARNER CABLE FEDERAL EMERGENCY MGMT. ADMIN. 2141 320-5455 (Mike Rasmussen) 940/ 898-5138 AT&T LOCAL NETWORK TEXAS COMM. on ENVIRONMENTAL QUALITY 2141215-3031 (Rich Millenman) 8171 588-5800 COSERV Gas & Electric DENTON CO. LEVEE DISTRICT 9401321-7800 x 7624 (Greg Ward) 2141 352-5118 (Richard Hightower) EXPLORER PIPELINE Atmos Energy 918/ 493-5100 (Patrick Nwakoby) 9721360-4428 (Gary Dickinson) ONCOR Electric Delivery 972/ 323-8917 (Larry Redick) VERIZON COMMUNICATIONS 1 800 MCI TESS for line locates 9721 318-5277 (344 -8377) 14.Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16. "Clean-up" requires returning work area to pre -project condition or better. 17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) T N 9- C f T Y - 0 F COPPELL ti a t UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4 of 4 Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name TWC/spectrum Project Location / Applicant's Work Order # (if applicable) 1418474 1441 S Beltline Rd Sub -contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETE© BY CITY OF COPPELL PUBLIC WORKS PERSONNEL *'•Inspected by of Utilities Maintenance Division on and found to be acceptable / not acceptable because Follow-up needed? C Yes (- No Follow -tip scheduled for e. -Inspected by I of Streets .Maintenance Division on and found to be acceptable / not acceptable because Follow-up needed? C Yes C No Follow-up scheduled for A copy of this completed notice can be provided to the address or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd, Coppell TX 75019 Office: 972-304-3679 Fax: 472-304-3570 Submit by E-mail Print Form I %w- OPTIMAS OE SOLUTIONS 1441 S BELTLINE RD COPPELL, TX 1♦ N VICINITY ,MAP PROJECT LOCATION SAINTSBURY ST 0 tm► GENERAL PROJECT NOTES 1. ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE DONE IN ACCORDANCE WITH THE ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED. 2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE. UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT. THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE DRAWINGS OR NOT. I THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK. CALL BEFORE YOU DIG 811 IT'S THE LAW 4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO: A) PREVENT DAMAGE TO PRIVATE AND PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION. 5. BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT AND BARRICADED AT NIGHT. 6. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL ASPECTS OF WORK RELATED TO EXCAVATION. 7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN THE STANDARD SPECIFICATIONS 5.8 "PORTLAND CEMENT CONCRETE PAVEMENT" AND 7.4.5 "QUALITY OF CONCRETE" AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - 2004. ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE. 8. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT. 9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED. 10. ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 95% PROCTOR. THE REQUIRED DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT, LIFTS MAY VARY ACCORDING TO THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE USED FOR BACKFILL. DFAIT CONTACT: DAVID HATTON 972.670.21 13 PREPARED BY: DFW TELECOM, INC. LEGEND --vo— PROPOSED CONDUIT XX' ORE _� i BORE UNDER CONCRETE LEASE DUCT EXISTING TWC CONDUIT EXISTING CUSTOMER CONDUIT PP XX' PP 13- I-0 OVERHEAD: NEW BUILD PP XX' PP 0---W-"OH-0 OVERHEAD: OVERLASH TYPICAL UTILITY CROSSING EXISTING GRACE AT CL' OF PROPOSED CONDUIT p 24' MINI — SEPARATION— i EX. UTILITY —' NOTED IN P N - - — . TYPICAL PAVEMENT BORE DETAIL TRENCH DETAIL NOT TO SCALE GROUND