Matthew Mabry
Engineering Construction Inspector
City of Coppell, TX
214-406-5223 (cell)
www.coppelltx.gov
From: Matthew Mabry
Sent: Friday, March 17, 2017 12:08 PM
To: Mike Beattie <michaelb@pavecon.com>
Cc: Derrick Thomas <DThomas@coppelltx.gov>
Subject: Fwd: Possible Damaged Sidewalk
Please see attached email.
Sent from my iPhone
Begin forwarded message:
From:
"Derrick Thomas" <DThomas@coppelltx.gov>
To:
"Matthew Mabry" <MMabry@coppelltx.gov>
Subject:Fwd: Possible Damaged Sidewalk
Matt,
Can you tell Pavecon not to drive over the new sidewalk on Travis with their loaded dump
trucks. Thanks
Sent from my iPhone
Begin forwarded message:
From:
"Shane Huffman" <shuffman_rkm@yahoo.com>
To:
"Derrick Thomas" <DThomas@coppelltx.gov>
Subject:Possible Damaged Sidewalk
1
Derrick
Attached are some pictures of a dump truck driving over our new sidewalk while loaded with dirt.
The truck is being loaded at the northwest corner of Travis and West Main.
2
3
4
5
This last pic is where the dirt is being loaded from
6
Regards,
Shane Huffman
214-236-5658
7