Prologis Park 121 Northwest Dr--DR170308 DAILY CONSTRUCTION REPORT DATE ___03/08/2017__02:50pm_ REPORT #________________ PROJECT: Northwest Dr. DAY M T W T F S S PROJECT NO. WEATHER Partly Cloudy OWNER CITY of COPPELL TEMP 62 CONTRACTOR: CORE WIND SSE 9 HUMIDITY 38 PROJECT INSPECTOR: Marcus Marion AVERAGE FIELD FORCE NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS VISITORS TIME REPRESENTATIVE REPRESENTING REMARKS EQUIPMENT AT THE SITE: CONSTRUCTION ACTIVITIES: CalHar performed a hydrostatic test and passed CalHar released the pressure and started flushing the water line with chlorine for the BT test I informed the contractor that the stamped area needed to be on the private side of the approach SIGNATURE PUBLIC WORKS INSPECTOR Page _____ of _____ pages. DAILY CONSTRUCTION REPORT REPORT #_____________ Page _____ of _____ pages.