LINE WARNING TAPE CUSHION SAND PLACE CONDUITS) AS SPECIFIED PREPARED BY: DF+.' Yr T 1LL f DFW6 CONTACT: DAVID HATTON 972.670.21 13 BACKFILL TRENCH WITH DEBRIS FREE MATERIAL TAMPED TO R93 PROCTOR • STA. 1+23 LINE 'A' PLACE U --GUARD RISER ON EXISTING POLE BEGIN AERIAL CONSTRUCTION ESTIMATED SHEET TOTALS DESCRIPTION QUANTITY DESCRIPTION QUANTITY TRENCH & PLACE CONDUIT 96, PLACE FLUSH MOUNT VAULT BORE & PLACE CONDUIT 27` PLACE PEDESTAL BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET PULL THROUGH, EXISTING CONDUIT PLACE POWER SUPPLY R & R CONCRETE SIDEWALK (SF) PLACE WALL BOX & RISER R & R CONCRETE PAVEMENT (SF) PLACE U—GUARD RISER 1 AERIAL: OVERLASH 463' OVERHEAD: NEW BUILD STA. 0+00 LINE 'A' PLACE WALL BOX 12" x 24" x 24" RISE ON BLDG. WJ GALVANIZED STEEL PIPE OPTIMAS OE SOLUTIONS 1441 SOUTH BELTLINE RD CONCRETE PARKING l • • t ------------- --- – - — — — — fit- ------ T-'� -- 24' FIRELANE ----- ----- T�sl� �i------- --—--------_---- 9 259' .w, nu tw PP 204' DH OH 01i 4H OH NORTH PROJECT: OPTIMAS OE SOLUTIONS ADDRESS: 144x1 S BELTLINE RD CITY. STATE: �COPPELL, ZX SHEET HORIZONTAL SCALE I VERTICAL SCALEJOEL 1V4UMBER: DATE: 1 OF 2 1" s 40' 1"= 10' DID -1.418474 1 02-15-2017 CV F— L.L1 Lu (i 7 Lis LL ts'} Lu Z Q Spe trun. N.> LEGEND PROPOSED CONDUIT xX' BORA BORE UNDER CONCRETE LEASE DUCT .. EXISTING TWC CONDUIT' .EXISTING CUSTOMER CONDUIT PP O XX',H-¢' OVERHEAD: NEW BUILD 0- - - OVERHEAD: OVERLASH TYPICAL UTILITY CROSSING EXISTING GRACE AT CL OF PROPOSED CONDUIT PLACE FLUSH MOUNT VAULT BORE & PLACE CONDUIT PLACE PEDESTAL 24" MIN. . .SEPARATION -EX. UTILITY f iJdTED IN P N - - TYPICAL PAVEMENT BORE DETAIL DRIVEWAY - _ - CONDUIT AS NOTED IN PUN--/ TRENCH DETAIL NOT TO SCALE TRENCH GROUND LINE_- 0 n WARNING TAPE BACKFILL TRENCH CUSHION SAND WITH DEBRIS FREE MATERIAL TAMPED PLACE CONOUIT(S) TO 98X PROCTOR AS SPECIFIED PREPARED BY: 411! w 0 DFWT CONTACT: DAVID HATTON 972.670.21 13 i— w uj 2 V) LLJ Lu V) I Lu Z OPTIMAS OE SOLUTIONS 1441 SOUTH BELTUNE RD k CONCRETE PARKING • If I • • - ----- ------------------- �--m--------------� l 24, FIRELANE 4 ---^------------ _-_-_---� _.�_- - -® - - -----------------.----- � 3 PCAPTuRE RD RISER w � "�' \ POLE "' yy TING TWC ---- —.--------a CONCRETE PARKING 201, PIP - 202' OH OH PP OH 6}1 OH OH_TT CT -a ESTIMATED SHEET TOTALS I I I z TRENCH & PLACE CONDUIT PLACE FLUSH MOUNT VAULT BORE & PLACE CONDUIT PLACE PEDESTAL BORE & PLACE STEEL CASING t PULL THROUGH EXISTING CONDUIT 10' PLACE POWER SUPPLY f PLACE WALL BOX & RISER R & R CONCRETE PAVEMENT (SF) PLACE U -GUARD RISER 1 AERIAL: OVERLASH 403` OVERHEAD: NEW BUILD � f k CONCRETE PARKING • If I • • - ----- ------------------- �--m--------------� l 24, FIRELANE 4 ---^------------ _-_-_---� _.�_- - -® - - -----------------.----- � 3 PCAPTuRE RD RISER w � "�' \ POLE "' yy TING TWC ---- —.--------a CONCRETE PARKING 201, PIP - 202' OH OH PP OH 6}1 OH OH_TT CT -a ESTIMATED SHEET TOTALS DESCRIPTION QUANTITY DESCRIPTION QUANTITY TRENCH & PLACE CONDUIT PLACE FLUSH MOUNT VAULT BORE & PLACE CONDUIT PLACE PEDESTAL BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET PULL THROUGH EXISTING CONDUIT 10' PLACE POWER SUPPLY R & R CONCRETE SIDEWALK (Sf} PLACE WALL BOX & RISER R & R CONCRETE PAVEMENT (SF) PLACE U -GUARD RISER 1 AERIAL: OVERLASH 403` OVERHEAD: NEW BUILD NORTH PROJECT; QPTIMAS OE SOLUTIONS ADDRESS: 1441 S BELTLINE RD CITY, STATE: C©PPELL, TIC SHEET HORIZONTAL SCALE VERTICAL SCALE JOB NUMBER: DATE: 2 OF21 I"= 40' 1"= 10" 1 DID -1418474 02-15-2017 EXTG FLUSH MOUNT \-10' PULL THROUGH VAULT 24" x 36' x 36' EXISTING TWC CONDUIT CAPTURE EXISTING CONDUIT spectru oo,