Loading...
Spectrum-PT170228 (2)A copy of the approved permit must be on the job site at all times. CC: Applicant r H: - c, T Y O r Page 1 of 4 Public Works COPPELLPermit File Rev. 0612012 Orig. to Project File ` 4 e' h F' ° ; S RIGHT -QF -WAY USE PERMIT APPLICATION Permit valid for 90 calendar days-fionz dare of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below) Date of Submittal: 02-23-17 applicant's Job # l Work Order # RMo 6 7 5 5 5 PERMIT FEE: $100.0+0 (No charge to Utility Companies with approved FranchiselROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes C No (1-1 E Plans provided and approved (Erosion ControllSafety fences must be installed prior to beginning work) Project Name/Location or address 920 Redcedar Way to 915 Rollingbrook Dr General Contractor STC Utility Contact # Melissa Gonzalez E-mail address to return permit melissa. gonzalezgstcutility. com Representative: Lyle Bradley Franchise Telephone#: 214-320-5412 Company: E-mail address: lyle . bradley@charter. com (for contact if neededlif e-mail of approver! permit is desiredlpermit cannot be e-mailed unless complete) Utility Company Represented: C Oncor Electric Delivery C Atmos Energy C, Verizon C-" SBCI AT&T (e Time Warner Cable C CoSery Electric/Gas C Other General Description of Work (ir, accordancewith Ord. No. 2007-944): PLEASE ATTACH PLAN OF PROPOSED WORK Replace from 26 tap to 2 way Estimated Start Date 02 - 24 -17 Estimated Completion Date* Q3 - 24 -17 * Completion requires submittal of Completion Verification Notice (see page 4) :Was contact made with City and/or utility companies to locate existing utilities? NO, Reason: if (e- Yes No FIs removal of existing streets, alleys, or sidewalks necessary? C` Yes (&- No if YES, project must have City inspection prior to concrete replacement Ri bt-of-Wav Use Permit Aviolication Pa e 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approvers by the City of Coppell, which ,includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may he required at applicant's expense) and harricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155. YAny excavation requiring closuig of a street/alley must be reported prior to closing to the following: Police Department a 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department Q 972-304-3679 Attach barricade platy I trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. vAttach Work Order (franchise only) and/or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972-462-3155 to schedule 48 hours prior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppeutx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: ( want t approyq permit ret rn d via e-mail, provide a valid e-mail address on Page 1.) 3-0 'Signa re of Utilit o any Repress tative Date Signature of Contra&Ar Representative Date 28 February 2017 Signature of City Representative Date Comments :-NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to backAl for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or carne against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T H K. c i t y- o Page 3of4 COPPELL F - b 4 � UTILITY RELOCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: 1.A copy of the valid approved City of Coppell permit is required on the project at all times. 2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3.Proper erosion control measures must be taken. 4.17ollow Texas MUTCD standards for work in traffic zones. 5.Sod is to be replaced when necessary. 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA recommended trench safety at all times. $.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS manholes. 9.Densities may be required in trench lines (ASTM). 10.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:40 a.m. or after 3:00 p.m. 12.Prior notice of work activity on weekends and holidays must be in writing. 13.1-ine locates must be performed in advance by contacting - 1 800 DIG TESS and/or the following: CITY OF COPPELL UTILITIES DIVISION CQ ell x.gov/utilit,)T_Qpgrati ll -division 972/ 462-5155 CITY OF COPPELL ENGINEERING DEPT. 972/ 304-3679 HOMEOWNER ASSOCIATIONS 972/ 304-3678 (Planning Department) TIME WARNER CABLE 214/ 320-5455 (Mike Rasmussen) AT&T LOCAL NETWORK 2141 215-3031 (Rich Millenman) COSERV Gas & Electric 9401321-7804 x 7624 (Greg Ward) EXPLORER PIPELINE 918/ 493-5100 (Patrick Nwakoby) ONCOR Electric Delivery 9721 323-8917 (Larry Redick) VERIZON COMMUNICATIONS 9721 3 18-5277 FEDERAL EMERGENCY MGMT. ADMIN. 