Park West Crossing-CS170213
MEMORANDUM
TO: Matt Mabry, Engineering
FROM: Avery Davis, Streets
DATE: February 13, 2017
REF: Southwestern, Park West Phase II: Streets
1.Bird bath ponding
2.Building F storm drain
3.Seal 1 storm drains, building F
4.Seal 4 storm drains, building G
5.Storm drain head wall needs to be grouted
6.Seal 5 storm drains, building H
7.(all approaches on Southwestern needs to be routed and sealed)
8.Sidewalk needs to be rescheduled and cleaned
9.Storm drain in front of building G on Southwestern needs to be cleaned