Fairfield Inn & Suites-170224 (2)PROJECT DETAILS 1. Project Name Fairfield Inn and Suites 2. Location/Address 1150 Northpoint Dr. 3. MS4 City of Coppell, TX 75019 4. County Dallas 5. Operator Name (control of daily operations)Northpoint Construction 6. Type Permit Small 7. Size-Acres 2.074 Location of SWP3 Manual / Site Map On-site office 10. Primary Site Contact: (Decides revisions & corrective action)James Anderson 11. Phone Number 214-600-3828 12. Primary Email Contact janderson@northpointconst.com 13. Additional email distribution list rhidalgo@northpointconst.com, jsmith@northpointconst.com 14. Inspection Schedule Every 7 Days (No Rain Events) 15. Type Of Construction Activity Hotel Construction 16. Sediment basins or ponds?Yes 17. Offsite Areas?No 18. Adjacent Wetlands?No 19. Critical Outfalls?No INSPECTION DETAILS Date of Inspection 02/24/2017 GPS Is this a Post Rain Event Report?Yes Is the Site Accessible Yes Construction Phase Utilities Batch Plant Exist?No SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Fairfield Inn & Suites Submitted by Bryan Talley at 02/24/2017 07:53 CST Page: 1 Captured at 02/24/2017 07:52 CST gocanvas.com Submission ID: fb5e4aae7c549418-1487942779054 BMPS Inspector's Observation Regarding:SWPPP Sign Corrective Action Required No Location SE interior Additional Comments Picture 1 Inspector's Observation Regarding:Curb Inlet Protection Corrective Action Required No Location Northpoint Dr Additional Comments The curb inlet East of the exit has been protected, no silt loss observed to the inlet on the opposite side of the street. Picture 1 Inspector's Observation Regarding:Off-Site Streets Corrective Action Required No Location Northpoint Dr Additional Comments Observed minimal tracking and a light amount of sediment along the curb line, recommend cleaning all sediment from the street. Picture 1 Inspector's Observation Regarding:Rock Entrance/ Exit Corrective Action Required No Location Site wide Additional Comments The rock at the South entry is in good condition, an additional rock entry is being is scheduled to be installed at the North perimeter. Picture 1 Inspector's Observation Regarding:Perimeter Silt Fence Corrective Action Required No Location West perimeter Additional Comments New silt fencing has been installed, observed to be in good working order. Picture 1 Inspector's Observation Regarding:Grate Inlet Protection SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Fairfield Inn & Suites Submitted by Bryan Talley at 02/24/2017 07:53 CST Page: 2 Captured at 02/24/2017 07:52 CST gocanvas.com Submission ID: fb5e4aae7c549418-1487942779054 Corrective Action Required No Location SW interior Additional Comments The protection has been removed to allow for paving, the inlet is above grade, recommend reapplying the filter screen protection before pouring the street. Picture 1 Inspector's Observation Regarding:Loose Floatable Debris Corrective Action Required Yes Location West interior Additional Comments Observed a pile of floatable debris needing to be properly disposed of, recommend getting a proper dumpster or trash container on site. Picture 1 Inspector's Observation Regarding:Grate Inlet Protection Corrective Action Required No Location Site wide Additional Comments Interior grate inlet protection has been repaired, observed to be working effectively. Picture 1 INSPECTION SUMMARY Does the Site Operators Qualify for Permit Termination?No **** Did the Inspector See Evidence of Corrective Action Since the Last Report? Yes Corrective Action Completed:Repaired silt fencing, repaired interior grate inlet protection, protected curb inlet and replaced wattles **** Additional BMP Controls are Required?No **** Some BMP Controls are Inadequate as Designed and Need Improvement No **** Has Illicit Discharge of Sediment Past the Project Limits Occured?No **** BMP Controls Need Maintenance or Repairs?No **** SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Fairfield Inn & Suites Submitted by Bryan Talley at 02/24/2017 07:53 CST Page: 3 Captured at 02/24/2017 07:52 CST gocanvas.com Submission ID: fb5e4aae7c549418-1487942779054 Summary of Observed Corrective Action Required:Dispose of loose floatable debris SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Fairfield Inn & Suites Submitted by Bryan Talley at 02/24/2017 07:53 CST Page: 4 Captured at 02/24/2017 07:52 CST gocanvas.com Submission ID: fb5e4aae7c549418-1487942779054 COMPLIANCE SUMMARY No incidences of non-compliance was observed. The site is in compliance with the TXR150000 permit **** Non-compliance incidences have been noted. All non-compliance issues should be resolved within 7 days or immediately if a rain event is imminent **** Certification Statement ÒI certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief, true, accurate, and complete. I am aware there are specific penalties for submitting false information, including the possibilities of fine and imprisonment for knowing violations.Ó **** Printed Name Bryan Talley Date 02/24/2017 Inspector Phone Number 469-818-5854 Website Link http://. *** Please print this report double-sided. 1. File this report in your SWP3 Manual; keep 3 years after project completion for possible audit. 2. Log all changes to Operator responsibilities; ie areas sold to others; new Operator. 3. Update SWP3 Logs and SWP3 Site Map with current revisions. SWPPP SITE INSPECTION REPORT Terradyne Group LLC Plano, TX SWP3 Fairfield Inn & Suites Submitted by Bryan Talley at 02/24/2017 07:53 CST Page: 5 Captured at 02/24/2017 07:52 CST gocanvas.com Submission ID: fb5e4aae7c549418-1487942779054