Spectrum-PT170322 (2)A copy of the approved permit must be on the job site at all times.
CC: Applicant T H = _ C i_ T _Y 0 f' Page 1 of 4
Public Works COPPELL
Permit File Rev. (16i2J1?
tom-+
a
Orig. to Project File
RIGHT-OF-WAY USE PERMIT APPLICATION
Permit valid for 90 calendar day: from date of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: 3-17`17 Applicant's Job # / Work Order # 14342 1
PERMIT FEE: $100.00
(No charge to Utility Companies with approved FranchiseIROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes r No
Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work)
Project Name/Location or address Kwik Pik 400 5 Denton Tap Rd
General Contractor GTA Contact# 972-329-9933
E-mail address to return permit mikeogardnerlti0 . com
Representative: Kevin Causey
Franchise Telephone#: 214-394-4281
Company:
E-mail address: Kevin. Causey@charter. cam
(for contact if neededlif e-mail of approved permit is desiredfpermit cannot be e-mailed unless complete)
Utility Company Represented:
(- Oncor Electric Delivery (^ Atmos Energy l^ Verizon C SBC/ AT&T
(e Time Warner Cable i- CoSery Electric/Gas (- Other
General Description of Work (in accordance with Ord, No. 2001-944): PLEASE ATTACH PLAN OF PROPOSED WORK
158' of new underground for new Spectrum service
Estimated Start Date 3 - 2 8 -1 7 Estimated Completion Date* 4 - 2 8 -1 7
* Completion requires submittal of Completion Verification Notice (see page 4)
Was contact made with City and/or utility companies to locate existing utilities?
if NO, Reason: Yes C` No
`r Is removal of existing streets, alleys, or sidewalks necessary? C` Yes if No
if YES, project must have City inspection prior to concrete replacement
Rieht-of-Wav Use Permit Pane 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Cappell, which
includes but is not limited to; Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices.
b P f affected mug be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155.
Any excavation requiring closing of a streetlailey must be reported prior to closing to the following:
Police Department (P 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972462-5150
Engineering Department 0 972-304-3679
YAttach barricade plan / trench safety plan if a lane or street closure is required.
NOTE. Street closures are allowed from 9.00 a.m. until 3:30 p.m. ONLY unless otherwise approved by City
Engineer.
:-Attach Work Order (franchise only) and/or 1 set of prints showing proposed work.
Locates for existing franchise utilities must be done 48 hours prior to beginning work.
For City utility locates, call 972-482-5155 to schedule 48 hours prior to beginning work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept. for approval prior to beginning work. Submittals by e-mail should go to en�aineer@-)ceppelftx.gov.
Printing your name indicates your acceptance of the terms and conditions of this form:
(if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.)
Kevin Causey 3-17-17
Signature of Utility Company Representative Date
Mike Hulvey
Signature of Contractor Representative
S'cat�La�Y�
Signature of City Representative
Comments
3-17-17
Date
22 March 2017
Date
NO TE: 1y
tify City Inspector at 972-304-3679 prior to beginning work and prier to
backfill for concrete, trench, ditch and open pit inspections. Backfill must meet
all construction standards approved by the City of Coppell.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or carne against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
T H a - C I T V . O F
COPPELL
„r
i TILiTY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
Page 3 of 4
1.A copy of the valid approved City of Coppell permit is required on the project at all times.
2.Notify adjacent property owners (commercial & residential) of project timeline; provide there with contact
manes and phone numbers.
2Proper erosion control measures must be taken.
!.Follow Texas MUTCD standards for work in traffic zones.
5.Sod is to be replaced when necessary.
6,1(rrigation repairs must be performed in a timely manner.
7.Follow OSHA recommended trench safety at all times.
,.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS
manholes.
9 Densities may be required in trench lines (ASTM).
I }t Care and repair of street signage is the responsibility of the contractor.
1,.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m.
),Prior notice of work activity on weekends and holidays must be in writing.
,] � .Line locates must be performed in advance by contacting -1 800 DIG TESS and/or the following:
CITY OF COPPELL UTILITIES DIVISION coppelltx gov/titiliiy-operatiions-divisicsl
9721462-5155
CITY OF COPPELL ENGINEERING DEPT.
972/304-3679
HOMEOWNER ASSOCIATIONS
9721 304-3678 (Planning Department)
TIME WARNER CABLE FEDERAL EMERGENCY MGMT. ADMIN.
