Loading...
Spectrum-PT170228 (4)A copy of the approved permit trust be on the job site at all times. CC: Applicant r K 9 c l r r • v F Page 1 of 4 Public Works COPPELL Permit File Rev. 0612012 Orig. to Project File RIGHT-OF-WAY USE PERMIT APPLICATION Permit validfor 90 calendar days from dale of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below) Date of Submittal: 02-23-17 Applicant's Job # 1 Work Order # RMO 611284 PERMIT FEE: $100.00 (No charge to Utility Carnpanies with approved FranchiseIROW Use Agreement) Refer to the City of Coppell Ordinance No. 2401-944. Certificated Telecom Provider? Yes CY No C: ❑ Plans provided and approved (Erosion Controll5afetyfences must be installed prior to beginning work) Project Name/Location or address 427, 431, 739 Cambria Dr General Contractor STC Utility Contact# Melissa Gonzalez E-mail address to return permitmelissa. gonzalez^astcutility. cam C6 -\CA_ LP%Z►_(!��A1 Representative: Lyle Bradley Franchise Telephone #: 214-320-5412 Company: E-mail address: lyle . bradleyocharter. com (forcontoct if neededlif e-mail of approved permit is desired/permit cannot be e-mailed unless complete) Utility Company Represented: C' Oncor Electric Delivery C, Atmos Energy C Verizon C, SBC/ AT&T C+ Time Warner Cable C CoSery Electric/Gas C Other General Description of Work (in accordance with Ord. No. 2001-944): PLEASE ATTACH PLAN OF PROPOSED WORK Replace from 11 tap to LE.500 Cable Estimated Start Date a 2 - 24 -17 Estimated Completion Date* 03-24-17 * Completion requires submittal of Completion Verification Notice (see page 4) Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason:(*— Yes C, No y -Is removal of existing streets, alleys, or sidewalks necessary? C' Yes (e No if YES, project must have City inspection prior to concrete replacement Rieht-of-Wav Use Permit Aunlication Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to. Erosion Control Ordinance, compaction requirements (density tests may he required at applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Areas] affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155. yAny excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department a 972-304-3600 Fire Department @ 972-304-3512 Street Department Q 972-462-5150 Engineering Department Q 972-344-3679 ➢Attach barricade plan 1 trench safety plan if a lane or street closure is required. !VOTE: Street closures are allowed from 9.00 a.m, until3:30„p.m. ONLY unless otherwise approved by City Engineer. YAttach work Order (franchise only) and/or 1 set of prints showing proposed work. Locates for, existing franchise utilities trust be done 48 hours prior to beginning work. For City utility locates, call 972-482-5155 to schedule 48 hours prior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals by e-mail should go to engineerocoppelltx.gov. Printiri your name indicates your acceptance of the terms and conditions of this form: (if y ant th approv d rmit retur d via e-mail, provide a valid e-mail address on Pagel.) 3-17 & iia a orf-Utiiity - odit)anv R—emesentdtive Date of Contractor RrnrCsentative --- Scet�Latlzo Signature of City Representative Comments Date Date 28 February 2017 NOTE: Notify City Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. T w K c f T Y C F Page 3 of 4 COPPELL UTILITY RELOCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: LA copy of the valid approved City of Coppell permit is required on the project at all times. !Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3.Proper erosion control measures must be taken. 4.Follow 'Texas MUTCD standards for work in traffic zones. 5.Sod is to be replaced when necessary. 6.Irrigation repairs must be performed in a timely manner. 7.Follow OSHA recommended trench safety at all times. t3.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS manholes. 9.Densities may be required in trench lines (ASTM). 10.Care and repair of street signage is the responsibility of the contractor. 11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m, 12.Prior notice of work activity on weekends and holidays must be in writing. 