Prologis Park-DR170221
DAILY CONSTRUCTION REPORT
DATE ____02/21/2017_________ REPORT #________________
PROJECT Prologis Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Sunny
OWNER CITY of COPPELL
TEMP 57
WIND NNW 13
CONTRACTOR Mycon
HUMIDITY 58
PROJECT INSPECTOR Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
Mycon
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Mycon is pumping water off of the site
Potter is digging for panel piers
Potter is setting forms and steel for the wall panels
Mycon is still hanging steel on the building pad
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.