2141324-5455 (Mike Rasmussen)
940/ 898-5138
AT&T LOCAL NETWORK
TEXAS COMM. on ENVIRONMENTAL QUALITY
214/ 215-3031 (Rich Miiienanan)
817/ 588-5800
COSERV Gas & Electric
DENTON CO. LEVEE DISTRICT
940/ 321-7800 x 7624 (Greg Ward)
214/ 352-5118 (Richard Hightower)
EXPLORER PIPELINE
Atmos Energy
9181493-5100 (Patrick Nwakoby)
972/360-4428 (Gary Dickinson)
ONCOR Electric Delivery
972/ 323-8917 (Larry Redick)
VERIZON COMMUNICATIONS
1 800 DIG TESS for line locates
9721318-5277
(344 -8377)
14.Contaminants must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clean of construction material and debris.
16. "Clean-up" requires returning work area to pre -project condition or better.
17. Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4)
T M i- C i T V • g F
COPPELL
�e _ _W q o
4 A a�
UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT
COMPLETION VERIFICATION NOTICE
Page 4 of 4
Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection
with Utility & Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name Spectrum
Project Location / Applicant's Work [Order # (if applicable) 1434211
404 S Denton Tap Rd
Sub -contractor Company Name Ventura
24 hr.Contact Number 214-991-5948
Date of Verification Appointment
Time of Verification Appointment
INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL
+3lnspected by
of Utilities Maintenance Division on
and found to be acceptable / not acceptable because
Follow-up needed? C Yes C No Follow-up scheduled for
❖Inspected by of Streets Maintenance Division on
and found to be acceptable / not acceptable because
Follow -tip needed? C Yes (- No Follow-up scheduled for
A copy of this completed notice can be provided to the
or e-mailed by using the button below;
City of Coppell Engineering Dept.
255 Parkway Blvd., Coppell TK 75019
Office. 972-304-3679 Fax: 972-304-3570
Submit by E-mail I Print Form
KWIK PIK
400 S DENTON TAP RD
COPPELL, TX
VICINITY MAP
)--7V7AN BEBBER OR
91ACKBURN 4R
PROJECT
LOCATION
BETHEL. SCHOOL RD
z
m o
c�
I
LJIfTl►
GENERAL PROJECT NOTES
1. ALL CONSTRUCTION WORK WITHIN THE PUBLIC RIGHT—OF—WAY SHALL BE DONE IN ACCORDANCE WITH THE
ORDINANCES AND REGULATIONS OF THE MUNICIPALITY IN WHICH THE WORK IS TO BE PERFORMED.
2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE.
UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND
LOCATION OF EACH PARTICULAR UTILITY. THE CONSTRUCTION CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR
ACTUAL LINE LOCATES IN THE FIELD AND THE PROTECTION OF ALL EXISTING FACILITIES WHETHER SHOWN OR NOT.
THE CONSTRUCTION CONTRACTOR SHALL ALSO ASSUME RESPONSIBILITY FOR REPAIRS TO ANY EXISTING FACILITY
DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE
DRAWINGS OR NOT.
3, THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE
MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK.
CALL BEFORE YOU OIG
811
IT'S THE LAW
4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TQ: A) PREVENT DAMAGE TO PRIVATE AND
PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION.
5, BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND
SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS
SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE
FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT
AND BARRICADED AT NIGHT.
6. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL. STATE AND LOCAL LAWS GOVERNING
EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH
ALL LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
ASPECTS OF WORK RELATED TO EXCAVATION..
7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN
THE STANDARD SPECIFICATIONS 5.8 "PORTLAND CEMENT CONCRETE PAVEMENT" AND 7.4.5 "QUALITY OF CONCRETE"
AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION — 2004. ALL OTHER CONCRETE SHALL BE CLASS A CONCRETE.
8. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT
CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT.
9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42" OF COVER, UNLESS OTHERWISE SPECIFIED.
10. ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 95% PROCTOR. THE REQUIRED
DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO
THE TYPE OF EQUIPMENT USED TO OBTAIN THE REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE
USED FOR BACKFILL.
