Loading...
Park West Crossing-CS170213 MEMORANDUM TO: Matt Mabry, Engineering FROM: Avery Davis, Streets DATE: February 13, 2017 REF: Southwestern, Park West Phase II: Streets 1.Bird bath ponding 2.Building F storm drain 3.Seal 1 storm drains, building F 4.Seal 4 storm drains, building G 5.Storm drain head wall needs to be grouted 6.Seal 5 storm drains, building H 7.(all approaches on Southwestern needs to be routed and sealed) 8.Sidewalk needs to be rescheduled and cleaned 9.Storm drain in front of building G on Southwestern needs to be cleaned