940/ 898-5138 TEXAS COMM. on ENVIRONMENTAL +QUALITY 8171588-5800 DENTON CO. LEVEE DISTRICT 214/ 352-5118 (Richard Hightower) Atmos Energy 972/360-4428 (Gary Dickinson) 1 800 DIG TE SS far line locates (344 -8377) 14.Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16. "Clean-up" requires returning work area to pre -project condition or better. 17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) T H [ C I T Y O F COPPELL 1 b UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4 of 4 Contact City of Coppell Public ,Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name Project Location / Applicant's Work Carder # (if applicable) Sub -contractor Company Name 24 hr. Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL -*.-Inspected by of Utilities Maintenance Division on and found to be acceptable / not acceptable because Follow-up needed? C Yes C' No Follow-up scheduled for 4 -Inspected by of Streets Maintenance Division on and found to be acceptable / not acceptable because Follow-up needed? C' Yes C` No Follow-up scheduled far A copy of this completed notice can be provided to the address below or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Submit by I Print Form C A B L E RMO-67555 920 REDICEDAR WAY COPPELL, TX VICINITY MAP PROJECT 'yI LOCATION C k x � y� x r* GENERAL PROJECT NOTES 1, ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT-OF-WAY SHALL BE DONE IN ACCORDANCE WITH THE ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED. 2, EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE. UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT. THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE DRAWINGS OR NOT. 3. THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK, CALL BEFORE YOU DIG 811 1 V THE LAW 4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO: A) PREVENT DAMAGE TO PRIVATE AND PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION. 5, BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES'. TRAFFIC FLOW AND ACCESS SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT AND BARRICADED AT NIGHT. 6. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL ASPECTS OF WORK RELATED TO EXCAVATION. 7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN THE STANDARD SPECIFICATIONS 5.8 "PORTLAND CEMENT CONCRETE PAVEMENT" AND 7.4.5 "QUALITY OF CONCRETE" AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - 2004, ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE. 8. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT. 9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED. 10. ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 95x9 PROCTOR. THE REQUIRED DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS CR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE USED FOR BACKFILL. DFWT CONTACT: DAVID HATTON 972.670.21 13 PREPARED BY: DFW TELECOM, INC. LEGFND mmm--I1G� PROPOSED CONDUrr IIXX' BOREII f- 71- BORE UNDER CONCRETE II7II LEASE DUCT - - EXISTING TWC CONDUff r m EXISTING CUSTOMER CONDUIT P XX. PP OHS OVERHEAD: NEW BUIL] Pte+ XOH-7 OVERHEAD: OVERLASH TYPICAL UTILITY CROSSING TRENCH DETAIL NOT TO SCALE FEE WARNING TAPE CUSHION SAND PLACE CONDLRT(S) AS SPECMD PREPARED BY: AV. 0 DFWT CONTACT: DAVID HATON 972.67D,211.3 BACKFILL TRENCH WTCH DEBRIS FREE MATERIAL TAMPED TD 98% PROCTOR 907 908 _eV 9' 19 REDCEDAR WAY —� (60' R.O.W.) 923 8*r ESTIMATED SHEET TOTALS 26 SOREI QUANTITY 1 TRENCH & PLACE CDNDUIT 185' PLACE FLUSH MOUNT VAULT 912 m -- 51' PLACE PEDESTAL BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET m STA. O+OO R & R CONCRETE SIDEWALK (SIF I 7 R & R CONCRETE PAVEMENT (SF) PLACE U -GUARD RISER AERIAL: OVERLASH OVERHEAD: NEW BUILD ENTER EXISTING GATV PEDESTAL �' 911 IZ J + STA. 2+36 0 912 8 0 -- a ENTER EXISTING CATV PEDESTAL � 916 co C; o Z f�a I LLJ 92o J • 0 924 Q _ m 915 20* I�~ I I 916 _eV 9' 19 REDCEDAR WAY —� (60' R.O.W.) 923 8*r ESTIMATED SHEET TOTALS DESCRIPTION QUANTITY DESCRIPTION OIJANTITY TRENCH & PLACE CDNDUIT 185' PLACE FLUSH MOUNT VAULT BORE & PLACE CONDUIT 51' PLACE PEDESTAL BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET PULL THROUGH EXISTING CONDUIT PLACE POWER SUPPLY R & R CONCRETE SIDEWALK (SIF I PUKE WALL BDX & RISER R & R CONCRETE PAVEMENT (SF) PLACE U -GUARD RISER AERIAL: OVERLASH OVERHEAD: NEW BUILD NORTH PROJECT: ADDRESS: CITY, STATE SPAN REPLACEMENT (REPLACE EXIST. CATV DUE TO DAMAGE) 920 REDCEDAR WAY : COPPELL, TX SHEETHORIZONTAL SCALE VERTICAL SCALE I OF i 1"=40' 1"= 10' JOB NUMBER: DATE: 67555 1 12-28-2016