LEGEND
-------1G-m PROPOSED CONDUIT
XX, BOR JGi✓ii� BORE UNDER CONCRETE
LEASE DUCT
�• .. r EXISTING TWC CONDUIT
r EXISTING CUSTOMER CONDUIT
PP OVERHEAD: NEW BUILD
PP�P#P OVERHEAD: OVERLASH
TYPICAL UTILITY CROSSING
EXISTING G AT CL
OF PROPOSED CONDUIT
-q - 24" MIN;
SEPARATION
EX. UTILITY
NOTED IN P
TYPICAL PAVEMENT BORE DETAIL
DRIVEWAY
CONDUIT AS
NOTED IN P
TRENCH DETAIL
NOT TO SCALE
TRENCH
GROUND UNE
WARNING TAPE BACKFILL TRENCH
CUSHION SAND WITH DEBRIS FREE
MATERIAL TAMPED
PLACE CONDUIT(S)TO 98% PROCTOR
AS. SPECIFIED
L {
}
}
i ml
1 4
STA. 0+00 UNE 'A' }
PLACE U -GUARD RISER } a
ON EXISTING POLE }
BEGIN UNDERGROUND I I
CON91' RORE
STRUCTION
j} / O
o}
CID LCLJ m
PROPCISED 2-2" HDPE } i cc 5
9 711 , Z
it
}
U
K
}
} 34'
CONCRETE PARKING
+oa
�UIG UG
CONCRETE PARKING} STA. 1+58 END LINE 'A'
PLACE WALL BOX
KWIK P'IK 92• . 24- x 24-
RISE ON BLDG. W/
400 S DENTON TAP RD GALVANIZED STEEL PIPE
PREPARED BY: ESTIMATED SHEET TOTALS NORTH
DESCRIPTION QUANTITY DESCRIPTION QUANTITY PROJECT: KWIK I P I I�
D TRENCH & PLACE CONDUIT 107` PLACE FLUSH MOUNT VAULT
�w BORE & PLACE CONDUIT 51' PLACE PEDESTAL T
BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET NOADDRESS: 4�0�-5+ DENTOT�1 TAP RD PULL THROUGH EXISTING CONDUIT PLACE POWER SUPPLY CITY. STATE: COPPELL, IA
R & R CONCRETE SIDEWALK (SF) PLACE WALL BOX & RISER 1
R & R CONCRETE PAVEMENT (SF) PLACE U -GUARD RISER 1 SHEET HORIZONTAL SCALE VERTICAL SCALE JOE3 NUMBER DATE:
DFWT HATIOr: OF 1" = 40 1" = 10' DID -1434211 03-16-2017
DAVID HATEDN 472.670.21 13 AERIAL: OVERLASH OVERHEAD: NEW BUILD
%LST11 G
AT CL
VAN BEBBER DR
PROPOSED
ONDUIT
VARL&BLE R.O.W.
N
ra
• RCP
-
- CONDUIT
24«. MI
N..
- NOTED- IN
PLAN
SEPA
TION
CONCRETE PARKING
+oa
�UIG UG
CONCRETE PARKING} STA. 1+58 END LINE 'A'
PLACE WALL BOX
KWIK P'IK 92• . 24- x 24-
RISE ON BLDG. W/
400 S DENTON TAP RD GALVANIZED STEEL PIPE
PREPARED BY: ESTIMATED SHEET TOTALS NORTH
DESCRIPTION QUANTITY DESCRIPTION QUANTITY PROJECT: KWIK I P I I�
D TRENCH & PLACE CONDUIT 107` PLACE FLUSH MOUNT VAULT
�w BORE & PLACE CONDUIT 51' PLACE PEDESTAL T
BORE & PLACE STEEL CASING PLACE FLUSH DROP BUCKET NOADDRESS: 4�0�-5+ DENTOT�1 TAP RD PULL THROUGH EXISTING CONDUIT PLACE POWER SUPPLY CITY. STATE: COPPELL, IA
R & R CONCRETE SIDEWALK (SF) PLACE WALL BOX & RISER 1
R & R CONCRETE PAVEMENT (SF) PLACE U -GUARD RISER 1 SHEET HORIZONTAL SCALE VERTICAL SCALE JOE3 NUMBER DATE:
DFWT HATIOr: OF 1" = 40 1" = 10' DID -1434211 03-16-2017
DAVID HATEDN 472.670.21 13 AERIAL: OVERLASH OVERHEAD: NEW BUILD