Loading...
Copperstone-CS 951114The City With A Beautiful Future P.O, Box 478 Coppell, Texas 75019 P.O. Box 478 Coppell, Texas 75019 214-462-0022 November 14, 1995 Jim Briscoe Briscoe Clark Company 8300 Douglas Ave., Suite 800 Dallas, Texas 75225 RE: Copperstone Development Fee Assessment Dear Mr. Briscoe: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Copperstone. Please make payment to the City of Coppell in the amount of $145,719.95 and forward it to Jennifer Armstrong, Interim Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/City Engineer cc: Jennifer Armstrong, Interim Finance Director Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Greg Jones, Chief Building Official Per Birdsall, Interim Street Superintendent Rick Wieland, Parks Development Coordinator CITY OF COPPELL DEVELOPMENT FEES Date: Project: November 14, 1995 Copperstone TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $64,800.00 $64,800.00 (100% due prior to Council Approval) Water Tap Inspection Fee $13,200.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee $58,050.00 $58,050.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $12,900.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $6,450.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $2,870.25 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) $3,870.00 ~0- (100% due at Issuance of Water Meters) Water Meter Fee (Irrigation & Fire) $387.15 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit $105.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee $22,869.95 $22,869.95 Street Escrow -0- -0- (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $185,502.35 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $145,719.95 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. 11×08x95 14:48 001 September 11, 1~$ Mike Martin, E.I.T. fioward Pafford/ Utilities Superintendent Development Fees for Cop~erstone mstates ThirdRevision The ~ollowing fees referenced project. should be assessed and collected on the above Water Impact Fee: ~ - _~/8" X 314" Domestic Meter/s Irrigation Meter/s Fireline Neter/s = ESU's BSU's ~ $450.00 ea 100% due prior to Council approval of the final plat. Wastewater Impact _~ - _ 5/~" X $/4" Domestic Meter/s = Total 1Z~ ESU's ~ $450.00 ea = 129_ ESU's $58/050.00 100% due prior to council approval of the final plat. Water Tap Inspection Fee _lJ~_Co~ne¢=ion~ @ $100.00 each = ~ 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewe~ Tap inspection Fee ~ connections ~ $1oo.oo each 100% ~ue prior to issuance of buil~ingpermit. (Residential only) 11/08/95 14:49 Pa~e 2 100% due prior to t~suance of buildtngpermlt. Water Meter Fee (Domes~io) 12~ - ,,,, $/8~' X $/4,~ Domestic Meters ~ ~ ' ~ 100% due prior Co issuance of building ~rmit for residential only. Ail other.development fees are due prior to issuance of metem/s. Water Heter Fee (Irrt~atton/Fireline) ~ - ~ Irrigation Meter/s $ ..$12~.o5,ea = $387.15 - , .... Fireline Meter/~ ~ $ e~ ~ Total i00% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or ~on-Residenti~l) ~ Meters ~ $$$.00 ea =, $3.870.00_ lOOt due prior to issuance of water meter~. Irrigation Meter Deposit _.~__ Meters ~ ,,$35.00,~a = ,$105.00 100% due prior to issuance of water meters. Park Fee For those developments having prellminaryplat approval pr/or to June 23, 19~2 the following assessment is determined; Residential Lots at $150.00 each - $ Units (Multi family) at $75.00 each - $ 50% of the a~ount s~eci£1ed above shall be paid by the Developer! prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Page For those developments having preliminary plat approval after Juno 25, 1992 the following assessment is determined: Residential Lots at $$50.00 each Units (Multi-Family) at $$$0.00 each 50% of the amount speai£ied above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall bo pal~ by the Builder at such time as a.building permit is issued. For those developments having preliminary plat approval after October 26, 19~3 the following assessment ~s de,ermined: Residential Lots at $1,285.00 each ... units (Multi-Family) at $1,2a5.00 each 100% of the amount specifie~ above shall be paid by the Developer prior to Council approval of final pla~. Please advise the Developer of these fees and due dateB. If yOU have any question$ regarding these assessments please advi~e. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. No~e: This fee cannot be assessed until after TU Electric ~ubmits the ~lghting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee see aCtached Street Sign Assessment sheet. lUU% ~ue prior to final acceptance of project. 11/08/95 14:49 D~velops~nt Z'ee~ P~ge 4 for The following assessment is being made in accordance with the city of Coppell Subdivision Ordinance Appendix A. Chapter VIII A. The following cost of those s~gn materials reguzred are based on current pricing whluh is reviewed on a regular basis. No Parking speed ~imit Yield stop Street Name Stop ~ Street Cora~o __~ EXTENDED PRICE COSt breakdown~ may be reguest. TOTAL obtained from Public Works by written DEVFEES.HLP Revised 5/26/95 COPPERSTONE ESTATES PARK FEE CALCULATIONS Areas Block A, B, C (north of Parkway Blvd.) Block D, E, F (south of Parkway Blvd.) Coppell Streets & Alleys Square Feet 1,254,340 + 727,647 1,981,987 - 428,408 1,553,579 Block F, Lot 8 Common Area + 438,849 1,992,428 Private (not conveyed to City) As per Univest Agreement at $500 per acre 1,992,428. x $500.00 $ 22,869.95 * Areas calculated by Dowdey, Anderson & Associates COPPERSTONE Coppell, Texas AREA SUMMARY Lot 46, Block A Coppell Dedication Block A, B, C (north of Parkway Blvd.) Parkway Boulevard Block D, E, Fo (south of Parkway Blvd.) Lot 8, Block F Common Area 99,216 s.f. (2.278) ac. 1,254,340 s.f. (28.796) ac. 209,450 s.f. (4.808) ac. 727,647 s.f. (16.705) ac. 438,849 s.f. (10.075 ac) ? 0 Box 4'g Copptll. Texa.s '.5019 The C~ With A Be,utif~i Future Fax No. ~214) 304-3673 FAX COVER SHEET PLEASE DELIVER THE FOLLOWING PAGES TO: TRANSMITTED BY: DATE: \ ~ / \(~ TIME: NUMBER OF PAGES (INCLUDING COVER Star. wi'): q IF YOU DO NOT RECEIVE ALL OF THE PAGES. PLEASE CALL BACK AS SOON AS POSSIBI.~= PLEASE DIAL DIRECT TO THE PERSON SENDING THIS FAX BY DIALING THE DIRECT DIAL NUMBER LISTED. THANK YOU.