Loading...
Prologis Park 121 Northwest Dr--DR170307 DAILY CONSTRUCTION REPORT DATE ___03/07/2017__03:10pm_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Mostly Cloudy OWNER CITY of COPPELL TEMP 63 CONTRACTOR: CORE WIND NNE 13 HUMIDITY 79 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: The contractor is working on pre-presuring the water line for the hydrostatic test on Wednesday The water line is connected and both valves are opened back up. I informed Mycon that the storm drain belonged to TxDOT. SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.