Loading...
Spectrum-PT170315A copy of the approved permit must be on the job site at all times. CC: Applicant T„_ r r =r o f Page 1 of 4 Public Works COFFELL Permit File Rev. (�6/2(l} {frig. to Project File a r RIGHT-OF-WAY USE PERMIT APPLICATION Permil valid for 90 calendar days from dale of approval Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below) Date of Submittal: 3-8-17 Applicant's .fob #! / Work Order # 1.121792 PERMIT FEE: $100,00 (No charge to Utility Companies with approved FranchiseIROW Use Agreement) Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes G` No C n Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work) Project Name/Location or address Esm services 747 S Macart:hur Blvd General Contractor GTI E-mail address to return permit mike@gardner100 . com Contact# 972-329-9933 Representative: Kevin Causey Franchise Telephone#: 2.14-394-4281 Company: E-mail address: Kevin. Causey@charger. . com (for contact if neededl'if e-mail of approved permit is desired/permit cannot be e-mailedunless complete) Utility Company Represented: C Oncor Electric Delivery C Atmos Energy C Verizon C SBC/ AT&T Time Warner Cable (' CoSery Electric/Gas C Other General Description of Work fin accordance with Ord. No. 2041-944): PLEASE ATTACH PLAN OF PROPOSED WORK 389' of new underground for new Spectrum/ TW service Estimated Start Date 3 -14 -17 Estimated Completion Date* 4 -14 -17 * Completion requires submittal of Completion Verification Notice (see page 4) ,-Was contact made with Cite and/or utility companies to locate existing utilities? if NO, Reason: (e- Yes C' No :-Is removal of existing streets, alleys, or sidewalks necessary? C' Yes (,-P No if YES, project must have City inspection prior to concrete replacement Ri ht-of-Wa • Use Permit Anntication Pa e 2 of 4 Representative(s) of the Contractor !oust adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices. Areas) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 932-462-5155. ➢Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department @ 972-304-3600 Fire Department @ 972-304-3512 Street Department @ 972-462-5150 Engineering Department @ 972-304-3679 YAttach barricade plan / french safety plan if a lane or street closure is required. NOTE. : Street closures are allowed from 9:00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City Engineer. i -Attach Work Order (franchise only) and/or 1 set of prints showing proposed work. Locates for existing franchise utilities must be done 48 hours prior to beginning work. For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work. The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept. for approval prior to beginning work. Submittals bye -mail should go to engineer@cappelltx. ov. Printing your name indicates your acceptance of the terms and conditions of this form: (if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.) Kevin Causey 3-8-1.7 Signature of Utility Company Representative Date Mile Mulvey Signature of Contractor Representative 3-8-17 Date 15 March 2017 Signature of City Representative Date Comments );>NOTE: NAfy UU Inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under per►nit from the City, if such permit is granted. T w`• c I T Y- o F Page 3 of 4 COPPELL It l A s UTILITY RELOCATION CHECKLIST FOR WORK. WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: LA copy of the valid approved City of Coppell permit is required on the project at all times. 2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3,Proper erosion control measures must be taken. IFollow Texas MUTCD standards for work in traffic zones. 5.5od is to be replaced when necessary. 8irrigation repairs must be performed in a timely manner. 7.Follow OSHA recommended trench safety at all times. 8.R.epair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS manholes. 9.Densities may be required in trench lines (ASTM). J.Care and repair of street signage is the responsibility of the contractor. J,No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m. 12.Prior notice of work activity on weekends and holidays must be in writing. Ii Line locates must be performed in advance by contacting - 1 800 DIG TESS ,and/or the followings CITY OF COPPELL UTILITIES DIVISION coppelltx.gov/utili -operations-division 972/ 462-5155 CITY OF COPPELL ENGINEERING DEPT. 9721304-3679 HOMEOWNER ASSOCIATIONS 9721304-3678 (Planning Department) TIME WARNER CABLE FEDERAL EMERGENCY MGMT. ADMIN. 2141320-5455 (Mike Rasmussen) 940/ 898-5138 AT&T LOCAL NETWORK TEXAS COMM. on ENVIRONMENTAL QUALITY 2141215-3031 (Rich Mi:llenman) 817/ 588-5800 COSERV Gas & Electric DENTON CO. LEVEE DISTRICT 940/ 321-7800 x 7624 (Greg Ward) 214/ 352-5118 (Richard Hightower) EXPLORER PIPELINE Atmos Energy 9181493-5100 (Patrick Nwakoby) 972/360-4428 (Gary Dickinson) ONCOR Electric Delivery 9721323-8917 (Larry Redick) VERIZON COMMUNICATIONS 1 800 DIG TESS for line locates 972/318-5277 (344 -8377) 14. Contaminants must be removed from work area daily and disposed of properly outside the City. 15.Streets, sidewalks and alleys must be kept clean of construction material and debris. 16. "Clean-up" requires returning work area to pre -project condition or better. 17. Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) T H t- C I T V - G E° COFFELL 8 UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT COMPLETION VERIFICATION NOTICE Page 4 of 4 Contact City of Coppell Public 'Works Division at 972-462-51.55 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppell specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name TWC/Spectrum Project Location 1 Applicant's Work Order # (iif applicable) 1426792 747 S Macarthur Blvd Sub -contractor Company Name Ventura 24 hr.Contact Number 214-991-5948 Date of Verification Appointment Time of Verification Appointment INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL •:+Inspected by of Utilities Maintenance Division on and found to be acceptable 1 not acceptable because Follow-up needed? C Yes (- No Follow-up scheduled for ❖.inspected by of Streets Maintenance Division on and found to be acceptable I not acceptable because Follow -rip needed? C Yes (- No Follow -rip scheduled for A copy of this completed notice can be provided to the address below or e-mailed by using the button below: City of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75819 Office: 972-304-3679 Fax: 972-304-3578 Submit by E -ma I Print Form