PROJECT Westhaven Phase II-B
PROJECT NO.
OWNER CITY of COPPELL
CONTRACTOR Gilco
PROJECT INSPECTOR Matthew Mabry
DAILY CONSTRUCTION REPORT
DATE 2-27-2017 REPORT #1
DAY M T W T F S S
Weather:
Temp:
Humidity:
Wind:
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
1
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
Got all the health samples back from the water line and it passed. Met the contractor on site and turned on the 3 valves going into the property.
No work (rain)
SIGNATURE
PUBLIC WORKS INSPECTOR: MATTHEW MABRY
Matthew Mabry
Engineering Construction Inspector
City of Coppell, TX