13.Line locates must be performed in advance by contacting - 1800 DIG TESS and/or the fallowing: CITY OF COPPELL UTILITIES DIVISION eoppelltx.leov/utility-operations-divisic�c� 9721462-5155 CITY OF COPPELL ENGINEERING DEPT. 9721 304-3679 HOMEOWNER ASSOCIATIONS 9721 304--3678 (Planning Department) TIME WARNER CABLE 2141 320-5455 (Mike Rasmussen) AT&T LOCAL NETWORK 2141215-3031 (Rich Millenman) COSERV Gas & Electric 9401 321-7800 x 7624 (Greg Ward) EXPLORER PIPELINE 9181493-5100 (Patrick Nwakoby) ONCOR Electric Delivery 972/ 323-8917 (Larry Redick) VERIZON COMMUNICATIONS 9721 3 18-5277 FEDERAL EMERGENCY MGMT. ADMIN. 9401 898-5138 TEXAS COMM. on ENVIRONMENTAL QUALITY 8171588-5800 DENTON CO. LEVEE DISTRICT 2141 352-5118 (Richard Hightower) Atmos Energy 9721360-4428 (Gary Dickinson) 1 800 DIG TESS for line locates (344 -8377) 14.Contaminants must be removed from work area daily and disposed of properly outside the City, 15.Streets, sidewalks and alleys must be kept clean of construction material and debris, 16. "Clean-up" requires returning work area to pre -project condition or better. 17. Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) T M 9 C I T T - 0 F COPPELL A 6 1 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4of4 Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name Project Location 1 Applicant's Work Order # (if applicable) Sub -contractor Company Name 24 hr.Contact Number Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORDS PERSONNF,I1 4 -Inspected �y+ of Utilities Maintenance Division on and found to be acceptable J not acceptable because Follow-up needed? (-Yes C No Follow-up scheduled for ❖Inspected by of Streets Maintenance Division on and found to be acceptable I not acceptable because Follow-up needed? r Yes C No Follow-up scheduled for A copy of this completed notice can be provided to the address below or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570 Submit by E-mail Print Form RMO-68284 427 CAMBRIA DR COPPELL, TX VICINITY MAP C A B L E GENERAL PROJECT NOTES 1. ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT—OF—WAY SHALL BE DONE IN ACCORDANCE WITH THE ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED. 2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE. UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT. THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE DRAWINGS OR NOT. 3. THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK. CALL_ BEFORE YOU DIG 811 IT'S THE LAW 4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO: A) PREVENT DAMAGE TO PRIVATE AND PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION. 5. BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT AND BARRICADED AT NIGHT. 6. THE CONSTRUCTION CONTRACTOR SHALL ASIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL ASPECTS OF WORK RELATED TO EXCAVATION. 7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN THE STANDARD SPECIFICATIONS 5.B "PORTLAND CEMENT CONCRETE PAVEMENT" AND 7.4.5 "QUALITY OF CONCRETE" AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION — 2004. ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE. 8. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT. 9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED. 10. ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 95% PROCTOR. THE REQUIRED DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE USED FOR BACKFILL. DFWT CONTACT: DAVID HATTON 972.670.2113 PREPARED BY: DFW TELECOM, INC. LEGET413 ------ UHi- PROPOSED CONDUIT xII %� BORE UNDER CONCRETE LEASE DUCT - EXISTING TWO CONDUIT EXISTING CUSTOMER CONDUIT PP XK• PP gk�Hy7 OVERHEAD: NEW BUILD FP XXI PP ��OHy7 OVERHEAD: OVERLASH TYPICAL UTILITY CROSSING TRENCH DETAIL NOT TO SCALE Mu i ev WARNING TAPE CUSHION SMO PLACE CONDUITS) AS SPEC€FTEO PREPARED By: D 0 DFW'T CONTACT: DAVID HATTON 972.67021 13 aACKFILL TRENCH' W(rH DEBRIS FREE MATERIAL TAMPED TO 989 PROCTOR )5 115.1 PROJECT: %ref SPAN REPLACEMENT (REPLACE EXIST. CATV DUE TO DAMAGE) 427 CAMBRIA DR : COPPELL, TX S4EET HORIZONTAL SCALE I VERTICAL SCALE I JOB NUMBER: DATE: 1 OF i 1'° = 40' 1" = 10' 68284 1 12-20-2016 "lk�Vilsom K, ;11