Park West Crossing-CS170131
MEMORANDUM
TO: Marcus Marion, Engineering
Matt Mabry, Engineering
FROM: Jeff Graham, Water Utilities
DATE: January 31, 2017
REF: Park West Phase II: Valves, FH’s, and Meters Only
1.Grade for anything in dirt.
2.Domestic water for Building E – replace meter.
3.No tracer wire on fire valve for Building E,
4.Raise valves to grade at southwest corner of Building E
5.Main line valve at southeast side for Building G needs to be straightened.
6.Existing far north MLV needs to be repaired.
7.Irrigation meter in front of Building H needs to be plumbed and checked for leaks.
8.Irrigation meter in front of Building G needs to be plumbed and checked for leaks.
9.Domestic meter for Building G needs to be plumbed straight; remove 90.
10.Fire hydrant at NE corner of Building G needs to be painted yellow.
11.Uncover concrete pad for coupler in front of Building F.
12.Extension needed on FHV in front of wall at Building E.
13.Extension needed on MLV at northeast corner of Building E.