Spectrum-PT170228 (2)A copy of the approved permit must be on the job site at all times.
CC: Applicant r H: - c, T Y O r Page 1 of 4
Public Works COPPELLPermit File Rev. 0612012
Orig. to Project File ` 4 e' h F' ° ; S
RIGHT -QF -WAY USE PERMIT APPLICATION
Permit valid for 90 calendar days-fionz dare of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: 02-23-17 applicant's Job # l Work Order # RMo 6 7 5 5 5
PERMIT FEE: $100.0+0
(No charge to Utility Companies with approved FranchiselROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes C No (1-1
E Plans provided and approved (Erosion ControllSafety fences must be installed prior to beginning work)
Project Name/Location or address 920 Redcedar Way to 915 Rollingbrook Dr
General Contractor STC Utility Contact # Melissa Gonzalez
E-mail address to return permit melissa. gonzalezgstcutility. com
Representative: Lyle Bradley
Franchise Telephone#: 214-320-5412
Company:
E-mail address: lyle . bradley@charter. com
(for contact if neededlif e-mail of approver! permit is desiredlpermit cannot be e-mailed unless complete)
Utility Company Represented:
C Oncor Electric Delivery C Atmos Energy C, Verizon C-" SBCI AT&T
(e Time Warner Cable C CoSery Electric/Gas C Other
General Description of Work (ir, accordancewith Ord. No. 2007-944): PLEASE ATTACH PLAN OF PROPOSED WORK
Replace from 26 tap to 2 way
Estimated Start Date 02 - 24 -17 Estimated Completion Date* Q3 - 24 -17
* Completion requires submittal of Completion Verification Notice (see page 4)
:Was contact made with City and/or utility companies to locate existing utilities?
NO, Reason:
if (e- Yes No
FIs removal of existing streets, alleys, or sidewalks necessary? C` Yes (&- No
if YES, project must have City inspection prior to concrete replacement
Ri bt-of-Wav Use Permit Aviolication Pa e 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approvers by the City of Coppell, which
,includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may he required at
applicant's expense) and harricading according to the Texas Manual on Uniform Traffic Control Devices.
Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155.
YAny excavation requiring closuig of a street/alley must be reported prior to closing to the following:
Police Department a 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Department Q 972-304-3679
Attach barricade platy I trench safety plan if a lane or street closure is required.
NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City
Engineer.
vAttach Work Order (franchise only) and/or 1 set of prints showing proposed work.
Locates for existing franchise utilities must be done 48 hours prior to beginning work.
For City utility locates, call 972-462-3155 to schedule 48 hours prior to beginning work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppeutx.gov.
Printing your name indicates your acceptance of the terms and conditions of this form:
( want t approyq permit ret rn d via e-mail, provide a valid e-mail address on Page 1.)
3-0
'Signa re of Utilit o any Repress tative Date
Signature of Contra&Ar Representative Date
28 February 2017
Signature of City Representative Date
Comments
:-NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to
backAl for concrete, trench, ditch and open pit inspections. Backfill must meet
all construction standards approved by the City of Coppell.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or carne against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
T H K. c i t y- o Page 3of4
COPPELL
F -
b 4
�
UTILITY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
1.A copy of the valid approved City of Coppell permit is required on the project at all times.
2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact
names and phone numbers.
3.Proper erosion control measures must be taken.
4.17ollow Texas MUTCD standards for work in traffic zones.
5.Sod is to be replaced when necessary.
6.Irrigation repairs must be performed in a timely manner.
7.Follow OSHA recommended trench safety at all times.
$.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS
manholes.
9.Densities may be required in trench lines (ASTM).
10.Care and repair of street signage is the responsibility of the contractor.
11.No work is to be done in collector roadways before 9:40 a.m. or after 3:00 p.m.
12.Prior notice of work activity on weekends and holidays must be in writing.
13.1-ine locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following:
CITY OF COPPELL UTILITIES DIVISION CQ ell x.gov/utilit,)T_Qpgrati ll -division
972/ 462-5155
CITY OF COPPELL ENGINEERING DEPT.
972/ 304-3679
HOMEOWNER ASSOCIATIONS
972/ 304-3678 (Planning Department)
TIME WARNER CABLE
214/ 320-5455 (Mike Rasmussen)
AT&T LOCAL NETWORK
2141 215-3031 (Rich Millenman)
COSERV Gas & Electric
9401321-7804 x 7624 (Greg Ward)
EXPLORER PIPELINE
918/ 493-5100 (Patrick Nwakoby)
ONCOR Electric Delivery
9721 323-8917 (Larry Redick)
VERIZON COMMUNICATIONS
9721 3 18-5277
FEDERAL EMERGENCY MGMT. ADMIN.
940/ 898-5138
TEXAS COMM. on ENVIRONMENTAL +QUALITY
8171588-5800
DENTON CO. LEVEE DISTRICT
214/ 352-5118 (Richard Hightower)
Atmos Energy
972/360-4428 (Gary Dickinson)
1 800 DIG TE SS far line locates
(344 -8377)
14.Contaminants must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clean of construction material and debris.
16. "Clean-up" requires returning work area to pre -project condition or better.
