Loading...
Old Town Phase 4-CR170303 Halie Hernandez From:Matthew Mabry Sent:Monday, March 06, 2017 7:46 AM To:Halie Hernandez Subject:Main street phase IV daily report PROJECT Main street phase IV PROJECT NO. OWNER CITY of COPPELL CONTRACTOR Pavecon PROJECT INSPECTOR Matthew Mabry DAILY CONSTRUCTION REPORT DATE 3-3-2017 REPORT #1 DAY M T W T F S S Weather: Temp: Humidity: Wind: AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: 1 CONSTRUCTION ACTIVITIES: Spoke to contractor about a issue with the sewer line and boring into the manhole. He wanted to make sure it was not possible to open cut the manhole. I told him that it was discussed in the precon that the developer did not want this to happen because of the residents that need use of that ally. SIGNATURE PUBLIC WORKS INSPECTOR: MATTHEW MABRY Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov 2