Loading...
Old Town Phase 4-CS170317 Halie Hernandez From:Matthew Mabry Sent:Friday, March 17, 2017 2:38 PM To:Halie Hernandez Subject:Main street phase IV FW: Possible Damaged Sidewalk Categories:This message has been archived by Retain on March 17 2017 17:28 Matthew Mabry Engineering Construction Inspector City of Coppell, TX 214-406-5223 (cell) www.coppelltx.gov From: Matthew Mabry Sent: Friday, March 17, 2017 12:08 PM To: Mike Beattie <michaelb@pavecon.com> Cc: Derrick Thomas <DThomas@coppelltx.gov> Subject: Fwd: Possible Damaged Sidewalk Please see attached email. Sent from my iPhone Begin forwarded message: From: "Derrick Thomas" <DThomas@coppelltx.gov> To: "Matthew Mabry" <MMabry@coppelltx.gov> Subject:Fwd: Possible Damaged Sidewalk Matt, Can you tell Pavecon not to drive over the new sidewalk on Travis with their loaded dump trucks. Thanks Sent from my iPhone Begin forwarded message: From: "Shane Huffman" <shuffman_rkm@yahoo.com> To: "Derrick Thomas" <DThomas@coppelltx.gov> Subject:Possible Damaged Sidewalk 1 Derrick Attached are some pictures of a dump truck driving over our new sidewalk while loaded with dirt. The truck is being loaded at the northwest corner of Travis and West Main. 2 3 4 5 This last pic is where the dirt is being loaded from 6 Regards, Shane Huffman 214-236-5658 7