Loading...
Park West Crossing-CS170221 (2) MEMORANDUM TO: Matt Mabry, Marcus Marion, Engineering FROM: Roy Cardoza, Streets DATE: February 21, 2017 REF: Southwestern, Park West Phase II 1.Route and seal all cracks marked with paint 2.Remove and replace broken sidewalk panel marked with paint 3.Re-grout chipped curbs 4.Seal all joints along with curbs to a flush 5.Reseal all storm drains to a flush 6.All approaches on Southwestern need to be routed and sealed 7.Follow up walk through is necessary