17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4)
T H [ C I T Y O F
COPPELL
1 b
UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT
COMPLETION VERIFICATION NOTICE
Page 4 of 4
Contact City of Coppell Public ,Works Division at 972-462-5155 to schedule an inspection
with Utility & Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name
Project Location / Applicant's Work Carder # (if applicable)
Sub -contractor Company Name
24 hr. Contact Number
Date of Verification Appointment
Time of Verification Appointment
INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL
-*.-Inspected by
of Utilities Maintenance Division on
and found to be acceptable / not acceptable because
Follow-up needed? C Yes C' No Follow-up scheduled for
4 -Inspected by
of Streets Maintenance Division on
and found to be acceptable / not acceptable because
Follow-up needed? C' Yes C` No Follow-up scheduled far
A copy of this completed notice can be provided to the address below
or e-mailed by using the button below:
City of Coppell Engineering Dept.
255 Parkway Blvd., Coppell TX 75019
Office: 972-304-3679 Fax: 972-304-3570
Submit by I Print Form
C A B L E
RMO-67555
920 REDICEDAR WAY
COPPELL, TX
VICINITY MAP
PROJECT 'yI
LOCATION C k
x �
y�
x
r*
GENERAL PROJECT NOTES
1, ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE DONE IN ACCORDANCE WITH THE
ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED.
2, EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE.
UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND
LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR
ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT.
THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY
DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE
DRAWINGS OR NOT.
3. THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE
MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK,
CALL BEFORE YOU DIG
811
1 V THE LAW
4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO: A) PREVENT DAMAGE TO PRIVATE AND
PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION.
5, BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND
SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES'. TRAFFIC FLOW AND ACCESS
SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE
FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT
AND BARRICADED AT NIGHT.
6. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING
EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH
ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
ASPECTS OF WORK RELATED TO EXCAVATION.
7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN
THE STANDARD SPECIFICATIONS 5.8 "PORTLAND CEMENT CONCRETE PAVEMENT" AND 7.4.5 "QUALITY OF CONCRETE"
AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION - 2004, ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE.
8. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT
CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT.
9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED.
10. ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 95x9 PROCTOR. THE REQUIRED
DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS CR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO
THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE
USED FOR BACKFILL.
DFWT CONTACT: DAVID HATTON 972.670.21 13
PREPARED BY: DFW TELECOM, INC.
LEGFND
mmm--I1G� PROPOSED CONDUrr
IIXX' BOREII
f- 71- BORE UNDER CONCRETE
II7II LEASE DUCT
- - EXISTING TWC CONDUff
r m EXISTING CUSTOMER CONDUIT
P XX.
PP
OHS OVERHEAD: NEW BUIL]
Pte+ XOH-7 OVERHEAD: OVERLASH
TYPICAL UTILITY CROSSING
TRENCH DETAIL
NOT TO SCALE
FEE
WARNING TAPE
CUSHION SAND
PLACE CONDLRT(S)
AS SPECMD
PREPARED BY:
AV.
0
DFWT CONTACT:
DAVID HATON 972.67D,211.3
BACKFILL TRENCH
WTCH DEBRIS FREE
MATERIAL TAMPED
TD 98% PROCTOR
907
908
_eV
9' 19
REDCEDAR WAY
—� (60' R.O.W.)
923
8*r
ESTIMATED SHEET TOTALS
26 SOREI
QUANTITY
1
TRENCH & PLACE CDNDUIT
185'
PLACE FLUSH MOUNT VAULT
912 m --
51'
PLACE PEDESTAL
BORE & PLACE STEEL CASING
PLACE FLUSH DROP BUCKET
m
STA. O+OO
R & R CONCRETE SIDEWALK (SIF
I
7
R & R CONCRETE PAVEMENT (SF)
PLACE U -GUARD RISER
AERIAL: OVERLASH
OVERHEAD: NEW BUILD
ENTER EXISTING
GATV PEDESTAL
�'
911
IZ
J
+ STA. 2+36
0
912
8
0
--
a
ENTER EXISTING
CATV PEDESTAL
�
916
co
C;
o
Z
f�a
I
LLJ
92o
J
•
0
924
Q
_
m
915
20*
I�~
I
I
916
_eV
9' 19
REDCEDAR WAY
—� (60' R.O.W.)
923
8*r
ESTIMATED SHEET TOTALS
DESCRIPTION
QUANTITY
DESCRIPTION OIJANTITY
TRENCH & PLACE CDNDUIT
185'
PLACE FLUSH MOUNT VAULT
BORE & PLACE CONDUIT
51'
PLACE PEDESTAL
BORE & PLACE STEEL CASING
PLACE FLUSH DROP BUCKET
PULL THROUGH EXISTING CONDUIT
PLACE POWER SUPPLY
R & R CONCRETE SIDEWALK (SIF
I
PUKE WALL BDX & RISER
R & R CONCRETE PAVEMENT (SF)
PLACE U -GUARD RISER
AERIAL: OVERLASH
OVERHEAD: NEW BUILD
NORTH
PROJECT:
ADDRESS:
CITY, STATE
SPAN REPLACEMENT
(REPLACE EXIST. CATV DUE TO DAMAGE)
920 REDCEDAR WAY
: COPPELL, TX
SHEETHORIZONTAL SCALE VERTICAL SCALE
I OF i 1"=40' 1"= 10'
JOB NUMBER: DATE:
67555 1 12-28-2016