Loading...
Park West Crossing-CS170308T H E C 1 T Y O F COFFELL ov Tim Geisler March 8, 2017 ML Realty Partners RE: Conditional Final Acceptance Letter Park West Crossing Dear Mr. Geisler: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds have been received. This final acceptance is contingent on the Letter Of Map Revision being approved by FEMA. Maturity on the bonds will be two years from the date of this letter. You may notify MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the S WPPP permit. A follow up inspection of the facilities will be conducted prior to the lapse of the two- year bond period. If any punch list items are noted at that time, you will be contacted to make repairs. Sincerely, Matthew Mabry Construction Inspector Office Phone: (214) 406-5223 cc: Ken Griffin, P.E., Director of Engineering and Public Works Kent Collins, P.E., Assistant Director of Engineering Michael Garza, P.E., Assistant Director of Public Works Suzanne Arnold, Chief Building Official Tim Oates, Deputy Fire Chief Jennifer Miller, Finance Director A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV