Prologis Park-DR170224
DAILY CONSTRUCTION REPORT
DATE __02/24/2017___________ REPORT #________________
PROJECT: Prologis Building 3
DAY
M T W T F S S
PROJECT NO.
WEATHER Sunny
OWNER Prologis
TEMP 59
WIND NW 15 MPH
CONTRACTOR: Mycon
40
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Mycon is still hanging steel on the building pad
Potter is still working on the installing steel and forming of wall panels
Potter is prepping for the next pour
I was informed that Cal made the repair to the broken water line
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.
DAILY CONSTRUCTION REPORT
REPORT #_____________
Page _____ of _____ pages.