Loading...
Freeport NIP(1)-LR 841011 SOIL AND FOUNDATION ENGINEERING / CONSTRUCTION MA TERIALS TESTING HOUSTON: 2055 Silber Rd., Su/te 1008 (77055) Phone: 713/956-2130 _~- DALLAS: 8585 N. Stemrnons Fwy. South Tower, Suite 770 (75247) Phone: 214/631-4990 FIELD SOIL MOISTURE - DENSITY TEST REPORT TO Secure Resources, Inc. DATE 10-11-84 P.O. Box 45309 Dallas, Texas 75235 cc: Ginn Inc., - Paul Lusk Attention: Mr. Ed Alexander PROJECT Coppell REPORT NO. 84-631C-1 Freeport North Industrial Site FIELD TEST DATA % OF [] SUBGRADE DRY DENSITY MOISTURE MAXIMUM TEST ~ FILL LOCATION LBS./CU. FT. NO. LIFT NO. __ DENSITY Red Sandy Clay Sta: 27 + 50 1 Lift 2 Backfill of 72" Storm Sewer 100.9 21.2 104.0 Red Sandy Clay Sta: 22 + 50 2 Lift 2 Backfill of 72" Storm Sewer 99 21.5 102.0 Sta.' 17 + 50 3 Lift 1 Sand Bed Backfill of 72" Storm Sewer 108.2 7.3 N/A Sta. 12 + 50 4 Lift 1 Sand Bed Backfill of 72" Storm Sewer 103 5.6 N/A FIELD TEST METHOD: [] VOLUMETRIC ASTM D-2167-77 ]~ NUCLEAR ASTM, D-2922-81 [] SAND CONE ASTM, D.155C~74 TYPE OFMATERIAL Red to tan sandy clay & sand MAXIMUM DRY DENSITY 96.5 PCF OPTIMUM MOISTURE 24 PERCENT METHOD OF TEST: [D~STANDARD ASTM, D-698 [] MODIFIED ASTM, D-1557 90% to 95% PERCENT COMPACTION REQUIRED PERCENT "NOTE: TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS EXCEPT THOSE MARKED* INSPECTOR: Jim Vermillion TIME: 3 Hrs