Wrangler Olympus-CR170227
Halie Hernandez
From:Matthew Mabry
Sent:Tuesday, February 28, 2017 8:13 AM
To:Halie Hernandez
Subject:Wrangler Beltline signal daily report
Categories:This message has been archived by Retain on February 28 2017 17:41
PROJECT Wrangler/Beltline signal
PROJECT NO.
OWNER CITY of COPPELL
CONTRACTOR Lacy
PROJECT INSPECTOR Matthew Mabry
DAILY CONSTRUCTION REPORT
DATE 2-27-2017 REPORT #1
DAY M T W T F S S
Weather:
Temp:
Humidity:
Wind:
AVERAGE FIELD FORCE
NAME OF CONTRACTOR NON-MANUAL MANUAL REMARKS
VISITORS
TIME REPRESENTATIVE REPRESENTING REMARKS
EQUIPMENT AT THE SITE:
1
CONSTRUCTION ACTIVITIES:
Cody Wildoner and I met with paving, developer, and signal contractor on site to discuss drainage issues and the existing signal wires that are in
the way. I told the contractor and developer that I would send them the original plans for Belt line road to answer any of their questions about
the current drainage and inlets that do not show up on GIS
SIGNATURE
PUBLIC WORKS INSPECTOR: MATTHEW MABRY
Matthew Mabry
Engineering Construction Inspector
City of Coppell, TX
214-406-5223 (cell)
www.coppelltx.gov