Old Town Phase 4-CR170303
Halie Hernandez
From:Matthew Mabry
Sent:Monday, March 06, 2017 7:46 AM
To:Halie Hernandez
Subject:Main street phase IV daily report
PROJECT Main street phase IV
PROJECT NO.
OWNER CITY of COPPELL
CONTRACTOR Pavecon
PROJECT INSPECTOR Matthew Mabry
DAILY CONSTRUCTION REPORT
DATE 3-3-2017 REPORT #1
DAY M T W T F S S
Weather:
Temp:
Humidity:
Wind:
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
1
CONSTRUCTION ACTIVITIES:
Spoke to contractor about a issue with the sewer line and boring into the manhole. He wanted to make sure it was not possible to open cut the
manhole. I told him that it was discussed in the precon that the developer did not want this to happen because of the residents that need use of
that ally.