Prologis Park 121 Northwest Dr--DR170309
DAILY CONSTRUCTION REPORT
DATE ___03/09/2017__02:50pm_ REPORT #________________
PROJECT: Northwest Dr.
DAY
M T W T F S S
PROJECT NO.
WEATHER Mostly
Cloudy
OWNER CITY of COPPELL
TEMP 63
CONTRACTOR: CORE
WIND NNE 9
79
HUMIDITY
PROJECT INSPECTOR: Marcus Marion
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
CONSTRUCTION ACTIVITIES:
The Bac-T test was not performed today
I received all of the information from CalHar bout the sewer line that
I emailed the GC the standards for the approach and the expectation for the stamped area.
SIGNATURE
PUBLIC WORKS INSPECTOR
Page _____ of _____ pages.